Builder'sgRiskgvsgCommercialgGeneralgLiabilityg(CGL)
BR:goverallgprojectg(physicalgloss)g GCL
:gtypicallyglimitedgtogspecificgevents
4gPhasesgofgOversight
, Pgagggeg |g2
1. Pre-Constructiong(formalgpartneringgtogavoidgdisputes)
2. ContractgOversightg-gbegaccessiblegandgflexible
- designgmanagementgprocess
- notgsimplygcomplygwithg100%gCDs
- incorporategincentive
3. Close-Out
4. PerformancegEvaluationg-gAudit,gwarrantygperiod
IntegratedgApproach
findgholesgearlygingthegprocess.gandgdeliverygcangmeetg
expectations
AgreeinggongDesigngCommitment
- findggapsgingOwner'sgRFPgvsgDBgproposal
- reachgagreementgongscope,gbudgetg7gdesigngvalue
- balancegOwner'sgdesiregtog"knowgthegdesigngdetails"gbeforegco
nstructiongwgDBgabilitygtogachievegPerformancegRequirements
- DEFINEg&gAGREEgongwhatgconstitutesg"designgcommitment"g
earlygingPost-Awardgphase
ChangegOrder
- genuinelygunforseengconditions
- owner-initiatedgchange
- conflicts/gapsgingOwner'sgprojectgcriteria
- forcegmajeuregdelaysgorgdamagesgtogwork
- typicallygsolegsourcegprocurementgandgthereforegrequiresgcostg&g
pricinggdatagtogsupportgtogapprove
WorkgBreakdowngStructureg(WBS)
allowsgcostgestimatorgto:
- categorizegportionsgingintogunits
- integrategcostgandgschedulinggforgplanninggandgcontrollinggtheg
budget
, Pgagggeg |g3
- providegworkgdescription,gTOgandgstatusgpergworkgpackage
- trackgprojected,gcontractedgandgactualgcostsgandgschedules
IntegratedgDesigngWorkgPlang(IDWP)g
shouldgbegincludedgingthegProposal
- IDgtasksgandgdecisions
- decisiongmaking,ghowgandgwhen
- IDgworkgflowgofgdeliverables
- optimizegtimegforgdesigngphasegco-location
- optimizegopportunitiesgforgconstructabilitygreviews
Fast-tracking
- incrementalgworkgpackages
- earlygactivitiesgcangbegstartedgpriorgtogtotalgdesigngbeinggco
mpleted:gprocuringglonggleadgitems,gdemolition,gsitegwork,guti
litiesgwork
- enablesgearlygprojectgcompletion
TrendgManagementgProgram
- formalgproactivegprocessgtogid,gmanagegchangesgduringgpre-
congphase
- biggopportunitygingDB
- applicablegtogallglumpgsum,gGMPgandgvariousgdeliveries
ValuegEngineering
obtaingaddedgvalue
design.gVEgimplicitgthroughoutgpreg&gpost-award
- costg&gschedulegbenefits
- increasedgquality
- increasedgusefulglife
- improvedgfunctionality
- improvedgoperationg&gmtc
- lowerglifegcyclegcosts
, Pgagggeg |g4
ConstructabilitygReviews
- usesgconstructiongknowledgegingplanning,gdesign,gprocurementg&g
fieldgops
- ongoinggfunction
QA/QC
heldgbygDBgteam
QualitygAssuranceg(QA)
Verifiesgconformance:
- qualitygcontrolghasgbeengperformed
- acceptedgproceduresghavegbeengutilized
- qualitygstandardsghavegbeengmet
QualitygControlg(QC)
measuresgthatgbaselinegstandardsghavegbeengmet:
- compliancegwithgthegRFP
- bothgdesigng&gconstruction
- compliancegwithgProposalg(Ownergoversight)
Commissioning
Ensuresgdeliverygpergprojectgrequirements:
- mechanical
- plumbing
- fire/lifegsafety
- buildinggenveloped
- controlsgandgsecuritygsystems
ClosinggOut
- finalgcompletion
- regulatoryginspections
- recordgdrawings
- atticgstock/sparegparts