100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

Walmart - Stormwater EXAM NEWEST 2026 WITH COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW VERSION!!

Rating
-
Sold
-
Pages
3
Grade
A+
Uploaded on
30-01-2026
Written in
2025/2026

Walmart - Stormwater EXAM NEWEST 2026 WITH COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW VERSION!!

Institution
Walmart - Stormwater
Course
Walmart - Stormwater








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Walmart - Stormwater
Course
Walmart - Stormwater

Document information

Uploaded on
January 30, 2026
Number of pages
3
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

Walmart - Stormwater EXAM NEWEST 2026 WITH COMPLETE QUESTIONS AND CORRECT
DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW
VERSION!!




The 1970's law that set into place the regulation of stormwater is: - (answer)The Clean Water Act



Requirements for managing stormwater activity on a construction site are outlined in the following
regulation: - (answer)NPDES



Which of the following is never an allowable stormwater discharge from a construction site? -
(answer)Discharge from contaminated groundwater



The Notice of termination can filed when: - (answer)All construction activity, inside and outside the
building, is complete and permanent stabilization verified



Relative to stormwater permitting, all of the following must occur before construction starts except: -
(answer)Submit the notice of termination (NOT)



Which erosion control best mgmt practice increases water infiltration, dissipates rainfall energy and
slows overland flow of stormwater - (answer)Vegetation



Of the following factors that influence erosion rates, the one a contractor has the most control over is: -
(answer)Groundcover



Temporary stabilization should be implemented - (answer)Immediately on all disturbed areas that are
likely to or will remain inactive for 14-days or more



The Primary purpose of a construction exit is - (answer)To remove sediment from construction site
vehicles and minimize trackout



Common types of erosion include all of the following except - (answer)Sedimentation



Which of the following is NOT a beneficial use of water? - (answer)Flushing a spill down a storm drain
Free
Get access to the full document:
Download

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
trashags

Get to know the seller

Seller avatar
trashags Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
New on Stuvia
Member since
1 month
Number of followers
0
Documents
322
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions