100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Cosc 275 Final Exam Questions and Answers Graded A+

Rating
-
Sold
-
Pages
12
Grade
A+
Uploaded on
25-11-2025
Written in
2025/2026

Cosc 275 Final Exam Questions and Answers Graded A+

Institution
PN 3006
Course
PN 3006









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
PN 3006
Course
PN 3006

Document information

Uploaded on
November 25, 2025
Number of pages
12
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Cosc 275 Final Exam Questions and
Answers Graded A+

Estimating - Correct answer-The process of determining the anticipated cost of

materials, labor, and equipment of a proposed project.

take off - Correct answer-The process in which detailed lists are compiled, based

on drawings and specifications, of all the material and equipment necessary to

construct a project. The cost estimator uses this list to calculate how much it will

cost to build the project.

quantities - Correct answer-Measured amounts of construction items expressed in

their customary units.

quantification - Correct answer-In estimating an activity to translate project scope

information into resource quantities suitable for costing. In the engineering and

construction industry, a takeoff is a specific type of quantification that is a

measurement and listing of quantities of materials from drawings.

quantity survey - Correct answer-A detailed analysis of material and equipment

required to construct a project.


©COPYRIGHT 2025, ALL RIGHTS RESERVED 1

, area - Correct answer-A measurement of a given planar region or of the surface of

a solid.

area method - Correct answer-A construction cost estimating system employing

unit square foot costs multiplied by the adjusted gross floor area of a building.

length - Correct answer-The longest dimension of an object.

Linear measurement - Correct answer-A unit or system of units for measuring

length: 12" = 1', 3' = 1 yard, 1 yard = 0.9144 meters, 1 mile = 5,280 feet.

dimension - Correct answer-A distance between two points, lines, or planes.

specifications or specs - Correct answer-Documents that define the qualitative

requirements for products, materials,

and workmanship upon which the contract for construction is based.

Drawings - Correct answer-Graphic illustrations depicting the dimensions, design,

and location of a

project. Generally including plans, elevations, details, diagrams, schedules,

and sections.

Addendum - Correct answer-A document describing an addition, change,

correction, or modification to contract


©COPYRIGHT 2025, ALL RIGHTS RESERVED 2
$11.69
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
TutorJessica

Get to know the seller

Seller avatar
TutorJessica Yale University
View profile
Follow You need to be logged in order to follow users or courses
Sold
4
Member since
2 months
Number of followers
0
Documents
5082
Last sold
1 week ago
TUTOR JESSICA

Welcome to my store, here you will come across tutor verified study materials you may need for your exam preparation.

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions