• 2:1 rope block beam clamps lifting 6000 lb - beam load CORRECT ANSWER: 9000 lb
• Tool to assemble 3-piece hydro jack CORRECT ANSWER: Strap wrench
• Wye and delta relays pick up same time - what should prevent this? CORRECT
ANSWER: Walking beam
• How many cubic inches in a gallon? CORRECT ANSWER: 231 in³ = 1 gal
• Questionable barricade 42nd floor - what do? CORRECT ANSWER: Write report →
GC/Super
• "Sill-to-sill" measurement 1.75″ - how much to be compliant? CORRECT ANSWER: ≈
-0.50″ adjustment
• Formula for T₍c₎ (time constant) CORRECT ANSWER: T = R × C
• Moving controller 30 ft → voltage drop fix? CORRECT ANSWER: Use larger wires
• Temp-run buttons must run car at what speed? CORRECT ANSWER: Leveling speed
• NEC clearance in front of controller CORRECT ANSWER: 36 inches minimum
working space
• After VVVF drive power off CORRECT ANSWER: Check capacitors for charge
• 2:1 rope block beam-clamped lifting 6 000 lb load - beam load? CORRECT ANSWER:
18 000 lb (Section 210 Fig 33)
• Sill guard equals what? CORRECT ANSWER: Leveling-zone distance + 3″
• Relief valve setting CORRECT ANSWER: 150 % working pressure
• Diode reading 7.43 V across transistor - good? CORRECT ANSWER: Yes, ≈ 0.7 V
drop
• Who must provide MSDS sheet? CORRECT ANSWER: Employer
• After installing governor, next step CORRECT ANSWER: Install tension sheave &
rope
• Faulty relay—spring under armature missing—effect? CORRECT ANSWER:
,Armature may hang due to residual magnetism
• Fire-extinguisher aim point CORRECT ANSWER: At base of fire
• Proper door height to saddle CORRECT ANSWER: ¼″ min - ⅜″ max
• Minimum clearance between controllers CORRECT ANSWER: 24 inches (NEC 620 /
NEIEP Code Standard)
• Sensors on vertical lift CORRECT ANSWER: Min 2 @ 15 lb within 2″ down
• 4 rope rigging - best angle CORRECT ANSWER: 60°
• mm → inch conversion CORRECT ANSWER: 25.4 mm = 1″
• Step-level switch prevents what? CORRECT ANSWER: Wreck from broken rollers
• Residential elevator needs escape hatch when? CORRECT ANSWER: If manual
operation not provided
• Current in a parallel circuit CORRECT ANSWER: Sum of branch currents
• Where to check after resetting step level switch CORRECT ANSWER: Stepband of
upper and lower truss
• Ohm's Law abbreviations CORRECT ANSWER: I = Current, E = Volts, R =
Resistance, P = Power
• Formula for watts (Ohm's Law Power) CORRECT ANSWER: P = E × I
• When safeties required on counterweight CORRECT ANSWER: If occupied space
below
• Gate switch on center-opening doors must make up at what? CORRECT ANSWER:
2″
• In on-delay circuits, what charges first? CORRECT ANSWER: Capacitor
, • UDT relay burnt - replace with? CORRECT ANSWER: DC relay (shaded triangle =
DC)
• Where to check after resetting a step level switch? CORRECT ANSWER: Stepband
of upper & lower truss
• Spider bob purpose CORRECT ANSWER: Locates plumbing holes
• Freight doors hanging on one side - first step CORRECT ANSWER: Turn off power
(freight doors have own disconnect)
• Width of working space CORRECT ANSWER: ≥ 30 in or equipment width
• Dumbwaiter returns with load still on it - cause CORRECT ANSWER: Bad non-
reversal timer or bad access switch
• Omega rail out of alignment—why? CORRECT ANSWER: Over-tightened splice
• 230 V motor replaced on 460 V source - correct unit CORRECT ANSWER: 1000 W
2:1 step-down transformer
• Hydro installation - first before pit equipment CORRECT ANSWER: Guide rails
• 4″ plunger × 25 ft travel → oil volume CORRECT ANSWER: ≈ 16.3 gal
• Before mounting motor to bed plates - drill which hole first? CORRECT ANSWER:
Secondary sheave
• Best source for solvent safety info CORRECT ANSWER: SDS (Safety Data Sheet)
• Traveler-cable hanging formula CORRECT ANSWER: 30 × diameter
• 480→240 V 3-φ rectifier output CORRECT ANSWER: ≈ 320 V DC
• 480 VAC step-down 240 VAC → 3-phase rectifier output CORRECT ANSWER: ≈ 320
V DC
• What type of oil is in a sleeve bearing? CORRECT ANSWER: Single-viscosity oil
• Conduit type for wet locations CORRECT ANSWER: Liquid-tight flexible conduit
• Normal limit suspect faulty - how to test? CORRECT ANSWER: Kill main line & check
WITH COMPLETE ANSWERS (100%
ACCURATE)
• 2:1 rope block beam clamps lifting 6000 lb - beam load CORRECT ANSWER: 9000 lb
• Tool to assemble 3-piece hydro jack CORRECT ANSWER: Strap wrench
• Wye and delta relays pick up same time - what should prevent this? CORRECT
ANSWER: Walking beam
• How many cubic inches in a gallon? CORRECT ANSWER: 231 in³ = 1 gal
• Questionable barricade 42nd floor - what do? CORRECT ANSWER: Write report →
GC/Super
• "Sill-to-sill" measurement 1.75″ - how much to be compliant? CORRECT ANSWER: ≈
-0.50″ adjustment
• Formula for T₍c₎ (time constant) CORRECT ANSWER: T = R × C
• Moving controller 30 ft → voltage drop fix? CORRECT ANSWER: Use larger wires
• Temp-run buttons must run car at what speed? CORRECT ANSWER: Leveling speed
• NEC clearance in front of controller CORRECT ANSWER: 36 inches minimum
working space
• After VVVF drive power off CORRECT ANSWER: Check capacitors for charge
• 2:1 rope block beam-clamped lifting 6 000 lb load - beam load? CORRECT ANSWER:
18 000 lb (Section 210 Fig 33)
• Sill guard equals what? CORRECT ANSWER: Leveling-zone distance + 3″
• Relief valve setting CORRECT ANSWER: 150 % working pressure
• Diode reading 7.43 V across transistor - good? CORRECT ANSWER: Yes, ≈ 0.7 V
drop
• Who must provide MSDS sheet? CORRECT ANSWER: Employer
• After installing governor, next step CORRECT ANSWER: Install tension sheave &
rope
• Faulty relay—spring under armature missing—effect? CORRECT ANSWER:
,Armature may hang due to residual magnetism
• Fire-extinguisher aim point CORRECT ANSWER: At base of fire
• Proper door height to saddle CORRECT ANSWER: ¼″ min - ⅜″ max
• Minimum clearance between controllers CORRECT ANSWER: 24 inches (NEC 620 /
NEIEP Code Standard)
• Sensors on vertical lift CORRECT ANSWER: Min 2 @ 15 lb within 2″ down
• 4 rope rigging - best angle CORRECT ANSWER: 60°
• mm → inch conversion CORRECT ANSWER: 25.4 mm = 1″
• Step-level switch prevents what? CORRECT ANSWER: Wreck from broken rollers
• Residential elevator needs escape hatch when? CORRECT ANSWER: If manual
operation not provided
• Current in a parallel circuit CORRECT ANSWER: Sum of branch currents
• Where to check after resetting step level switch CORRECT ANSWER: Stepband of
upper and lower truss
• Ohm's Law abbreviations CORRECT ANSWER: I = Current, E = Volts, R =
Resistance, P = Power
• Formula for watts (Ohm's Law Power) CORRECT ANSWER: P = E × I
• When safeties required on counterweight CORRECT ANSWER: If occupied space
below
• Gate switch on center-opening doors must make up at what? CORRECT ANSWER:
2″
• In on-delay circuits, what charges first? CORRECT ANSWER: Capacitor
, • UDT relay burnt - replace with? CORRECT ANSWER: DC relay (shaded triangle =
DC)
• Where to check after resetting a step level switch? CORRECT ANSWER: Stepband
of upper & lower truss
• Spider bob purpose CORRECT ANSWER: Locates plumbing holes
• Freight doors hanging on one side - first step CORRECT ANSWER: Turn off power
(freight doors have own disconnect)
• Width of working space CORRECT ANSWER: ≥ 30 in or equipment width
• Dumbwaiter returns with load still on it - cause CORRECT ANSWER: Bad non-
reversal timer or bad access switch
• Omega rail out of alignment—why? CORRECT ANSWER: Over-tightened splice
• 230 V motor replaced on 460 V source - correct unit CORRECT ANSWER: 1000 W
2:1 step-down transformer
• Hydro installation - first before pit equipment CORRECT ANSWER: Guide rails
• 4″ plunger × 25 ft travel → oil volume CORRECT ANSWER: ≈ 16.3 gal
• Before mounting motor to bed plates - drill which hole first? CORRECT ANSWER:
Secondary sheave
• Best source for solvent safety info CORRECT ANSWER: SDS (Safety Data Sheet)
• Traveler-cable hanging formula CORRECT ANSWER: 30 × diameter
• 480→240 V 3-φ rectifier output CORRECT ANSWER: ≈ 320 V DC
• 480 VAC step-down 240 VAC → 3-phase rectifier output CORRECT ANSWER: ≈ 320
V DC
• What type of oil is in a sleeve bearing? CORRECT ANSWER: Single-viscosity oil
• Conduit type for wet locations CORRECT ANSWER: Liquid-tight flexible conduit