100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

ABC Wastewater Verified Multiple Choice and Conceptual Actual Frequently Tested Exam Questions With Reviewed 100% Correct Detailed Answers Guaranteed Pass!!Current Update!!

Rating
-
Sold
-
Pages
18
Grade
A+
Uploaded on
09-10-2025
Written in
2025/2026

ABC Wastewater Verified Multiple Choice and Conceptual Actual Frequently Tested Exam Questions With Reviewed 100% Correct Detailed Answers Guaranteed Pass!!Current Update!! Federally approved lab methods Table 1 Title 40 CFR part 136, EPA>standard methods regulatory reporting - compliance, permit reporting; if you sample any compliance point, you MUST report it process control - To monitor and control a process so that the quality of the output/product improves. do not have to report Federal Register - An official document, published every weekday, which lists the new and proposed regulations of executive departments and regulatory agencies; amendments made to the title 40 CFR; Code of Federal Regulations - A reference work that compiles regulations of all agencies in a series of volumes; published July 1 every year CFR Title 40 Part 136 - guidelines establishing test procedures for the analysis of pollutants; lists methods with 4 letters and one number: 5210D - BOD; tables include all approved methods for all required NPDES analyses EPA Form 3320 - DMR, must be completed and postmarked by 15th of month proceeding testing month; must have lab analyst cert or WW2 cert to sign reporting ethics - federally approved test methods must be used, samples must be representative, and no falsification of data EPA requirements for good data - sampling objectives, representative samples, sample integrity maintained, CoC and ID, Field QA, proper analysis Where so most errors in lab result occur? sampling process Grab sample- A single sample of water collected at a particular time and place that represents the composition of the water only at that time and place; no holding time

Show more Read less
Institution
ABC Wastewater Collection
Course
ABC Wastewater Collection










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ABC Wastewater Collection
Course
ABC Wastewater Collection

Document information

Uploaded on
October 9, 2025
Number of pages
18
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ABC Wastewater Verified Multiple Choice and Conceptual Actual Frequently Tested
Exam Questions With Reviewed 100% Correct Detailed Answers
Guaranteed Pass!!Current Update!!

Two basic motives for treating wastewater Public health and protection of environment
the ability of the natural system to accept certain pollutants
Assimilative Capacity and render them benign or inottensive; pollution occurs
when this capacity is exceeded
The Great Stink London, 1800's, outbreak of cholera
Broad street pump handle incident, mapped cholera
John Snow
deaths
EPA formed by Nixon in 1970, 44 federal agencies
Title 40 CFR Subchapter D Part 136, (1977) Sets standards
of waste discharge into US water by industry. Also con-
tinues requirements to set water quality standards for all
contaminants in surface waters. It makes it unlawful for
Clean Water Act
any person to discharge any pollutant from a point source
into navigable waters, unless a permit is obtained. It also
recognizes the need for planning to address the critical
problems posed by nonpoint source pollution.
NPDES National Pollutant Discharge Elimination System
DMR Discharge Monitoring Report
LAS Land Application System
The state of being first or most important; state can make
primacy changes to federal program as long as it doesn't lessen
the federal program
an independent federal agency established to coordinate
programs aimed at reducing pollution and protecting the
EPA
environment, Environmental Protection Agency has pri-
macy over state environmental agencies

2 fps, at least



,ABC Wastewater Verified Multiple Choice and Conceptual Actual Frequently Tested
Exam Questions With Reviewed 100% Correct Detailed Answers
Guaranteed Pass!!Current Update!!
velocity of water coming into the plant, if less, organics will
settle out and cause anaerobic respiration, allowed to slow
to about 1 fps
preliminary treatment designed to remove large solid materials (bar screens)
designed to capture floatable and settleable solids;ac-
primary treatment complished in clarifiers; flow reduced to 1fps to allow
solids to settle and floatables to rise
percent of solid/percent of BOD removed during primary
60%/30%
treatment
designed to cleanse water by stabilizing organic waste;
Secondary treatment of wastewater microorganisms encouraged to feed on organic matter;
must achieve 85% removal of original waste concentration
bacteria primary organisms used in secondary treatment
microorganisms used in secondary treatment algae, bacteria, ciliates, rotifers
mixed liquor is sent to secondary clarifiers for final liq-
uids/solids separation where wasting(WAS) and return-
secondary clarification ing (RAS) occurs; to maintain activated sludge, portion of
settled solids returned (RAS) to head of secondary treat-
ment process
designed to eliminate the pathogenic bacteria contained
disinfection-municipal plant in wastewater; most commonly achieved by chlorination;
other types: UV, ozone
sludge processed in aerobic or anaerobic digesters; bac-
solids handling teria feed on waste to reduce volume; reduction of sludge
volume primary purpose
sludge dewatered using belt presses, centrifuges, drying
solids dewatering beds, vacuum filtration and disposed of by incineration,
land filling (usual way), composting, land application



, ABC Wastewater Verified Multiple Choice and Conceptual Actual Frequently Tested
Exam Questions With Reviewed 100% Correct Detailed Answers
Guaranteed Pass!!Current Update!!
Federally approved lab methods Table 1 Title 40 CFR part 136, EPA>standard methods
compliance, permit reporting; if you sample any compli-
regulatory reporting
ance point, you MUST report it
To monitor and control a process so that the quality of the
process control
output/product improves. do not have to report
An oflcial document, published every weekday, which lists
the new and proposed regulations of executive depart-
Federal Register
ments and regulatory agencies; amendments made to the
title 40 CFR; epa.gov/fedrgstr/
A reference work that compiles regulations of all agencies
Code of Federal Regulations
in a series of volumes; published July 1 every year
guidelines establishing test procedures for the analysis of
pollutants; lists methods with 4 letters and one number:
CFR Title 40 Part 136
5210D - BOD; tables include all approved methods for all
required NPDES analyses
DMR, must be completed and postmarked by 15th of
EPA Form 3320 month proceeding testing month; must have lab analyst
cert or WW2 cert to sign
federally approved test methods must be used, samples
reporting ethics
must be representative, and no falsification of data
sampling objectives, representative samples, sample in-
EPA requirements for good data
tegrity maintained, CoC and ID, Field QA, proper analysis
Where so most errors in lab result occur? sampling process
A single sample of water collected at a particular time and
grab sample place that represents the composition of the water only at
that time and place; no holding time
number of grab samples at equal intervals; representative
composite sample
of average conditions of flow over set period of time

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NURSINGDICTIONARY Chamberlain College Of Nursing
Follow You need to be logged in order to follow users or courses
Sold
243
Member since
2 year
Number of followers
87
Documents
2525
Last sold
1 week ago
NURSING ENCYCLOPEDIA

Our mission is to bring students and learners together and help you to get through your studies, courses and exams. Providing Well Revised Expert Information.

4.1

28 reviews

5
14
4
5
3
7
2
1
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions