A+ VERIFIED
Louisiana Hvacr Contractor Exam Questionbook With - Answers And
Rationales Latest Update This Year.pdf 147 Questions
Clinical | Rationale-Driven - Pass Guaranteed - A+ Graded
147 1 147
QUESTIONS SECTIONS RATIONALES
WHAT THIS COVERS
01 HVACR Contracting - Louisiana State Licensing Board for Contractors
02 HVACR system design
03 Load calculations
04 Mechanical
05 Fuel gas code compliance
06 Electrical/controls
ABOUT THIS ASSESSMENT
This exam evaluates candidates on Louisiana contractor licensing law, HVACR system design and load calculations, mechanical
and fuel gas code compliance, electrical/controls, refrigerant handling under EPA Section 608, estimating, and jobsite safety.
Questions require synthesis of code provisions, ASHRAE standards, and field application at a master-contractor level.
,EXAMINATION QUESTIONS
SECTION 1 - HVACR Contracting - Louisiana State Licensing Board for Contractors
(Questions 1 to 147)
1. For a building at 5000 ft elevation, which adjustment is required for gas furnace input rating?
A. Increase manifold pressure 4% per 1000 ft
B. Derate input 4% per 1000 ft above sea level
C. No adjustment needed below 6000 ft
D. Increase combustion air by 10%
Answer: B [Concept: HVACR Contracting - Louisiana State Licensing Board for Contractors]
Rationale: Gas-fired appliances must be derated approximately 4% for each 1000 ft above sea level due to reduced oxygen density;
increasing manifold pressure would overfire the unit. Adjustments are required above 2000 ft, so no-adjustment options are incorrect.
2. A 3-ton split system has 0.30 in. w.c. external static; what does excessive return-side pressure drop most likely
indicate?
A. Undersized or restrictive return duct/filter, reducing airflow and capacity.
B. Overcharged refrigerant causing high head pressure.
C. A failed compressor valve.
D. A stuck reversing valve.
Answer: A [Concept: HVACR Contracting - Louisiana State Licensing Board for Contractors]
Rationale: High external static on the return side points to restrictive return ductwork, undersized filters, or blocked grilles, which
reduce airflow and evaporator capacity. Refrigerant charge, compressor valves, and reversing valves affect the refrigerant circuit, not
static pressure distribution.
3. When must an HVACR contractor provide the Louisiana State Licensing Board with notice of a change in business
address?
A. Within 10 days of the change
B. Within 30 days of the change
C. Within 45 days of the change
D. Within 60 days of the change
Answer: B [Concept: HVACR Contracting - Louisiana State Licensing Board for Contractors]
Rationale: Louisiana rules require licensees to notify the Board in writing within 30 days of any change in business address or trade
name. The other timeframes are incorrect and would not satisfy the regulatory requirement.
4. A Louisiana mechanical contractor bids a public school HVAC replacement. Which Louisiana bid-law requirement
most affects the bid's validity?
A. Bid must be accompanied by a bid bond of at least 5% of the base bid.
B. Bidder must hold a Louisiana license in the classification of the work at the time of bid opening.
C. Bid must be notarized by a Louisiana-commissioned notary and sealed.
D. Bidder must submit a Louisiana Department of Revenue tax clearance certificate with the bid.
Answer: B [Concept: HVACR Contracting - Louisiana State Licensing Board for Contractors]
Rationale: Louisiana public bid law (R.S. 37:2163 and LSLBC rules) requires the bidder to be properly licensed in the classification of
work at the time of bid opening; an unlicensed bid is invalid. A bid bond is typically 5% but its absence may be curable and is not the
licensing-validity issue. Notarization and tax clearance are not universal bid-opening validity requirements.
Page 2 | Louisiana Hvacr Contractor Exam Questionbook With - Answers And Rationales Latest Update This Year.pdf 147 Questions
, 5. Under Louisiana contractor law, which action most clearly triggers licensure for an HVACR project?
A. Submitting a bid of $50,000 for HVAC installation
B. Performing HVAC repairs billed at $10,000
C. Offering to contract for HVAC work regardless of price
D. Providing HVAC maintenance under a $5,000 annual contract
Answer: C [Concept: HVACR Contracting - Louisiana State Licensing Board for Contractors]
Rationale: Louisiana licensing law applies to any person who contracts or offers to contract for construction, including HVACR,
regardless of project value; bidding or performing alone may not trigger licensure if no contract is offered, but offering to contract is
the clearest trigger. The other options describe activities that may not constitute 'contracting' under the statute unless an offer to
contract is made.
6. A 240V single-phase motor draws 10A. What is its apparent power?
A. 24 VA
B. 240 VA
C. 2400 VA
D. 24,000 VA
Answer: C [Concept: HVACR Contracting - Louisiana State Licensing Board for Contractors]
Rationale: Apparent power S = V × I = 240 V × 10 A = 2400 VA. The other values misapply the formula by factors of 10 or 100.
7. A technician must evacuate a system to 500 microns. Which practice ensures compliance with EPA Section 608?
A. Triple evacuation without a micron gauge
B. Using a manifold gauge set alone to verify vacuum
C. Evacuating to 500 microns and holding for 10 minutes with a micron gauge
D. Flushing with nitrogen and checking for leaks with soap bubbles
Answer: C [Concept: HVACR Contracting - Louisiana State Licensing Board for Contractors]
Rationale: EPA 608 requires evacuation to a specified micron level (e.g., 500 microns) and holding to verify no rise, using a micron
gauge. Manifold gauges (B) are insufficient for deep vacuum; A lacks verification; D is a leak test, not evacuation.
8. Per OSHA 1926.501, at what height must fall protection be provided for HVACR roof work?
A. 4 feet
B. 6 feet
C. 10 feet
D. 15 feet
Answer: B [Concept: HVACR Contracting - Louisiana State Licensing Board for Contractors]
Rationale: OSHA 29 CFR 1926.501(b)(1) requires fall protection at 6 feet or more above a lower level for construction work,
including HVACR roof installations. The other heights are not the general construction trigger.
9. A heat pump in heating mode shows low suction pressure, low head pressure, and low superheat. Which fault best
fits?
A. Restricted liquid line causing flash gas at the metering device.
B. Undercharge causing low superheat and low pressures.
C. Reversing valve leaking internally between high and low sides.
D. Outdoor fan failure causing high head pressure and high superheat.
Answer: B [Concept: HVACR Contracting - Louisiana State Licensing Board for Contractors]
Rationale: Undercharge produces low suction and head pressures with low superheat as the evaporator starves. A liquid-line restriction
typically raises superheat and lowers subcooling. A leaking reversing valve equalizes pressures and raises suction pressure. Outdoor
fan failure raises head pressure and superheat, not lowers them.
Page 3 | Louisiana Hvacr Contractor Exam Questionbook With - Answers And Rationales Latest Update This Year.pdf 147 Questions