100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

OSCM 373 CHAPTER 16 SCHEDULING EXAM QUESTIONS WITH CORRECT ANSWERS LATEST UPDATE 2026

Rating
-
Sold
-
Pages
7
Grade
A+
Uploaded on
01-02-2026
Written in
2025/2026

OSCM 373 CHAPTER 16 SCHEDULING EXAM QUESTIONS WITH CORRECT ANSWERS LATEST UPDATE 2026 What is the best definition of scheduling from among the options given? -A sub-department of production control in charge of manufacturing timing and resource allocation. -Setting up appointments, allocating room use in service industry organizations. -Establishing the timing of the use of equipment, facilities, and human activities in an organization. - Answers -Establishing the timing of the use of equipment, facilities, and human activities in an organization. The objectives of scheduling require trade-offs among sometimes conflicting goals, such as efficiently utilizing _____ while minimizing ______. (Multiple select) equipment; inventories equipment; facilities staff; customer waiting time - Answers equipment; inventories staff; customer waiting time What is the goal of a high-volume system? High rate of customization of goods and services Low rate of flow of goods and services High utilization of labor and equipment - Answers High utilization of labor and equipment Select all of the factors which contribute to the success of high-volume systems. (Multiple select) Preventative maintenance Product or service design Minimization of quality problems Supplier delivery delays - Answers -preventative maintenance -product or service design -minimization of quality problems Compared to a job shop, the batch sizes in intermediate-volume systems are ___________. equal larger smaller - Answers larger Which of the following statements about scheduling are correct? (Multiple select) -Scheduling decisions are wide in scope and latitude. -Scheduling is constrained by prior decisions such as capacity & aggregate planning. -Scheduling decisions are the final step in the transformation process. - Answers -Scheduling decisions are wide in scope and latitude. -Scheduling is constrained by prior decisions such as capacity & aggregate planning. What are some of the objectives of effective scheduling? (Multiple select) -Less marketing required for products -Increase productivity -Yield cost savings -Better customer service - Answers -Increase productivity -Yield cost savings -Better customer service Scheduling in high-volume systems is known by what term? Line balancing Flow-shop scheduling Rapid-flow scheduling Job-shop scheduling - Answers Flow-shop scheduling Select all of the factors which contribute to the success of high-volume systems. (Multiple select) -Rapid repair when breakdowns occur -Minimization of quality problems -Lowest cost suppliers -Optimal product mixes - Answers -Rapid repair when breakdowns occur -Minimization of quality problems -Optimal product mixes Which word below most accurately describes the processing involved in intermediate-volume systems. continuous made-to-order intermittent - Answers intermittent The model often used to determine the ideal run size is know as the _________________ run size model. batch linear economic optimal - Answers economic

Show more Read less
Institution
OSCM 373
Course
OSCM 373

Content preview

OSCM 373 CHAPTER 16 SCHEDULING EXAM QUESTIONS WITH CORRECT ANSWERS LATEST UPDATE
2026

What is the best definition of scheduling from among the options given?

-A sub-department of production control in charge of manufacturing timing and resource allocation.
-Setting up appointments, allocating room use in service industry organizations.
-Establishing the timing of the use of equipment, facilities, and human activities in an organization. -
Answers -Establishing the timing of the use of equipment, facilities, and human activities in an
organization.
The objectives of scheduling require trade-offs among sometimes conflicting goals, such as efficiently
utilizing _____ while minimizing ______.
(Multiple select)

equipment; inventories
equipment; facilities
staff; customer waiting time - Answers equipment; inventories
staff; customer waiting time
What is the goal of a high-volume system?

High rate of customization of goods and services
Low rate of flow of goods and services
High utilization of labor and equipment - Answers High utilization of labor and equipment
Select all of the factors which contribute to the success of high-volume systems. (Multiple select)

Preventative maintenance
Product or service design
Minimization of quality problems
Supplier delivery delays - Answers -preventative maintenance
-product or service design
-minimization of quality problems
Compared to a job shop, the batch sizes in intermediate-volume systems are ___________.

equal
larger
smaller - Answers larger
Which of the following statements about scheduling are correct? (Multiple select)

-Scheduling decisions are wide in scope and latitude.
-Scheduling is constrained by prior decisions such as capacity & aggregate planning.
-Scheduling decisions are the final step in the transformation process. - Answers -Scheduling decisions
are wide in scope and latitude.
-Scheduling is constrained by prior decisions such as capacity & aggregate planning.
What are some of the objectives of effective scheduling?
(Multiple select)

-Less marketing required for products
-Increase productivity
-Yield cost savings
-Better customer service - Answers -Increase productivity
-Yield cost savings
-Better customer service
Scheduling in high-volume systems is known by what term?

Line balancing
Flow-shop scheduling
Rapid-flow scheduling

, Job-shop scheduling - Answers Flow-shop scheduling
Select all of the factors which contribute to the success of high-volume systems. (Multiple select)

-Rapid repair when breakdowns occur
-Minimization of quality problems
-Lowest cost suppliers
-Optimal product mixes - Answers -Rapid repair when breakdowns occur
-Minimization of quality problems
-Optimal product mixes
Which word below most accurately describes the processing involved in intermediate-volume
systems.

continuous
made-to-order
intermittent - Answers intermittent
The model often used to determine the ideal run size is know as the _________________ run size
model.

batch
linear
economic
optimal - Answers economic
The two basic issues for schedulers in low-volume systems are what?

MRP updating and run size
Customer lead time and supplier deliveries
Distribution among work centers and sequencing - Answers Distribution among work centers and
sequencing
The assignment of jobs to processing centers in low-volume systems is know by what term?

Sequencing
Job-shop scheduling
Loading - Answers Loading
Which chart is used as a visual aid for both loading and scheduling in low-volume systems?

Histogram
Fishbone diagram
Control chart
Gantt chart - Answers Gantt chart

-A histogram is a bar chart showing the distribution of a quantitative variable.
-A fishbone diagram is a chart that tryes to determine cause-and-effect relationships.
-A control chart is a time-ordered plot of statistics about output from a process.
Which of these is NOT a basic scheduling issue in intermediate-volume systems?

Timing of jobs
Run size of jobs
Sequence to produce jobs
Forecasting of jobs - Answers Forecasting of jobs
Scheduling in low-volume systems is known by what term?

Batch processing
Minimal run size scheduling
Job-shop scheduling
Flow scheduling - Answers Job-shop scheduling

-Batch processing is a fit for intermediate-volume systems.

Written for

Institution
OSCM 373
Course
OSCM 373

Document information

Uploaded on
February 1, 2026
Number of pages
7
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TutorJosh Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
371
Member since
1 year
Number of followers
16
Documents
29877
Last sold
1 day ago
Tutor Joshua

Here You will find all Documents and Package Deals Offered By Tutor Joshua.

3.6

59 reviews

5
21
4
15
3
12
2
0
1
11

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions