100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

MOLD ASSESSOR TECHNICIAN EXAM QUESTIONS AND CORRECT DETAILED ANSWERS LATEST UPDATES 2026 (VERIFIED ANSWERS )ALREADY GRADED A+

Rating
-
Sold
-
Pages
28
Grade
A+
Uploaded on
11-01-2026
Written in
2025/2026

MOLD ASSESSOR TECHNICIAN EXAM QUESTIONS AND CORRECT DETAILED ANSWERS LATEST UPDATES 2026 (VERIFIED ANSWERS )ALREADY GRADED A+

Institution
MOLD ASSESSOR TECHNICIAN
Course
MOLD ASSESSOR TECHNICIAN










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
MOLD ASSESSOR TECHNICIAN
Course
MOLD ASSESSOR TECHNICIAN

Document information

Uploaded on
January 11, 2026
Number of pages
28
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • mold assessor technician

Content preview

MOLD ASSESSOR TECHNICIAN EXAM QUESTIONS
AND CORRECT DETAILED ANSWERS LATEST
UPDATES 2026 (VERIFIED ANSWERS )ALREADY
GRADED A+



According to state regulation (Texas)Mold Remediation Rules, an owner or their employees are
NOT required to be licensed to perform mold remediation on a residential property they own
and has fewer than ______ dewelling units. - ANSWERS-10



TMRR, Stop Date is defined as - ANSWERS-The date following a day on which final clearance is
achieved following a mold remediation project.



TMRR, a person whose license has expired for more than ______ ___________ must obtain a
new license and must comply with current requirements, including any state examination
requirements. - ANSWERS-6 months or 180 days



TMRR, a Mold Assessment Tech (MAT) is NOT licensed to: - ANSWERS-Develop a Mold
Management Plan or a Mold Remediation Protocol.



TMRR, the air pressure within a walk-in containment must be ________________ the pressure
in building areas adjacent to the containment. - ANSWERS-Lower than



TMRR, signs advising that mold remediation project is in progress shall bear the words: -
ANSWERS-Notice; Mold remediation project in progress.

,TMRR, the signs should be what size and colors - ANSWERS-8X10, black letter on a yellow
background.



TMRR, for a remediation project to achieve clearance, a ____________ __________
_______________ shall conduct a post remediation assessment using visual, procedural, and
analytical methods. - ANSWERS-Mold Assessment Consultant



TMRR, Not later than ____ ____________ after completion of a mold remediation project, the
licensed mold remediation contractor or company shall provide the property owner with copies
of required photographs of the scene of the mold remediation taken before and after
remediation - ANSWERS-1 week



TMRR, not later than the ________ day after the project stop date, the licensed mold
remediation contractor or company shall provide a certificate of mold remediation to the
property owner on a form adopted by the Texas Commissioner of insurance. - ANSWERS-10th
day



TMRR, Which of the following is NOT an example of a critical violation ( Level 1) - ANSWERS-
Working with a credential or ID card that has been expired for one month or less.



TMRR, a person whose application or credential has been revoked shall be ineligible to reapply
for any mold-related credential for up to _____ ___________. - ANSWERS-2 years



TMRR, a person seeking to renew a license, registration or accreditation shall submit a renewal
application no sooner that _______ days before the credential expires. - ANSWERS-60



TMRR, a serious violation (Level II) assessed by DSHS can carry a fine up to ________ per
violation. - ANSWERS-$2500

, TMRR, remediation worker training shall consist of a least ____ ________ of training. -
ANSWERS-4 hours



TMRR, the Mold Assessment Consultant course shall be at least _____ __________ of training. -
ANSWERS-40 hours



TMRR, a person who applies a biocide to wood to control a wood-infesting organism must be
licensed by: - ANSWERS-Texas Structural Pest Control Board



TMRR, the words on signs advising that a mold remediation project is in progress shall be black
on a ______ background. - ANSWERS-Yellow



EPA's, "MOld Remediation in Schools and commercial Buildings" opportunistic infections in
people with weakened immune systems may be caused by: - ANSWERS-Aspergillus fumigatus
and Trichoderma



EPA's, "Mold Remediation in Schools and commercial Buildings" full containment is generally
recommended for areas involving greater than _______ sq. ft of mold contamination. -
ANSWERS-100



If using a full containment, where should your respirators should removed? - ANSWERS-Outside
decontamination chamber



EPA, which of the following is NOT a cleanup method used for remediating damage to building
materials that have mold growth? - ANSWERS-scraping



Wet Vacuums should NOT be used to remove water from: - ANSWERS-Wallboard
$17.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
PNseller

Get to know the seller

Seller avatar
PNseller walden university
View profile
Follow You need to be logged in order to follow users or courses
Sold
New on Stuvia
Member since
1 week
Number of followers
0
Documents
34
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions