The last assignment for Unit 22, I will begin by interpreting the specification of a fabricated structure
to plan its manufacture.
PART NO. PART NAME REQUIRED MATERIAL AND DESCRIPTION
1 Bonnet 1 1.5mm, Aluminium (polished or painted)
2 Chassis 1 1.5mm, Aluminium (polished or painted)
3 Roof / Rear Panel 1 1.5mm, Aluminium (polished or painted)
4 Bonnet Trim 1 3mm, Coloured Acrylic (polished)
5 Grill 1 3mm, Coloured Acrylic (polished)
6 Grill Support 1 20 x 10 x 2mm, Aluminium Angle (polished)
7 Windscreen Support 1 20 x 10 x 2mm, Aluminium Angle (polished)
8 Windscreen 1 1.5mm, Aluminium (polished or painted)
9 Left Side Panel 1 1.5mm, Aluminium (polished or painted)
10 Right Side Panel 1 1.5mm, Aluminium (polished or painted)
11 Left Mudguard 1 1mm, Brass (polished)
12 Right Mudguard 1 1mm, Brass (polished)
The Health & Safety Aspect of this specification was to ensure:
- I wore an apron
- Smoothed the sharp edges
- Used googles when drilling
- Was trained to use the Guillotine
- Ensured hair tied back if was long enough to cause a hazard
- Was trained on how to properly file metal, acrylic with different tools
I used the specification to also bend my tools at certain degrees using the Bench Mounted Bending
Machine to fully prepare for assembly.
P6 Fahim Mohammed