NCCCO Tower Crane Test Questions &
Answers Verified
1. Splices in rall tracks shall have
Answer Smooth Joints
2. Hydraulic systems should have their proper fluid level checked
Answer Daily
3. If power fails during operations, the following shouldn't apply
Answer Do your best to finish moving load where it was designated to go
4. If load is undetermined who is to find out if load weight does not exceed
crane rating at radius at which the load is to be lifted
Answer Person responsible for lift
5. Where should climbing instructions be kept
1/
1 of 27 10/30/2024, 9:56
,NCCCO Tower Crane Test.pdf file:///C:/Users/HP/Desktop/New%20folder%20(2)/NCCCO%20Tow
Answer ON Site
6. All climbing operations shall be performed under the supervision of
Answer Quali- fied person
7. When cranes are erected, load limiting devices shall be tested for proper
setting and operation
Answer Before crane is placed in service
8. Hooks shall be equipped with latches unless the application makes the use of
the latch
Answer Impractical
9. Size and position of signs or panels must satisfy the limitations of
Answer Manu- facturer
10. Fall prevention measures are needed for working at locations where you
are exposed
Answer To a fall of 6ft or more
2/
2 of 27 10/30/2024, 9:56
,NCCCO Tower Crane Test.pdf file:///C:/Users/HP/Desktop/New%20folder%20(2)/NCCCO%20Tow
11. Travel distance on hand levers shall not be greater
Answer than 14 inches from neutral position
12. For power lines rated 175KV the minimum clearance between the lines and
any part of the crane or load is
Answer 15ft
13. All controls shall be tested by the operator at the
Answer start of new shift
14. Before each climbing operation all load members of the support system
shall be
Answer Inspected
15. Chain slings are required to be
Answer ID tagged
16. Welding on loads suspended by the crane can only be done if the load has
3/