FDOT Final Estimates Level 1 EXAM PREP 2025/2026 COMPLETE QUESTIONS BANK AND CORRECT DETAILED ANSWERS WITH RATIONALES || 100% GUARANTEED PASS &lt;RECENT VERSION&gt; 1. Final Estimates - ANSWER The entire payment process to the Contractor. 2. Progress Estimates - ANSWER Regularly scheduled payments made to contractors on a monthly basis. 3. Contract Documents - ANSWER Documents that guide both the Contractors and Department personnel in the performance of the work and how it should be paid. 4. Contract Plans - ANSWER Detailed pictorial instructions for the road or bridge construction. 5. Standard Plans - ANSWER Guidelines and technical drawings for Design and Construction personnel on how items should be constructed. 6. Standard Specifications - ANSWER Directions, provisions, and requirements that the Contractor must follow to perform the work required. 7. Supplemental Specifications - ANSWER Approved additions or deletions to the Standard Specifications. 8. Special Provisions - ANSWER Contract documents that may describe a situation unique to a specific project or modify a requirement set forth in the Specifications. 9. Technical Special Provisions - ANSWER Technical documents applicable to specialty items of work. 10. Contract Proposal Form - ANSWER The method by which Contractors submit their bids. 11. Supplemental Agreements - ANSWER Documents used to authorize work different from that shown in the original plans and contract. 12. Work Orders - ANSWER Used to include additional unforeseen work into the original contract and to do minor changes. 13. Locally Funded Agreements - ANSWER A type of contract included within a project between the Department and another government or private entities. 14. Final Inspection and Acceptance - ANSWER The process of inspecting and accepting the completed work by the Engineer. 15. Construction Project Administration Manual (CPAM) - ANSWER Sets forth methods and procedures for preparing and submitting a final estimate. 16. What two types of Estimates are needed to pay for the work performed by contractors? - ANSWER Final & Progress Monthly 17. In case of discrepancies among the contract documents, which document takes the highest precedence? - ANSWER Special Provisions 18. Contractors Recieve progress payments on the basis of? - ANSWER Monthly Progress Estimates 19. Which of the following sets forth the Department's methods and procedures for preparing and checking final estimates? - ANSWER Preparation and Documentation Manual (PDM) 20. Which Document contains a series of Specially designed forms that show both original estimates of quantities and the final quantities as measured ad accepted? - ANSWER Computation Books 21. Which Document contains alignment notes, cross-section notes, linear and area measurements and dimension sketches? - ANSWER Field Notebooks 22. Where are major changes during construction documented and "as-built" conditions shown? - ANSWER Field Notebooks 23. What identification is needed to show on the front cover of a field book? - ANSWER FEID, Contract number, General contents of the book 24. Most Linear pay items are measures in linear ________? - ANSWER Feet 25. Aside from measuring the length of fence, you should count and document the number of: - ANSWER Corner post assemblies & pull and end post assemblies 26. The various fencing post assemblies are identified by approximate ________ and are totaled in a ___________. - ANSWER Station; field notbook 27. You should be sure that the batch scales nd automatic printer at an asphalt plant are certified for accuracy every __________. - ANSWER Six Months 28. The accuracy of batch scales and automatic printers should be checked: - ANSWER At least once a week & before accepting the first load on a project. 29. Documentation of "per each" items is usually in the form of a tabulation by _________________________. - ANSWER Location 30. Which of the Following are NOT often paid for on a lump sum basis? - ANSWER Box Culverts 31. On a certain project, the contractor's lump sum bid for clearing and grubbing was based on the expectation of clearing 12.380 acres at a unit price of $20,000. During the project FDOT decided to reduce the original acreage to be cleared and grubbed by (2.105 acres). What should the lump sum quantity be adjusted to? - ANSWER 0.83 LS 32. What is the method used to document significant quantity or dollar changes in a pay item? - ANSWER Explanation of overruns and underruns 33. Which of the following is NOT officially considered a "Contract Document"? - ANSWER Estimates Procedure Manual 34. Between Printings of the standard specifications, what does the department publish to identify and describe changes in the specifications? - ANSWER Change Orders 35. Completed sets of final plans should be: - ANSWER Bound together in the order shown on the key sheet & Submitted to the district with the final estimates package. 36. Which of the items listed below is NOT included in the Final Estimates package? - ANSWER Density log books 37. What is placed on the plan sheets to call particular attention to unusual conditions? - ANSWER Plan Notes 38. What would you use to document field changes in the plans? - ANSWER Black ball point pen & Black pencil 39. What is the basis for payment of final quantities? - ANSWER Site Source records 40. What software is available for calculation final pa quantities? - ANSWER Engineering Menu 41. T/F: A major function of the DOT is to carry out Construction and Reconstruction programs to provide the public with adequate transportation service. - ANSWER True 42. For DOT management of construction and reconstruction projects includes the following specific responsibilities: A. Planning, Programming, and Design B. Contract Administrations C. Contractor Payments D. Design and Contract Management E. All of the above - ANSWER E. All of the above 43. T/F: To pay for work performed by contractors, progress and Final Estimates are needed? - ANSWER True 44. Which of the following is not officially considered a "Contract Document"? A. Supplemental Agreements and Work Orders B. Notebooks and Estimates Procedure Manual. C. Standard Specifications. D .Construction Manual. E. Answers B & D. - ANSWER E. Answers B & D. 45. Between printings of the Standard Specifications, what does the Department publish to identify and describe changes in the Specifications? A. CPAM B. Supplemental Specifications C. Work Orders D. Specification Changes - ANSWER B. Supplemental Specifications 46. Select the correct sequence of documents in order of precedence, with the document highest in authority listed first. A. Contract Plans, Development Specifications, Standard Specifications, Special Provisions, Technical Special Provisions, Supplemental Specifications, Design Standards. B. Design Standards, Special Provisions, Technical Special Provisions, Supplemental Specifications, Contract Plans, development Specifications, Standard Specifications. C. Special Provisions, Technical Special Provisions, Contract Plans, Design Standards, Development Specifications, Supplemental Specifications, Standard Specifications. D. Supplemental Specifications, Special Provisions, Contract Plans, Development Specifications, Standards Specifications, Technical Special Provisions, Design Standards.

Show more Read less
Institution
FDOT Estimates
Module
FDOT Estimates











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
FDOT Estimates
Module
FDOT Estimates

Document information

Uploaded on
August 6, 2025
Number of pages
43
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

FDOT Final Estimates Level 1 EXAM PREP
2025/2026 COMPLETE QUESTIONS BANK
AND CORRECT DETAILED ANSWERS WITH
RATIONALES || 100% GUARANTEED PASS
<RECENT VERSION>


1. Final Estimates - ANSWER ✔ The entire payment process to the Contractor.

2. Progress Estimates - ANSWER ✔ Regularly scheduled payments made to
contractors on a monthly basis.

3. Contract Documents - ANSWER ✔ Documents that guide both the
Contractors and Department personnel in the performance of the work and
how it should be paid.

4. Contract Plans - ANSWER ✔ Detailed pictorial instructions for the road or
bridge construction.

5. Standard Plans - ANSWER ✔ Guidelines and technical drawings for Design
and Construction personnel on how items should be constructed.

6. Standard Specifications - ANSWER ✔ Directions, provisions, and
requirements that the Contractor must follow to perform the work required.

7. Supplemental Specifications - ANSWER ✔ Approved additions or deletions
to the Standard Specifications.

8. Special Provisions - ANSWER ✔ Contract documents that may describe a
situation unique to a specific project or modify a requirement set forth in the
Specifications.

,9. Technical Special Provisions - ANSWER ✔ Technical documents applicable
to specialty items of work.

10.Contract Proposal Form - ANSWER ✔ The method by which Contractors
submit their bids.

11.Supplemental Agreements - ANSWER ✔ Documents used to authorize
work different from that shown in the original plans and contract.

12.Work Orders - ANSWER ✔ Used to include additional unforeseen work
into the original contract and to do minor changes.

13.Locally Funded Agreements - ANSWER ✔ A type of contract included
within a project between the Department and another government or private
entities.

14.Final Inspection and Acceptance - ANSWER ✔ The process of inspecting
and accepting the completed work by the Engineer.

15.Construction Project Administration Manual (CPAM) - ANSWER ✔ Sets
forth methods and procedures for preparing and submitting a final estimate.


