DBIA Practice Exam:DBIA:DBIA Exam Questions & Answers: Latest Updated:
building information modeling (BIM) (Ans- The digital, three-dimensional modeling of building systems, with the linking of model components to a database of properties and relationships. Allows real-time sharing of design evolution, drives early decision-making, defines expectations for design phase deliverables, enables implementation of additional uses for the database interdisciplinary design charrettes (Ans- thinking out loud together, both-and thinking promotes innovation, greater diversity of ideas, thorough systems thinking encouraged, sharing lessons learned, a voice in the design process builds team cohesion, helps to make big decisions early integrated project leader (DB-PM) (Ans- leads project team and manages team dynamics, balances owner needs plus design and construction, and guides project's process designer of record (a/e) (Ans- licensed to protect health, safety, and welfare of the public, leads the overall design effort, or design and engineering of a specific disciplinedesign manager (Ans- facilitates "marriage" between design professionals and cost estimators, advocates for design excellence within the design-build team, and manages the design information flow and deliverables Estimator (Ans- must be in step with the designer from start to finish; receives assistance from key trade partners design commitment (Ans- designer of record confirms the documents comply with the owner's project criteria, all codes and standards; design confirmed within budget and schedule; owner's review for compliance has been completed; changes made after this may result in request for equitable adjustment; the owner and DB-er should reach a consensus on this definition and when it occurs during the post-award process integrated design work plan (IDWP) (Ans- identify design tasks and decisions to complete the design of the project; decision making - how and when to make decisions; identify work flow of design deliverables best supporting construction; optimize time for design phase co-location; optimize opportunities for
Written for
- Institution
- Rasmussen College
- Module
- DBIA
Document information
- Uploaded on
- July 31, 2025
- Number of pages
- 24
- Written in
- 2024/2025
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
building information modeling bim
-
interdisciplinary design charrettes
-
integrated project leader db pm
Also available in package deal