SWPPP WALMART STORMWATER
POLLUTION PREVENTION PLAN ACTUAL
EXAM PAPER 2026 QUESTIONS WITH
SOLUTIONS GRADED A+
◉ Requirements for managing stormwater activity on a construction
site are outlined in the following regulation
Answer: NPDES
◉ Which of the following is never an allowable stormwater
discharge from a construction site
Answer: Discharge from contaminated ground water
◉ The notice of termination can be filed when
Answer: All construction activity, inside and outside of the building,
is complete and permanent stabilization has been verified as
adequate to meet permit requirements
◉ Relative to stormwater permitting all of the following must occur
before construction starts except
, Answer: Submit the notice of termination (NOT)
◉ The stormwater notice of intent (NOI) must be submitted
Answer: After the SWPPP is prepared and before starting
construction
◉ Potential pollutant sources stored on a construction site may
include
Answer: 1. Petroleum storage tanks
2. Soil sediments
3. Masonary material
4. ALL OF THE ABOVE
◉ The SWPPP inflammation sequence may be modified
Answer: After consulting with the project SWPPP Designer (CEC)
and, if required, the project owner and receiving written approval
◉ A SWPPP site map will show all of the following except
Answer: Notices of violation
◉ Which of the following information is to be posted at the entrance
of the site
Answer: 1. Construction site notice
POLLUTION PREVENTION PLAN ACTUAL
EXAM PAPER 2026 QUESTIONS WITH
SOLUTIONS GRADED A+
◉ Requirements for managing stormwater activity on a construction
site are outlined in the following regulation
Answer: NPDES
◉ Which of the following is never an allowable stormwater
discharge from a construction site
Answer: Discharge from contaminated ground water
◉ The notice of termination can be filed when
Answer: All construction activity, inside and outside of the building,
is complete and permanent stabilization has been verified as
adequate to meet permit requirements
◉ Relative to stormwater permitting all of the following must occur
before construction starts except
, Answer: Submit the notice of termination (NOT)
◉ The stormwater notice of intent (NOI) must be submitted
Answer: After the SWPPP is prepared and before starting
construction
◉ Potential pollutant sources stored on a construction site may
include
Answer: 1. Petroleum storage tanks
2. Soil sediments
3. Masonary material
4. ALL OF THE ABOVE
◉ The SWPPP inflammation sequence may be modified
Answer: After consulting with the project SWPPP Designer (CEC)
and, if required, the project owner and receiving written approval
◉ A SWPPP site map will show all of the following except
Answer: Notices of violation
◉ Which of the following information is to be posted at the entrance
of the site
Answer: 1. Construction site notice