16.What two types of Estimates are needed to pay for the work performed by
contractors? - ANSWER ✔ Final & Progress Monthly

17.In case of discrepancies among the contract documents, which document
takes the highest precedence? - ANSWER ✔ Special Provisions

18.Contractors Recieve progress payments on the basis of? - ANSWER ✔
Monthly Progress Estimates

19.Which of the following sets forth the Department's methods and procedures
for preparing and checking final estimates? - ANSWER ✔ Preparation and
Documentation Manual (PDM)

,20.Which Document contains a series of Specially designed forms that show
both original estimates of quantities and the final quantities as measured ad
accepted? - ANSWER ✔ Computation Books

21.Which Document contains alignment notes, cross-section notes, linear and
area measurements and dimension sketches? - ANSWER ✔ Field Notebooks

22.Where are major changes during construction documented and "as-built"
conditions shown? - ANSWER ✔ Field Notebooks

23.What identification is needed to show on the front cover of a field book? -
ANSWER ✔ FEID, Contract number, General contents of the book

24.Most Linear pay items are measures in linear ________? - ANSWER ✔ Feet

25.Aside from measuring the length of fence, you should count and document
the number of: - ANSWER ✔ Corner post assemblies & pull and end post
assemblies

26.The various fencing post assemblies are identified by approximate ________
and are totaled in a ___________. - ANSWER ✔ Station; field notbook

27.You should be sure that the batch scales nd automatic printer at an asphalt
plant are certified for accuracy every __________. - ANSWER ✔ Six
Months

28.The accuracy of batch scales and automatic printers should be checked: -
ANSWER ✔ At least once a week & before accepting the first load on a
project.

29.Documentation of "per each" items is usually in the form of a tabulation by
_________________________. - ANSWER ✔ Location

30.Which of the Following are NOT often paid for on a lump sum basis? -
ANSWER ✔ Box Culverts

31.On a certain project, the contractor's lump sum bid for clearing and grubbing
was based on the expectation of clearing 12.380 acres at a unit price of

, $20,000. During the project FDOT decided to reduce the original acreage to
be cleared and grubbed by (2.105 acres). What should the lump sum quantity
be adjusted to? - ANSWER ✔ 0.83 LS

32.What is the method used to document significant quantity or dollar changes
in a pay item? - ANSWER ✔ Explanation of overruns and underruns

33.Which of the following is NOT officially considered a "Contract
Document"? - ANSWER ✔ Estimates Procedure Manual

34.Between Printings of the standard specifications, what does the department
publish to identify and describe changes in the specifications? - ANSWER
✔ Change Orders

35.Completed sets of final plans should be: - ANSWER ✔ Bound together in
the order shown on the key sheet & Submitted to the district with the final
estimates package.

36.Which of the items listed below is NOT included in the Final Estimates
package? - ANSWER ✔ Density log books

37.What is placed on the plan sheets to call particular attention to unusual
conditions? - ANSWER ✔ Plan Notes

38.What would you use to document field changes in the plans? - ANSWER ✔
Black ball point pen & Black pencil

39.What is the basis for payment of final quantities? - ANSWER ✔ Site Source
records

40.What software is available for calculation final pa quantities? - ANSWER ✔
Engineering Menu

41.T/F: A major function of the DOT is to carry out Construction and
Reconstruction programs to provide the public with adequate transportation
service. - ANSWER ✔ True
£10.82
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BenjaminsStudyHub Teachme2-tutor
Follow You need to be logged in order to follow users or courses
Sold
11
Member since
6 months
Number of followers
0
Documents
248
Last sold
2 weeks ago
BENJAMIN STUDY HUB

Welcome to this platform! Here, you'll find a wide range of carefully curated study resources, including in-depth documents, all-inclusive bundles, and professionally designed flashcards—all provided by BenjaminsStudyHub. These materials are thoughtfully created to enhance your learning experience and help you prepare for exams with confidence and ease. I'm available to assist you with any academic questions or support you might need. Feel free to reach out—I'm always happy to help you succeed in your studies. Thank you for choosing these resources, and I wish you a productive and fulfilling learning journey!

Read more Read less
3.0

3 reviews

5
0
4
1
3
1
2
1
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions