1. What is the primary purpose of commercial building codes?
A. To increase construction costs
B. To ensure safety and structural performance Building codes exist to
protect public safety, health, and structural reliability.
C. To favor certain contractors
D. To reduce labor requirements
2. A building’s occupancy classification is based on:
A. Local zoning ordinances
B. Intended use of the building Occupancy is determined by how the
building will be used (e.g., office, retail, assembly).
C. Number of parking spaces
D. Construction budget
3. Type I building construction is characterized by:
A. Wood framing only
B. Non-rated steel framing
C. Fire-resistive materials (e.g., concrete, protected steel) Type I provides
the highest level of fire resistance.
D. No fire resistance
4. Which document provides the official written authorization to begin
construction?
A. Inspection report
, B. Building permit Issued by the authority to approve construction work.
C. Plans submittal
D. Certificate of occupancy
5. A certificate of occupancy is issued:
A. Before construction starts
B. After final inspection It confirms the building is safe and code-compliant
for use.
C. During structural framing
D. After foundation curing
6. Live load refers to:
A. Weight of building materials
B. Variable loads like occupants and furniture Live loads change over time
due to occupancy.
C. Soil bearing capacity
D. Wind pressure only
7. Structural drawings typically show:
A. Furniture layouts
B. Load-bearing components Structural drawings include beams, columns,
foundations, etc.
C. Paint finishes
D. Landscape plans
8. Fire-rated walls are designed to:
A. Support more load
B. Resist fire for a specified duration Rated assemblies contain fire and
protect occupants.
C. Improve insulation only
D. Reduce maintenance
9. Which construction delivery method has the contractor involved during
design?
A. Design-bid-build
, B. Design-build Single entity provides design and construction; collaboration
earlier.
C. Competitive sealed bid
D. Low-bid procurement
10.HVAC systems in commercial buildings primarily regulate:
A. Paint drying
B. Indoor temperature, humidity, and air quality HVAC supports comfort
and health of occupants.
C. Fire sprinkler pressure
D. Sewer flow
11.What is the purpose of seismic design features?
A. Increase building height
B. Minimize damage during earthquakes Designed to reduce structural
failure during seismic activity.
C. Improve insulation
D. Reduce lighting requirements
12.A commercial roof parapet is used to:
A. Increase window area
B. Provide decorative floor trim
C. Provide safety and help control fire spread Acts as barrier at roof edge
and limits flames.
D. Reduce HVAC load
13.Concrete achieves most of its strength within:
A. 1 day
B. 3 days
C. 28 days Standard curing time to reach design compressive strength.
D. 60 days
14.A building’s egress system must allow:
A. Emergency HVAC cooling
B. Safe occupant escape during an emergency Egress is essential for life
LATEST 2026 VERSION WITH 100 QUESTIONS AND
CORRECT DETAILED ANSWERS (VERIFIED
ANSWERS) |ALREADY GRADED A+||BRAND NEW
VERSION!!
1. What is the primary purpose of commercial building codes?
A. To increase construction costs
B. To ensure safety and structural performance Building codes exist to
protect public safety, health, and structural reliability.
C. To favor certain contractors
D. To reduce labor requirements
2. A building’s occupancy classification is based on:
A. Local zoning ordinances
B. Intended use of the building Occupancy is determined by how the
building will be used (e.g., office, retail, assembly).
C. Number of parking spaces
D. Construction budget
3. Type I building construction is characterized by:
A. Wood framing only
B. Non-rated steel framing
C. Fire-resistive materials (e.g., concrete, protected steel) Type I provides
the highest level of fire resistance.
D. No fire resistance
4. Which document provides the official written authorization to begin
construction?
A. Inspection report
, B. Building permit Issued by the authority to approve construction work.
C. Plans submittal
D. Certificate of occupancy
5. A certificate of occupancy is issued:
A. Before construction starts
B. After final inspection It confirms the building is safe and code-compliant
for use.
C. During structural framing
D. After foundation curing
6. Live load refers to:
A. Weight of building materials
B. Variable loads like occupants and furniture Live loads change over time
due to occupancy.
C. Soil bearing capacity
D. Wind pressure only
7. Structural drawings typically show:
A. Furniture layouts
B. Load-bearing components Structural drawings include beams, columns,
foundations, etc.
C. Paint finishes
D. Landscape plans
8. Fire-rated walls are designed to:
A. Support more load
B. Resist fire for a specified duration Rated assemblies contain fire and
protect occupants.
C. Improve insulation only
D. Reduce maintenance
9. Which construction delivery method has the contractor involved during
design?
A. Design-bid-build
, B. Design-build Single entity provides design and construction; collaboration
earlier.
C. Competitive sealed bid
D. Low-bid procurement
10.HVAC systems in commercial buildings primarily regulate:
A. Paint drying
B. Indoor temperature, humidity, and air quality HVAC supports comfort
and health of occupants.
C. Fire sprinkler pressure
D. Sewer flow
11.What is the purpose of seismic design features?
A. Increase building height
B. Minimize damage during earthquakes Designed to reduce structural
failure during seismic activity.
C. Improve insulation
D. Reduce lighting requirements
12.A commercial roof parapet is used to:
A. Increase window area
B. Provide decorative floor trim
C. Provide safety and help control fire spread Acts as barrier at roof edge
and limits flames.
D. Reduce HVAC load
13.Concrete achieves most of its strength within:
A. 1 day
B. 3 days
C. 28 days Standard curing time to reach design compressive strength.
D. 60 days
14.A building’s egress system must allow:
A. Emergency HVAC cooling
B. Safe occupant escape during an emergency Egress is essential for life