100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

TEXAS WASTEWATER C EXAM LATEST WITH ACTUAL QUESTIONS AND CORRECT VERIFIED ANSWERS/ALREADY GRADED A+ 100% GUARANTEED SUCCESS! 2026

Rating
-
Sold
-
Pages
39
Grade
A+
Uploaded on
21-01-2026
Written in
2025/2026

TEXAS WASTEWATER C EXAM LATEST WITH ACTUAL QUESTIONS AND CORRECT VERIFIED ANSWERS/ALREADY GRADED A+ 100% GUARANTEED SUCCESS! 2026

Institution
TEXAS WASTEWATER
Course
TEXAS WASTEWATER











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
TEXAS WASTEWATER
Course
TEXAS WASTEWATER

Document information

Uploaded on
January 21, 2026
Number of pages
39
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

1|Page




TEXAS WASTEWATER C EXAM LATEST WITH
ACTUAL QUESTIONS AND CORRECT VERIFIED
ANSWERS/ALREADY GRADED A+ 100%
GUARANTEED SUCCESS! 2026


Clean Water Act - ANSWER -(CWA, 1972) set maximum permissible
amounts of water pollutants that can be discharged into waterways;
aims to make surface waters swimmable and fishable


Texas Water Code - ANSWER -Under Chapter 26, the Texas Commission
on Environmental Quality (TCEQ) has jurisdiction over the discharge of
waste into or adjacent to water in the state.


TCEQ can revoke your license for - ANSWER -violating the permit,
falsifies records, states misleading information on licensing application,
or causes other violations.


water quality fees - ANSWER -based on plant flow, can be high as
$115,000 per permit.


Accidental Discharge - ANSWER -plant has 24hrs to notify TCEQ, which
may be done by phone or fax.

,2|Page


Penalties - ANSWER -TCEQ Water Code violation can be up to $25000
per day for each violation.


Required records - ANSWER -flow and effluent quality- 3 yrs
sludge records-5 yrs


DMR - ANSWER -Discharge Monitoring Report has to be submitted to
TCEQ no later than the 20th of the following month.


DMR signing - ANSWER -Operators should not sign unless a legal
signatory or have written authorization from a legal signatory within
your organization.


preliminary treatment - ANSWER -the 1st stage of sewage treatment
where large debris, such as sticks, grit, and rags pas through a screen
followed by a grit chamber, where the flow of water is slowed enough
to allow for sedimentation.


coarse screens - ANSWER -bar screen-parallel bars-manually or
mechanically cleaned. Must maintain 1.0ft per second. Need to be
frequently cleaned or disposed of.


fine screens - ANSWER -mechanically cleaned-less than 0.25in. two
types are disc and drum. Used for pretreatment of industrial wastes.

,3|Page


Comminutor - ANSWER -A circular grinder designed to grind the solids
coming through the screen into pieces.


Cyclone grit separator - ANSWER -enters at top angle and the flow
velocity causes a spinning action, the grit is concentrated at the bottom
of funnel.


Centrifugal pump - ANSWER -A non-positive displacement pump that
moves a varying amount of fluid with each rotation using an impeller
blade. Must be primed and most common type.


Positive Displacement Pump - ANSWER -A type of pump that uses
positive pressure to move a fluid. Three types are diaphragm, screw,
and piston. Keep discharge valves open always. Used to move sludge,
polymers, and chemicals.


sedimentation tank (Clarifiers) - ANSWER -consists of cylindrical or
rectangular tanks where settleable solids are removed by gravity. Low
velocity conditions.


inlet zone - ANSWER -Where the inflow is distributed over the tank
cross section and to prevent short-circuiting


design flow of 1.0 MGD or less - ANSWER -effluent weirs can provide a
max of 20,000 gal/day/linear ft.

, 4|Page




wastewater bugs - ANSWER -bacteria, protozoa, algae, and fungi


wastewater stabilization ponds - ANSWER -most common pond used in
Texas, designed to be aerobic throughout its depth. 3-5ft. BOD should
not exceed 35lb. BOD/acre/day


Facultative lagoon - ANSWER -aerobic on top and anaerobic on bottom,
5-8ft deep, 30 day detention time is common, removes 50% of BOD.


activated sludge process - ANSWER -Consists of "seeding" a tank of
sewage with bacteria-laden sludge, pumping compressed air into the
mixture and agitating for 4-10 hours.


Return Activated Sludge (RAS) - ANSWER -The settled activated sludge
(biomass) collected in a final clarifier and returned to the secondary
treatment process to mix with incoming wastewater. This returns a
concentrated population of microorganisms back into the aeration
basin.


Waste Activated Sludge - ANSWER -is the activated sludge (excess
biomass or cell mass) removed from the secondary treatment process.
WAS is pumped to thickeners or digesters to be processed for final
disposal.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
AceExam1 Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
20
Member since
1 year
Number of followers
0
Documents
757
Last sold
3 weeks ago

As a tutor, I focus on offering accurate, reliable, and current study materials to support students in their exam preparation and assignments. My goal is to provide the best resources, such as summaries and nursing exam test banks, ensuring that students can buy with confidence. I encourage customers to leave reviews after purchases for quality assurance and to recommend my services to others. Thank you for your support and trust.

3.7

6 reviews

5
3
4
0
3
1
2
2
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions