GRADED A+ 2026 UPDATE
Leave the first rating
Terms in this set (40)
Achieve the quality established by properly
The purpose of
developed requirements through the combined
Construction Quality
responsibility, but seperate efforts of contractpr
Management is to:
smd government personnel.
Construction Quality According to plans and specifications, on time,
Management is the within a defined budget and a safe work
performance of tasks, environment.
which ensure that
construction is
performed.
Partnering relationships Building trust and dedication to common goals
are based upon:
It is the responsibility of Periodically verify that the contractors system of
Quality Assurance control is working effectively.
Personnel to:
An effective contractor Be an incentive for work to be done correctly the
quality control program first time resulting in earlier completion, reduced
will: field overhead costs, and greater profits.
The success or failure of The ability to control costs, finance work, estimate
all contractors is based jobs, schedule the work, and maintain effective
upon: quality control.
Quality Assurance Require contractors to maintain the quality specified
Personnel have the in the plans and specifications.
responsibility to:
The process by which ongoing and completed work
Inspection is:
is examined
, Quality Assurance Personnel must assure that the
During the punch-out
contractor prepares a punch-list and makes
inspection of a project:
corrections.
If there is a disagreement The government makes the final determination
whether the contractors
work complies with the
contract:
Cross-referenced listings to the contractors
Characteristics that
construction schedule that may have more than one
describe a definable
definable feature under a section of the
feature of work include:
specifications.
The _____________________ Follow-up phase
consists of daily checks
of the work to assure
continuing compliance
with contract
requirements.
Is a government management tool establishing
The Quality Assurance
staffing, training, pre-award activities, and
Plan:
surveillance activities.
Testing is extremely Both the contractor and the government
important in construction
quality management and
is performed by:
If the contractor does not Require the contractor to assume personal
provide an adequate supervision of the work.
superintendent, the
contract allows the
contracting officer to:
Is the foundation upon which quality work is based
The Quality Control Plan:
and outlines planned quality control procedures.
Tests that are Quality Assurance tests
unannounced, randomly
performed, and repeat
quality control tests are: