WEEK 2: FEASIBILITY ANALYSIS
10 unread replies.2020 replies.
Compare and contrast any two components of a feasibility study? Is one
component more important than the other? Explain in detail.
This topic was locked Sep 14 at 11:59pm.
View Instructor posts View My Posts Search entries or author Filter replies by
unreadUnread Collapse replies Expand replies
Subscribed
Collapse SubdiscussionWilliam Ying
WILLIAM YING
Sep 4, 2020Sep 4 at
8:44am Manage
Discussion Entry
Hi class;
Compare and contrast any two components of a feasibility study? Is one
component more important than the other? Explain in detail.
Prof. Ying
o
Deepan Baid
DEEPAN BAID
Sep 6, 2020Sep 6 at
5:12pm Manage
Discussion Entry
The two of the several components of a feasibility study are
1) Design Summary
2) Economics
Design Summary:
The feasibility study must perform the project design to a minimum
level that allows the executives or board to make a final decision to
proceed with the project.
The project cost must be estimated to a level that:
Is sufficient to obtain project financing
10 unread replies.2020 replies.
Compare and contrast any two components of a feasibility study? Is one
component more important than the other? Explain in detail.
This topic was locked Sep 14 at 11:59pm.
View Instructor posts View My Posts Search entries or author Filter replies by
unreadUnread Collapse replies Expand replies
Subscribed
Collapse SubdiscussionWilliam Ying
WILLIAM YING
Sep 4, 2020Sep 4 at
8:44am Manage
Discussion Entry
Hi class;
Compare and contrast any two components of a feasibility study? Is one
component more important than the other? Explain in detail.
Prof. Ying
o
Deepan Baid
DEEPAN BAID
Sep 6, 2020Sep 6 at
5:12pm Manage
Discussion Entry
The two of the several components of a feasibility study are
1) Design Summary
2) Economics
Design Summary:
The feasibility study must perform the project design to a minimum
level that allows the executives or board to make a final decision to
proceed with the project.
The project cost must be estimated to a level that:
Is sufficient to obtain project financing