https://www.stuvia.com/user/profgoodluck
FDOT Asphalt Paving Level 2 Exam V2 (2026/2027) –
Florida Department of Transportation Asphalt Paving
Level 2 Certification | Complete Questions with
Detailed Correct Answers | State-Level Technical
Exam Material (GRADED A)
The FDOT Asphalt Paving Level 2 Exam Preparation 2026/2027 – Latest Updated Edition is a
comprehensive study resource designed for construction professionals preparing for the Florida
Department of Transportation (FDOT) Asphalt Paving Level 2 Certification Examination. This
guide reflects the most current FDOT specifications, standard operating procedures, and quality
control requirements used on real state-level exams and active roadway projects.
This exam prep material provides a complete set of realistic, exam-style questions, each paired with
100% verified correct answers and clear technical explanations. It focuses on advanced asphalt
paving operations, quality control, acceptance procedures, plant and roadway inspections, mix
design verification, density requirements, and compliance with FDOT Standard Specifications.
All questions are written to assess field-level decision-making, inspection accuracy,
documentation, and safety compliance expected of Level 2-certified asphalt paving personnel.
Optimized for FDOT certification candidates, inspectors, technicians, contractors, and quality
assurance professionals, this guide supports confident testing and A+ certification results.
Exam Coverage
✔ FDOT Asphalt Paving Level 2 Certification Blueprint
✔ FDOT Standard Specifications for Road and Bridge Construction
✔ Asphalt Mix Design Requirements & Verification
✔ Plant Operations & Asphalt Production Inspection
✔ Paving Equipment, Laydown Operations & Compaction
✔ Density Control, Acceptance & Pay Factors
✔ Quality Control (QC) vs Quality Assurance (QA) Responsibilities
✔ Sampling, Testing & Documentation Procedures
✔ Temperature Control & Segregation Prevention
✔ Rolling Patterns & Compaction Requirements
✔ Surface Tolerances, Smoothness & Ride Quality
✔ Deficiency Identification & Corrective Actions
✔ Safety, Traffic Control & Work Zone Compliance
✔ FDOT Reporting, Records & Certification Responsibilities
, Answer Format
All questions include verified correct answers highlighted in green
FDOT-style multiple-choice format
Clear explanations emphasizing field application and specification compliance
Question:
On multi-FIN project numbers under one contract, the Asphalt is reported on the certification, by the
CONTRACTOR, under what Project FIN Number?
Answer
The Contractor shows the Asphalt on the lead FIN project number
Question:
A roadway is being constructed and has a Subsoil Excavation Quantity of 835 CY, a Regular
Excavation Quantity of 250 CY and an embankment Quantity of 1040 CY. Based upon this
information, the Final Quantity to be paid for embankment will be?
Answer
1875 CY
Question:
Which Document is used to authorize payment from original contingency Amount?
Answer
Work Order
Question:
Friction Course (FC-12.5) Straight edge Deficiency: A straightedge deficiency was left in place at no
pay. Calculate the equivalent tonnage at no pay. ( pay to appropriate accuracy) Gmm= 2.417,
thickness =1.5 inches, road width =12 feet, length of deficiency = 5 ft. (this occurred 25 feet from
the bridge deck)
Answer
8.4 Tons
Question:
Overruns or Underruns must be explained when?
Answer
A pay item overruns or underruns $10,000 or more.
Question:
Prices are adjusted on each progress estimate to reflect increases or decreases in the price of fuel for
contracts with original Contract Time:
Answer
In excess of 120 calendar days.
FDOT Asphalt Paving Level 2 Exam V2 (2026/2027) –
Florida Department of Transportation Asphalt Paving
Level 2 Certification | Complete Questions with
Detailed Correct Answers | State-Level Technical
Exam Material (GRADED A)
The FDOT Asphalt Paving Level 2 Exam Preparation 2026/2027 – Latest Updated Edition is a
comprehensive study resource designed for construction professionals preparing for the Florida
Department of Transportation (FDOT) Asphalt Paving Level 2 Certification Examination. This
guide reflects the most current FDOT specifications, standard operating procedures, and quality
control requirements used on real state-level exams and active roadway projects.
This exam prep material provides a complete set of realistic, exam-style questions, each paired with
100% verified correct answers and clear technical explanations. It focuses on advanced asphalt
paving operations, quality control, acceptance procedures, plant and roadway inspections, mix
design verification, density requirements, and compliance with FDOT Standard Specifications.
All questions are written to assess field-level decision-making, inspection accuracy,
documentation, and safety compliance expected of Level 2-certified asphalt paving personnel.
Optimized for FDOT certification candidates, inspectors, technicians, contractors, and quality
assurance professionals, this guide supports confident testing and A+ certification results.
Exam Coverage
✔ FDOT Asphalt Paving Level 2 Certification Blueprint
✔ FDOT Standard Specifications for Road and Bridge Construction
✔ Asphalt Mix Design Requirements & Verification
✔ Plant Operations & Asphalt Production Inspection
✔ Paving Equipment, Laydown Operations & Compaction
✔ Density Control, Acceptance & Pay Factors
✔ Quality Control (QC) vs Quality Assurance (QA) Responsibilities
✔ Sampling, Testing & Documentation Procedures
✔ Temperature Control & Segregation Prevention
✔ Rolling Patterns & Compaction Requirements
✔ Surface Tolerances, Smoothness & Ride Quality
✔ Deficiency Identification & Corrective Actions
✔ Safety, Traffic Control & Work Zone Compliance
✔ FDOT Reporting, Records & Certification Responsibilities
, Answer Format
All questions include verified correct answers highlighted in green
FDOT-style multiple-choice format
Clear explanations emphasizing field application and specification compliance
Question:
On multi-FIN project numbers under one contract, the Asphalt is reported on the certification, by the
CONTRACTOR, under what Project FIN Number?
Answer
The Contractor shows the Asphalt on the lead FIN project number
Question:
A roadway is being constructed and has a Subsoil Excavation Quantity of 835 CY, a Regular
Excavation Quantity of 250 CY and an embankment Quantity of 1040 CY. Based upon this
information, the Final Quantity to be paid for embankment will be?
Answer
1875 CY
Question:
Which Document is used to authorize payment from original contingency Amount?
Answer
Work Order
Question:
Friction Course (FC-12.5) Straight edge Deficiency: A straightedge deficiency was left in place at no
pay. Calculate the equivalent tonnage at no pay. ( pay to appropriate accuracy) Gmm= 2.417,
thickness =1.5 inches, road width =12 feet, length of deficiency = 5 ft. (this occurred 25 feet from
the bridge deck)
Answer
8.4 Tons
Question:
Overruns or Underruns must be explained when?
Answer
A pay item overruns or underruns $10,000 or more.
Question:
Prices are adjusted on each progress estimate to reflect increases or decreases in the price of fuel for
contracts with original Contract Time:
Answer
In excess of 120 calendar days.