Actions during fire delay - ✔✔✔Gyro spins to 42,000 rpm and the Pre-Fire sequence is sent to the
missile
Allowable degree of cant - ✔✔✔10 degrees left or right
Armour penetration - ✔✔✔over 30"
Battery life - ✔✔✔Surveillance 32- 126 degrees 14.5 hours
surveillance 25- 32 degrees 9- 14.5 hours
Max Power: 32-126 degrees 10 hours
Break Bridge Clamp - ✔✔✔Severs the command link wires
turns off the Xenon Tracker
Building engagements - ✔✔✔TOW BB: Fire adjacent to a door or below a window
TOW 2B: In line of sight, fire through the door or window
Cables used to connect the system - ✔✔✔PADS to TAS: PADS Interface Cable
TU to FCS: Coil Cable
FCS to LBB: Interface Cable
Cancel Track Gates - ✔✔✔Menu Method
Track Gate Switch Method
, Clearance requirements - ✔✔✔9" at the muzzle, 30 " around the line of sight from 500-900
DVO/LRF cleaning - ✔✔✔Squirt detergent on the lens, using a lens tissue, fold it in half, using the
untouched side, start in the center and make slow circles to the outer edge
Earth and timber bunker penetration - ✔✔✔21"
ECM used in the GEN 1/ GEN 2 missiles - ✔✔✔Warlock
Elevation - ✔✔✔10,000ft or higher
Elevation and depression limits - ✔✔✔Hood/side +/- 20 degrees
Rear hatch +20 to -13 degrees
limiters up and pinned +20 to -10
FCS - ✔✔✔Provides all computer functions required by the ITAS, Sends all necessary in flight missile
corrections, contains all circuitry necessary to test the ITAS
36lbs
Filter kit colors - ✔✔✔Red/Orange and Blue/silver
Half Sight method speed - ✔✔✔35KPH
Hangfire/ Misfire safety - ✔✔✔Move the missile 100m left or right, or place in a dud pit