North Carolina Intermediate Electrical Contractor Licensing Exam
2026 | Instant Download | Complete Practice Examination with
Original Questions, Verified Answers and Detailed Rationales | 2020
NEC, NFPA 72, Electrical Laws and Business Practices, Grounding
and Bonding, Load Calculations, Wiring Methods, Overcurrent
Protection, Service Equipment, Motors, Hazardous Locations and
Electrical Safety
DOMAIN 1: LAWS, RULES, BASIC BUSINESS PRACTICES, AND PRACTICAL APPLICATIONS
(Questions 1–32)
Question 1
A general contractor offers an intermediate electrical contractor a project valued at
$165,000. What is the most accurate statement regarding the contractor's authority?
A. The contractor may accept because the intermediate limit is $200,000.
B. The contractor may accept if the electrical portion is less than $150,000.
C. The contractor may accept only if the Board grants a special variance.
D. The contractor may not accept because the intermediate single-project limit is $150,000.
Correct Answer: D
Explanation: The intermediate classification limits a single project to $150,000; exceeding
that ceiling violates licensing law and can trigger disciplinary action.
,Question 2
An applicant for the intermediate examination has 5,500 hours of total experience, including
5,100 primary hours. Which statement best describes eligibility?
A. Eligible, because primary hours exceed 5,000.
B. Eligible, because total hours exceed 5,000.
C. Not eligible, because total experience must be 5,750 hours.
D. Not eligible, because secondary experience cannot count at all.
Correct Answer: C
Explanation: The intermediate classification requires 5,750 total hours, of which 5,000 must
be primary; 5,500 total hours is insufficient.
Question 3
A licensed intermediate contractor allows an unlicensed employee to submit a bid and sign a
contract in the contractor's name. Which principle is most directly implicated?
A. The listed qualified individual must supervise and direct electrical contracting.
B. Bid submission is always exempt from licensing law.
C. Employees may sign contracts if the contractor reviews them later.
D. Only unlimited contractors must supervise contracts.
Correct Answer: A
Explanation: The licensed qualified individual must supervise and direct the contracting
work; delegating contract execution to an unlicensed person undermines that statutory duty.
Question 4
,A contractor is preparing a bid for a commercial tenant upfit. Which business practice best
reduces the risk of a dispute over scope?
A. Relying on a verbal understanding with the tenant.
B. Excluding all written clarifications to keep the bid low.
C. Submitting a written scope with inclusions, exclusions, and assumptions.
D. Using the lowest-priced supplier without confirming submittals.
Correct Answer: C
Explanation: A written scope with inclusions, exclusions, and assumptions is a best practice
because it aligns expectations and creates a record if scope disputes arise.
Question 5
Under NC licensing law, which action most likely constitutes unlicensed electrical
contracting?
A. A licensed contractor performing emergency repairs after a storm.
B. An unlicensed person installing a receptacle for compensation on a commercial job.
C. A licensed contractor bidding on a project valued at $140,000.
D. A licensed contractor supervising an apprentice.
Correct Answer: B
Explanation: Performing electrical work for compensation without a license is unlicensed
contracting, even on a single commercial receptacle installation.
Question 6
A contractor discovers that a project owner has failed to pay a properly perfected
mechanics' lien. What is the best first step under NC lien law principles?
A. Ignore the lien because electrical contractors have no lien rights.
, B. File a lawsuit immediately without reviewing the lien claim.
C. Consult the lien statute and verify deadlines and claim accuracy.
D. Record a new deed on the property.
Correct Answer: C
Explanation: Lien enforcement is deadline-sensitive; the contractor should verify statutory
deadlines, claim accuracy, and proper perfection before legal action.
Question 7
Which record is most important for demonstrating that a contractor's employee received
required safety training?
A. A signed job application.
B. A training log with dates, topics, and attendee signatures.
C. A supplier invoice for personal protective equipment.
D. A copy of the NEC.
Correct Answer: B
Explanation: A training log with dates, topics, and signatures provides verifiable
documentation that required safety instruction was delivered and received.
Question 8
A contractor's bid includes a 10% contingency, but the owner demands a fixed lump sum
with no contingency. What is the most prudent business response?
A. Remove the contingency and absorb all unknown risk.
B. Clarify assumptions and request a change order process for unknowns.
C. Refuse to bid on any fixed-price project.
D. Increase the electrical scope without informing the owner.
2026 | Instant Download | Complete Practice Examination with
Original Questions, Verified Answers and Detailed Rationales | 2020
NEC, NFPA 72, Electrical Laws and Business Practices, Grounding
and Bonding, Load Calculations, Wiring Methods, Overcurrent
Protection, Service Equipment, Motors, Hazardous Locations and
Electrical Safety
DOMAIN 1: LAWS, RULES, BASIC BUSINESS PRACTICES, AND PRACTICAL APPLICATIONS
(Questions 1–32)
Question 1
A general contractor offers an intermediate electrical contractor a project valued at
$165,000. What is the most accurate statement regarding the contractor's authority?
A. The contractor may accept because the intermediate limit is $200,000.
B. The contractor may accept if the electrical portion is less than $150,000.
C. The contractor may accept only if the Board grants a special variance.
D. The contractor may not accept because the intermediate single-project limit is $150,000.
Correct Answer: D
Explanation: The intermediate classification limits a single project to $150,000; exceeding
that ceiling violates licensing law and can trigger disciplinary action.
,Question 2
An applicant for the intermediate examination has 5,500 hours of total experience, including
5,100 primary hours. Which statement best describes eligibility?
A. Eligible, because primary hours exceed 5,000.
B. Eligible, because total hours exceed 5,000.
C. Not eligible, because total experience must be 5,750 hours.
D. Not eligible, because secondary experience cannot count at all.
Correct Answer: C
Explanation: The intermediate classification requires 5,750 total hours, of which 5,000 must
be primary; 5,500 total hours is insufficient.
Question 3
A licensed intermediate contractor allows an unlicensed employee to submit a bid and sign a
contract in the contractor's name. Which principle is most directly implicated?
A. The listed qualified individual must supervise and direct electrical contracting.
B. Bid submission is always exempt from licensing law.
C. Employees may sign contracts if the contractor reviews them later.
D. Only unlimited contractors must supervise contracts.
Correct Answer: A
Explanation: The licensed qualified individual must supervise and direct the contracting
work; delegating contract execution to an unlicensed person undermines that statutory duty.
Question 4
,A contractor is preparing a bid for a commercial tenant upfit. Which business practice best
reduces the risk of a dispute over scope?
A. Relying on a verbal understanding with the tenant.
B. Excluding all written clarifications to keep the bid low.
C. Submitting a written scope with inclusions, exclusions, and assumptions.
D. Using the lowest-priced supplier without confirming submittals.
Correct Answer: C
Explanation: A written scope with inclusions, exclusions, and assumptions is a best practice
because it aligns expectations and creates a record if scope disputes arise.
Question 5
Under NC licensing law, which action most likely constitutes unlicensed electrical
contracting?
A. A licensed contractor performing emergency repairs after a storm.
B. An unlicensed person installing a receptacle for compensation on a commercial job.
C. A licensed contractor bidding on a project valued at $140,000.
D. A licensed contractor supervising an apprentice.
Correct Answer: B
Explanation: Performing electrical work for compensation without a license is unlicensed
contracting, even on a single commercial receptacle installation.
Question 6
A contractor discovers that a project owner has failed to pay a properly perfected
mechanics' lien. What is the best first step under NC lien law principles?
A. Ignore the lien because electrical contractors have no lien rights.
, B. File a lawsuit immediately without reviewing the lien claim.
C. Consult the lien statute and verify deadlines and claim accuracy.
D. Record a new deed on the property.
Correct Answer: C
Explanation: Lien enforcement is deadline-sensitive; the contractor should verify statutory
deadlines, claim accuracy, and proper perfection before legal action.
Question 7
Which record is most important for demonstrating that a contractor's employee received
required safety training?
A. A signed job application.
B. A training log with dates, topics, and attendee signatures.
C. A supplier invoice for personal protective equipment.
D. A copy of the NEC.
Correct Answer: B
Explanation: A training log with dates, topics, and signatures provides verifiable
documentation that required safety instruction was delivered and received.
Question 8
A contractor's bid includes a 10% contingency, but the owner demands a fixed lump sum
with no contingency. What is the most prudent business response?
A. Remove the contingency and absorb all unknown risk.
B. Clarify assumptions and request a change order process for unknowns.
C. Refuse to bid on any fixed-price project.
D. Increase the electrical scope without informing the owner.