100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

NEVADA RESIDENTIAL & SMALL COMMERCIAL (B-2) CONTRACTOR TRADE exam Questions with 100% Correct Answer Latest Versions 2025 Top Rated .

Rating
-
Sold
-
Pages
70
Grade
A+
Uploaded on
16-12-2025
Written in
2025/2026

NEVADA RESIDENTIAL & SMALL COMMERCIAL (B-2) CONTRACTOR TRADE exam Questions with 100% Correct Answer Latest Versions 2025 Top Rated .

Institution
NEVADA RESIDENTIAL & SMALL COMMERCIAL
Module
NEVADA RESIDENTIAL & SMALL COMMERCIAL











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NEVADA RESIDENTIAL & SMALL COMMERCIAL
Module
NEVADA RESIDENTIAL & SMALL COMMERCIAL

Document information

Uploaded on
December 16, 2025
Number of pages
70
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NEVADA RESIDENTIAL & SMALL COMMERCIAL
(B-2) CONTRACTOR TRADE exam Questions with
100% Correct Answer Latest Versions 2025 Top
Rated


1. For metal framing in a small commercial building, what is a
primary concern compared to wood framing?
A. Moisture resistance
B. Termite damage
C. Thermal bridging C
D. Shrinkage
Steel is a good conductor of heat, so thermal bridging (heat
transfer) is more significant.
2. When laying floor joists in carpentry, what is the typical maximum
span between supports, depending on joist size and load?
A. 4 ft
B. 8 ft
C. 16 ft C
D. 24 ft
Joist span tables often allow spans around 16 f t for common
residential loads.
3. What is the main purpose of a vapor barrier in thermal and

,moisture protection?
A. To stop rain ingress
B. To prevent moisture diffusion from the warm side B
C. To insulate thermal energy
D. To support structural loads

, A vapor barrier prevents water vapor from migrating into cold
areas where it may condense.
4. In door installation, the “rough opening” refers to:
A. The finished size of the door frame
B. The size of the door slab
C. The framed opening before drywall C
D. The size after the trim is installed
Rough opening is the structural framed space before finishes.
5. For drywall finish level 5, what is typically required?
A. One coat of joint compound
B. Two coats, lightly sanded
C. Three coats of joint compound and a skim coat C
D. Texture finish only
Level 5 finish is the highest quality — three coats plus a thin skim
over the surface.
6. According to OSHA safety regulations (as they apply to
construction), which of the following is required on a job site?
A. Fall protection for work above 4 ft A
B. Safety glasses only for power tools
C. Hard hats only near crane operations
D. No protection required for masonry
OSHA requires fall protection when working at certain heights;
specifics may depend on the situation.
7. In plan reading, a scale of 1/4" = 1'-0" means:
A. 4 inches on drawing equals 1 foot in real life

, B. 1 foot on drawing equals 4 feet in real life
C. 1/4 inch on drawing equals 1 foot in real life C

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
KGeorge Western Governors University
View profile
Follow You need to be logged in order to follow users or courses
Sold
127
Member since
2 year
Number of followers
25
Documents
4065
Last sold
6 days ago

3.6

27 reviews

5
13
4
1
3
7
2
2
1
4

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions