"In accordance with the interim Life Safety Measures, when temp fire alarm systems are
provided, how often must they be tested?
a) Weekly
b) Monthly
c) Semi-anually
d) Quarterly - CORRECT ANSWER b) Monthly"
"Which of the following should not be included in a capital budget for replacement of a central
chiller?
a) Design Fees
b) Cost of removal of the old chiller
c) Commissioning
d) Service Contract - CORRECT ANSWER d) Service Contract"
"An project requres that the piped gas system be shut down and O2 supplied by portable
cylinders. A storage area has been set aside for cylinders (23.5 cu ft per cylinder). What is the
max number of cylinders that can be stored in the unit?
a) 10
b) 12
c) 14
d) 16 - CORRECT ANSWER b) 12 Max 300 CF"
"A multiphase project will require you to alter egress patterns for several units, the ICU, TCU,
and MICU. In some instances, required exists will lead to an active construction site. What
ILSM's are most appropriate.
a) Provide temp exit signage in affected areas and monitor egress paths to ensure that they
remain clear.
b) Develop and identify new exit routes, train staff in affected areas, and increase fire drills.
c) Provide temp exit signage, implement a fire watch, and document all activities.
d) Provide temp exit signage, notify the fire department, and perform additional fire drills. -
CORRECT ANSWER b) Develop and identify new exit routes, train staff in affected areas, and
increase fire drills."
"According to ASHRAE 170-2008, what is the minimum supply air volume for a 20x20x15 class A
operating room?
2
,a) 1000 CFM
b) 1500 CFM
c) 2000 CFM
d) 2500 CFM - CORRECT ANSWER b) 1500 CFM 15-20 Air changes per hour."
"As you arrive at work, you are notified that the hospital has implemented their EOP overnight.
As the project manager, which best describes the steps you should take in order of priority.
a) Cease work contract the facility manager for more details, and resume work if adequate
power is available.
b) Contract the owner's representative and ask for further instructions.
c) Cease work, contract inspection Preventionist for instructions.
d) Cease work, secure materials and tools as possible, wait for further instructions. - CORRECT
ANSWER b) Contract the owner's representative and ask for further instructions."
"In which of the following stages of a construction project is an infection control risk
assessment best initiated?
a) Programming
b) Project Mobilization
c) Construction Phase
d) Commissioning - CORRECT ANSWER a) Programming"
"Which 1996 Act of Congress requires that patient information remain confidential?
a)Health Insurance Portability and Accountability Act
b)Health Insurance Protection and Profitability Act
c) Health Information Protection and Portability Act
d) Health Information Protection and Portability Act. - CORRECT ANSWER a)Health
Insurance Portability and Accountability Act"
"Which of the following is the proper tubing to install in a hospital type 1 oxygen system?
a) ASTM 8819 Hard drawn seamless medical gas tubing
b) AST MG327 medical gas copper tubing
c) Hard drawing seamless coper high pressure rated tubing
d) ASGRAW 189 medical gas copper tubing - CORRECT ANSWER a) ASTM 8819 Hard drawn
seamless medical gas tubing"
"Based on the following which is the lowest priority for replacement?
a) Acute Care Hospital
b) MOB
c) Children's Hosptial
2
,d) Behavior Health Hospital - CORRECT ANSWER b) MOB"
"A smoke compartment of a hospital built in 2001 is approximately 125'x150'. You are asked to
refit the nursing resource, break room and medication supply areas on one unit which
measures approximately 50'x75'. Which is more likely?
a) The AHJ will consider this a major rehabilitation and require compliance to chapter 18 of the
NFPA 101 (2000 Edition)
b)The AHJ will consider this a major rehabilitation and require compliance to chapter 18 of the
NFPA 101 (2000 Edition)
c) The AHJ will consider this a minor rehabilitation and require compliance to chapter 18 of
NFPA 101 (2000 Edition)
d) The AHJ will consider this a minor rehabilitation and require compliance to chapter 19 of
NFPA 101 (2000 Edition) - CORRECT ANSWER d) The AHJ will consider this a minor
rehabilitation and require compliance to chapter 19 of NFPA 101 (2000 Edition)-Less than 50%,
chapter 18 New, chapter 19 remodel"
"Which of the following could be included in the ICRMR?
a) Additional fire drills, conducted (2) times per quarter.
b) Negative pressure of the workspace in the relationship to the surrounding areas.
c) Scheduling work to minimize the impact of noise and vibration
d) Determination of patient risk levels - CORRECT ANSWER b) Negative pressure of the
workspace in the relationship to the surrounding areas.-Monitoring"
"You arrive onsite and are told the TJC is there for an inspection. How can you best assist the
hospital during this time?
a)Inspect your work site to insure that the the projects impact on life safety is minimized.
b) Inspect your worksite to ensure that the projects impact on infection control is minimized.
c) Gather ILSM records for review by the survey team
d) Reduce work level to the minimum possible, sending as many workers home as possible. -
CORRECT ANSWER c) Gather ILSM records for review by the survey team"
"Before beginning work in a BMT, you are asked to verify room pressures with a smoke
generator. Standing on the corridor side of the door to a patient room, which way should the
smoke trail flow?
a) Neither into the room nor out of the room
b) into the patient room
c) Away from the patient room
d) Either direction is acceptable - CORRECT ANSWER c) Away from the patient room"
2
, "Which of the following offers the best chronological order for a hospital construction project?
a) Functional program, architectural program, design development, construction drawings.
b) Arch program, functional program, design development, construction drawings.
c) Design development, architectural program, construction drawings, functional program.
d) Arch program, construction drawings, design development, functional program. - CORRECT
ANSWER a) Functional program, architectural program, design development, construction
drawings."
"You current project is in L&D, next to the NICU, and taking place over the hospitals BMT. Your
next phase calls for demolition of a portion of floor slab. Which statement best describes the
risk.
a) Noise and vibration in the L&D and NICU.
b) Dust generation in L&D and noise and vibration in the NICU
c) Noise and vibration in BMT and NICU
d) Dust generation in the BMT and noise and vibration in the NICU. - CORRECT ANSWER d)
Dust generation in the BMT and noise and vibration in the NICU."
"Which of following OR's is the smallest OR meeting the minium requirements of the 2010 FGI
for Health Care facilities for a class COR in outpatient surgical facility?
a) 17'9x22'9
b) 19'6x19'6
c) 19'3x21'3
d) 19'9x20'6 - CORRECT ANSWER d) 19'9x20'6 over 400SF with 20'"
"A newly acquired 25 year old MOB has 225K in deferred maint and you estimate another 300k
is required to add new services desired by the owner. A replacement structure will cost 1.5M.
What is the building FCI?
a) 6.7
b) .15
c) .35
d) .20 - CORRECT ANSWER b) .15 deferred maint./replacement cost"
"The door in a 2 hr rated fire barrier is required to have a rating of:
a) 20 min
b) 2 hr
c) 1-1/2hr
d) 45 min - CORRECT ANSWER b) 2 hr"