100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

APPLIED DECISION METHODS GBA 334-Final Exam-Saint Leo University-2018.-APLUS Graded Solutions

Rating
-
Sold
-
Pages
13
Grade
A+
Uploaded on
02-09-2021
Written in
2021/2022

APPLIED DECISION METHODS GBA 334-Final Exam-Saint Leo University-2018.APPLIED DECISION METHODS GBA 334-Final Exam-Saint Leo University-2018.-APLUS Graded SolutionsQuestion 2 2 / 2 points The first step in planning and scheduling a project is to develop the . PERT/CPM network diagram work breakdown structure variance calculations for each activity employee scheduling plan critical pathdestination, then this situation is known as a(n) . transshipment problem intermediate point problem assignment problem None of the above transportation problemBank Boston has a branch at Bryant College. The branch is busiest at the beginning of the college year when freshmen and transfer students open accounts. This year, freshmen arrived at the office at a rate of 40 per day (assume 8-hour days). On average, it takes the Bank Boston staff person about ten minutes to process each account application. The bank is considering having one or two tellers. Each teller is paid $12 per hour and the cost of waiting in line is assumed to be $8 per hour. What is the average number of people waiting to open accounts? 3.27 5.83 4.16 5.27A widely used mathematical programming technique designed to help managers and decision making relative to resource allocation is called . None of the above constraint programming goal programming linear programming computer programmingA company can decide how many additional labor hours to acquire for a given week. Subcontractor workers will only work a maximum of 20 hours a week. The company must produce at least 200 units of product A, 300 units of product B, and 400 units of product C. In 1 hour of work, worker 1 can produce 15 units of product A, 10 units of product B, and 30 units of product C. Worker 2 can produce 5 units of product A, 20 units of product B, and 35 units of product C. Worker 3 can produce 20 units of product A, 15 units of product B, and 25 units of product C. Worker 1 demands a salary of $50/hr, worker 2 demands a salary of $40/hr, and worker 3 demands a salary of $45/hr. The company must choose how many hours they should contract with each worker to meet their production requirements and minimize labor cost. Assuming this is a linear programming problem, which of the following is the objective function? Minimize 40X1 + 45X2 + 50X3 Maximize 40X1 + 45X2 + 50X3 Maximize 50X1 + 40X2 + 45X3 Minimize 50X1 + 40X2 + 45X3

Show more Read less









Whoops! We can’t load your doc right now. Try again or contact support.

Document information

Uploaded on
September 2, 2021
Number of pages
13
Written in
2021/2022
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Sturdydrone Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
888
Member since
4 year
Number of followers
637
Documents
1804
Last sold
4 days ago
Prof.Exams

I am a microbiologist, study and support expert with experienced support in training an professional exams related to the biological field. For any queries do not hesitate to inbox me.

4.0

140 reviews

5
78
4
21
3
19
2
6
1
16

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions