Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 9 pages
Exam (elaborations)

MAR 3203 EXAM 2 STUDY GUIDE UPDATED ACTUAL QUESTIONS AND CORRECT ANSWERS

Document preview thumbnail
Preview 2 out of 9 pages

MAR 3203 EXAM 2 STUDY GUIDE UPDATED ACTUAL QUESTIONS AND CORRECT ANSWERS

Content preview

MAR 3203 EXAM 2 STUDY GUIDE UPDATED ACTUAL
QUESTIONS AND CORRECT ANSWERS
Question:
MAR 3203 EXAM 2 STUDY GUIDE
AND CORRECT ANSWERS
are used when two activities have identical
Dummy activities
1
Critical path activities
3




Answer:
UPDATED ACTUAL QUESTIONS
starting and ending events

, Parallel activities
2
Milestone activities
4

Question:
An activity has an optimistic time of 15 days, a most likely
time of 18 days, and a pessimistic time of 27 days. What is
the expected time?
Answer:
19 days

Question:
Activity A has duration 5 and an early start of 6. Activity B
has duration 7 and an early start of 5. Both A and B are
the predecessors of activity C, which has a duration of 9.
What is the early finish time for activity C?
Answer:
21

Question:
An activity has an optimistic time of 11 days, a most likely
time of 15 days, and a pessimistic time of 23 days. What is
its variance?
Answer:
4

Question:
Consider the project composed of these six activities
with the early and late start and finish times as shown in
the table. What is the critical path for the project?
Activity ES EF LS LF A 0 7 0 7 B 08 1 9 C 7 18 7 18 D 0 6 2 8
E 8 17 9 18 F 6 16 8 18
Answer:
AC

Question:
An activity on a PERT network has these time estimates:
optimistic = 2, most likely = 5, and pessimistic = 10. Its
expected time is:
Answer:
5.33

Question:
Which of these pairs is in (top, bottom) order in
accordance with WBS?
Answer:

Document information

Uploaded on
September 2, 2026
Number of pages
9
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Briwisescore
3.0
(1)
Sold
28
Followers
5
Items
16935
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions