SWM DEQ Actual Exam for 2024-2025 Exam
Questions with 100% Correct Answers | Verified |
Updated (Actual Exam) 2025\2026 LATEST
VERSION!!
Save
Terms in this set (114)
The Virginia Stormwater Virginia Stormwater Management Act, Virginia
Management Program is Stormwater Management Program Regulation
authorized by the ______
and administered through
the ______
VPDES greater than or equal to an acre
Permit/Construction GP
authorizes discharge of
stormwater from
construction activities that
are
The Stormwater permit, regulate, and control stormwater runoff
Management Act requires
the State Water Control
Board to
DEQ has ___ days to 90
complete review of real or
potential inter-
jurisdictional impacts upon
request
https://quizlet.com/1113576036/swm-deq-actual-exam-for-2024-2025-exam-questions-with-100-correct-answers-verified-updated-actual-exam-20252… 1/13
, 11/26/25, 3:27 PM SWM DEQ Actual Exam for 2024-2025 Exam Questions with 100% Correct Answers | Verified | Updated (Actual Exam) 2025\2026…
The Stormwater staff of a stormwater program, anyone contracted by
Management Act requires a VSMP authority, standard and specification holders
the following individuals
to obtain and maintain a
certificate of competency
The dual certificate will the latest date of the certificates
expire three years from
SWM plan must be VSMP program authority
approved by ___ before
land disturbance
The water quality criteria 0.41 lbs/acre/year
sets a site-based load limit
of ____ of total phosphorus
for new development
The phosphorus load limit 10% impervious cover
uses the
Part II B and II C water channel protection and flood protection
quantity criteria addresses
Which two plans in the SWM plan, ESC plan
SWPPP must be
approved?
Does the SWM plan post-construction
address runoff during or
after construction?
What is the lower limit of 10%
the range of
imperviousness that can
result in stream
degradation?
What do land disturbing excavating, clearing, grading
activities consist of?
https://quizlet.com/1113576036/swm-deq-actual-exam-for-2024-2025-exam-questions-with-100-correct-answers-verified-updated-actual-exam-20252… 2/13
SWM DEQ Actual Exam for 2024-2025 Exam
Questions with 100% Correct Answers | Verified |
Updated (Actual Exam) 2025\2026 LATEST
VERSION!!
Save
Terms in this set (114)
The Virginia Stormwater Virginia Stormwater Management Act, Virginia
Management Program is Stormwater Management Program Regulation
authorized by the ______
and administered through
the ______
VPDES greater than or equal to an acre
Permit/Construction GP
authorizes discharge of
stormwater from
construction activities that
are
The Stormwater permit, regulate, and control stormwater runoff
Management Act requires
the State Water Control
Board to
DEQ has ___ days to 90
complete review of real or
potential inter-
jurisdictional impacts upon
request
https://quizlet.com/1113576036/swm-deq-actual-exam-for-2024-2025-exam-questions-with-100-correct-answers-verified-updated-actual-exam-20252… 1/13
, 11/26/25, 3:27 PM SWM DEQ Actual Exam for 2024-2025 Exam Questions with 100% Correct Answers | Verified | Updated (Actual Exam) 2025\2026…
The Stormwater staff of a stormwater program, anyone contracted by
Management Act requires a VSMP authority, standard and specification holders
the following individuals
to obtain and maintain a
certificate of competency
The dual certificate will the latest date of the certificates
expire three years from
SWM plan must be VSMP program authority
approved by ___ before
land disturbance
The water quality criteria 0.41 lbs/acre/year
sets a site-based load limit
of ____ of total phosphorus
for new development
The phosphorus load limit 10% impervious cover
uses the
Part II B and II C water channel protection and flood protection
quantity criteria addresses
Which two plans in the SWM plan, ESC plan
SWPPP must be
approved?
Does the SWM plan post-construction
address runoff during or
after construction?
What is the lower limit of 10%
the range of
imperviousness that can
result in stream
degradation?
What do land disturbing excavating, clearing, grading
activities consist of?