100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

CQM-C ACTUAL EXAM PREP 2026 |QUESTIONS AND CORRECT DETAILED ANSWERS |ALREADY A GRADED |NEW AND REVISED

Rating
-
Sold
-
Pages
42
Grade
A+
Uploaded on
29-01-2026
Written in
2025/2026

CQM-C ACTUAL EXAM PREP 2026 |QUESTIONS AND CORRECT DETAILED ANSWERS |ALREADY A GRADED |NEW AND REVISED

Institution
CQM-C
Course
CQM-C











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CQM-C
Course
CQM-C

Document information

Uploaded on
January 29, 2026
Number of pages
42
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • cqm c

Content preview

1|Page



CQM-C ACTUAL EXAM PREP 2026
|QUESTIONS AND CORRECT DETAILED
ANSWERS |ALREADY A GRADED |NEW AND
REVISED




1. The primary purpose of Construction Quality Management
(CQM) is to:
A. Ensure contractors finish work quickly
B. Achieve the quality established by properly
developed requirements through the combined
responsibility, but separate efforts of contractor and
government personnel
C. Reduce government oversight
D. Increase contractor profits only
Rationale: CQM focuses on achieving contract-defined
quality through coordinated, but separate, responsibilities
of contractor and government staff.
2. Construction Quality Management ensures that
construction is performed:
A. With minimum government involvement
B. Only according to the contractor’s standards
C. According to plans and specifications, on time, within
budget, and in a safe work environment
D. Without safety considerations

,2|Page


Rationale: Effective CQM monitors compliance with
design, schedule, budget, and safety standards.
3. Partnering relationships between contractors and
government personnel are based upon:
A. Shared budgets only
B. Casual communication
C. Building trust and dedication to common goals
D. Contractual enforcement alone
Rationale: Successful partnering relies on trust and
mutual objectives, not solely contractual obligations.
4. It is the responsibility of Quality Assurance personnel to:
A. Conduct all field work personally
B. Approve contractor pay
C. Periodically verify that the contractor’s system of
control is working effectively
D. Supervise the contractor directly at all times
Rationale: QA personnel monitor and verify that
contractor QC systems function as intended.
5. An effective contractor Quality Control program will:
A. Allow work to be done without inspections
B. Focus only on safety
C. Incentivize work to be done correctly the first time,
resulting in earlier completion, reduced field overhead,
and greater profits
D. Replace government oversight entirely
Rationale: QC programs prevent errors, improve
efficiency, and support profitability.
6. The success or failure of all contractors is primarily based
upon:
A. Marketing and public relations
B. Ability to control costs, finance work, estimate jobs,

,3|Page


schedule work, and maintain effective quality control
C. Staff seniority alone
D. Government enforcement only
Rationale: Effective management of cost, schedule, and
quality is the key determinant of contractor performance.
7. Quality Assurance personnel are responsible for:
A. Conducting daily contractor work
B. Requiring contractors to maintain the quality
specified in the plans and specifications
C. Approving all contractor budgets
D. Supervising all laborers directly
Rationale: QA ensures compliance with contract quality
requirements rather than direct supervision.
8. Inspection is defined as:
A. The final project acceptance only
B. Verifying invoices
C. The process by which ongoing and completed work is
examined
D. Testing financial documentation
Rationale: Inspection monitors work quality during and
after execution to ensure compliance.
9. During the punch-out inspection of a project, QA personnel
must:
A. Ignore minor defects
B. Sign off work immediately
C. Ensure the contractor prepares a punch-list and
makes necessary corrections
D. Replace the contractor if deficiencies are found
Rationale: Punch-out inspections confirm all deficiencies
are corrected before project completion.

, 4|Page


10. If a disagreement arises over whether the contractor’s
work complies with the contract:
A. The contractor decides
B. QA personnel decide independently
C. The issue is ignored
D. The government makes the final determination
Rationale: Contractual compliance is ultimately
determined by the government authority.
11. Characteristics that describe a definable feature of
work include:
A. Only budget-related metrics
B. Cross-referenced listings to the contractor’s
construction schedule, possibly with multiple features
under one specification section
C. Only safety requirements
D. Only the project timeline
Rationale: Definable features are specific, measurable
portions of work linked to the schedule.
12. The phase that consists of daily checks to assure
ongoing compliance with contract requirements is the:
A. Preparatory phase
B. Follow-up phase
C. Final inspection phase
D. Planning phase
Rationale: The follow-up phase involves continuous
verification of compliance.
13. The Quality Assurance Plan (QAP) is:
A. Optional guidance for contractors
B. A financial auditing tool
C. A government management tool establishing staffing,
training, pre-award activities, and surveillance activities

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
impressivetutor Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
580
Member since
3 year
Number of followers
375
Documents
2412
Last sold
1 week ago

Are you having problems with your exams. There are better ways to cope with that. Exams,notes,case studies,Testbanks and many more are available here. The ability to not know something is the knowledge to know something better. Good luck in your studies. Hit me up if you need anything else.

4.8

1810 reviews

5
1636
4
38
3
51
2
58
1
27

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions