The _________ consists of Follow-up Phase
daily checks of the work
to assure continuing
compliance with contract
requirements
Design-Build contracts The QC Manager to be in place and take an active
require role in the review and coordination of the design.
Which of the following is Safety
included in all three
phases of the Three
Phases of Control?
Achieve the quality established by properly
The purpose of
developed requirements through the combined
Construction Quality
responsibility, but separate, efforts of contractors and
Management is to
government personnel
Testing is extremely Both the contractor and the government
important in construction
quality management and
is performed by
https://quizlet.com/1066059000/construction-quality-management-for-contractors-exam-questions-answers-100-verified-solutions-questions-with-corre… 1/5
, 8/16/25, 1:44 PM Construction Quality Management for Contractors EXAM Questions & Answers | 100% Verified solutions |Questions with Correct A…
The primary purpose of Require the contractor to plan, schedule, and perform
the Three-Phase Control quality management actions to assure work meets all
System is to specified quality standards
Quality Assurance Require the contractor to maintain the quality
Personnel have the specified in the plans and specifications
responsibility to
The _________________ is the Preparatory Phase
appropriate time to assure
that all materials and/or
equipment have been
tested, submitted, and
approved
The Preconstruction Conducted prior to the commencement of any
Conference and physical construction work
Coordination and Mutual
Understanding Meeting
Are
Are specified in the technical specs, outlined in the
Contractor testing
QCP, and addressed at Coordination and Mutual
procedures:
Understanding Meeting
Identification of individual quality quality control
The Quality Control Plan
personnel, including name, qualifications, assigned
contains
duties, responsibilities and authorities.
Tests that are Quality assurance tests
unannounced, randomly
performed, and repeat
quality control tests are
The contractor is required There are no exceptions to the rule
to conduct a Preparatory
Phase Meeting before
they begin any definable
feature of work except
when