100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

2025/2026 CEPSCI EXAM COMPLETE CURRENT QUESTIONS AND DETAILED CORRECT (VERIFIED) ANSWERS FOR GUARANTEED PASS/TOP-RATED A+.

Rating
-
Sold
-
Pages
34
Grade
A+
Uploaded on
09-12-2025
Written in
2025/2026

Ace your (CEPSCI) exam with this targeted guide. This resource delivers evidence-based practice questions and detailed

Institution
Module











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Module

Document information

Uploaded on
December 9, 2025
Number of pages
34
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Page 1 of 34



2025/2026 CEPSCI EXAM COMPLETE CURRENT
QUESTIONS AND DETAILED CORRECT (VERIFIED)
ANSWERS FOR GUARANTEED PASS/TOP-RATED A+.
CEPSCI
Ace your (CEPSCI) exam with this targeted guide. This resource
delivers evidence-based practice questions and detailed


Final site stabilization is achieved when percent vegetative
cover on all disturbed areas is at least the following:


a. 65%
b. 70%
c. 80%
d. 90% ...... ANSWER ....... b. 70%


The sediment control structure in the center right side of the
photo above is a:


a. Rock-filter fabric inlet
b. Rock construction entrance
c. Rock ditch check

, Page 2 of 34


d. Rock spillway for a sediment trap ...... ANSWER ....... d.
Rock spillway for a sediment trap


Consider the following situation: You observe bulldozer
tracks with dozer traveling parallel to the contour. The
statement that you would use in an inspection report about
the situation shown is most nearly.


a. The bulldozer tracks indicate that the tracking was done in
the incorrect direction.
b. The bulldozer tracks indicate that the tracking was done in
the correct direction.
c. The situation is an improper application of tracking and
should be replaced immediately with sod.
d. ECB would not be appropriate on the site because the
slope is too flat. ...... ANSWER ....... a. The bulldozer
tracks indicate that the tracking was done in the
incorrect direction.


The main benefit of using mulches and ECBs is that they:


a. Are not living like vegetation
b. Provide instant cover

, Page 3 of 34


c. Do not have to be anchored
d. Last 4-6 years which is longer than the life of most
construction projects ...... ANSWER ....... b. Provide
instant cover


Sediment and erosion control measures shall not be
removed until all construction is complete and a temporary
ground cover is established.


a. True
b. False ...... ANSWER ....... b. False
TRMs are composed of ...... ANSWER ....... synthetic
materials-permanent-critical area use


ECB's/ TRMs installation ...... ANSWER ....... prepare
seedbed by loosening op 2-3 inches of soil
-ALWAYS install to manufacturers specifications.


Final stabilization DESCRIPTION ...... ANSWER ....... -
permanent seeding and planting of grasses
- permanent planting of ground cover plants
- sodding

, Page 4 of 34




Final stabilization ...... ANSWER ....... an uniform
perennial vegetative cover with a density of 70% of native
background vegetative cover has been established


Rip Rap Channel DESCRIPTION ...... ANSWER ....... a
permanent, erosion resistant channel lining of large,
loose, angular stone with non-woven geotextile filter
fabric or granular underlining to prevent soil movement
into or through rip-rap


outlet protection description ...... ANSWER ....... protects
immediate area around pipe and culvert outlets from
scour and deterioration by dissipating flow energy


outlet protection includes ...... ANSWER ....... TRM's
riprap, grouted riprap, concrete, gabion baskets, or other
structural measures


Outlet protecton inspection ...... ANSWER ....... non
woven geotextile filter fabric should be place under all
riprap outlet installations, ensure adequate length of
outlet protection measure to provide sufficient
protection.
£16.67
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
AGradeServers
4.5
(2)

Get to know the seller

Seller avatar
AGradeServers chamberlain university
Follow You need to be logged in order to follow users or courses
Sold
2
Member since
3 months
Number of followers
0
Documents
730
Last sold
2 months ago
AGradeServers

Welcome to AGradeServers, your trusted source for top-quality study materials. We provide well-structured notes, guides, and resources designed to help you achieve excellent results. Each document is carefully prepared to be clear, concise, and exam-focused. Whether you’re preparing for tests, assignments, or final exams, we’ve got you covered. At AGradeServers, our mission is simple—helping you succeed with confidence.

4.5

2 reviews

5
1
4
1
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions