What is a stakeholder -
correct answer ✅A stakeholder is an individual, group, or
organization who may affect, be affected by, or perceive itself to be
affected by a decision, activity, or outcome of a project.
Interactive communication -
correct answer ✅Between two or more parties performing a
multidirectional exchange
of information. It is the most efficient way to ensure a common
understanding by all participants on
specified topics, and includes meetings, phone calls, instant
messaging, video conferencing, etc.
Push communication. -
correct answer ✅Sent to specific recipients who need to receive
the information. This ensures
that the information is distributed but does not ensure that it
actually reached or was understood by the
intended audience. Push communications include letters, memos,
reports, emails, faxes, voice mails,
blogs, press releases, etc.
, Project Management Fbla Exam
Questions With 100% Verified Answers
Pull communication -
correct answer ✅Used for very large volumes of information, or
for very large audiences, and
requires the recipients to access the communication content at
their own discretion. These methods
include intranet sites, e-learning, lessons learned databases,
knowledge repositories, etc.
Schedule variance. -
correct answer ✅Schedule variance (SV) is a measure of schedule
performance expressed as the
difference between the earned value and the planned value. It is
the amount by which the project is ahead
or behind the planned delivery date, at a given point in time. It is a
measure of schedule performance on
a project. It is equal to the earned value (EV) minus the planned
value (PV). The EVM schedule variance is
a useful metric in that it can indicate when a project is falling
behind or is ahead of its baseline schedule.
The EVM schedule variance will ultimately equal zero when the
project is completed because all of the
Questions With 100% Verified Answers
What is a stakeholder -
correct answer ✅A stakeholder is an individual, group, or
organization who may affect, be affected by, or perceive itself to be
affected by a decision, activity, or outcome of a project.
Interactive communication -
correct answer ✅Between two or more parties performing a
multidirectional exchange
of information. It is the most efficient way to ensure a common
understanding by all participants on
specified topics, and includes meetings, phone calls, instant
messaging, video conferencing, etc.
Push communication. -
correct answer ✅Sent to specific recipients who need to receive
the information. This ensures
that the information is distributed but does not ensure that it
actually reached or was understood by the
intended audience. Push communications include letters, memos,
reports, emails, faxes, voice mails,
blogs, press releases, etc.
, Project Management Fbla Exam
Questions With 100% Verified Answers
Pull communication -
correct answer ✅Used for very large volumes of information, or
for very large audiences, and
requires the recipients to access the communication content at
their own discretion. These methods
include intranet sites, e-learning, lessons learned databases,
knowledge repositories, etc.
Schedule variance. -
correct answer ✅Schedule variance (SV) is a measure of schedule
performance expressed as the
difference between the earned value and the planned value. It is
the amount by which the project is ahead
or behind the planned delivery date, at a given point in time. It is a
measure of schedule performance on
a project. It is equal to the earned value (EV) minus the planned
value (PV). The EVM schedule variance is
a useful metric in that it can indicate when a project is falling
behind or is ahead of its baseline schedule.
The EVM schedule variance will ultimately equal zero when the
project is completed because all of the