All SWPPP requirements may be met through - ANS-incorporating other plans into reference, or
by developing missing factors.
At what % impervious cover are streams substantially affected? - ANS-25%
Co-placed practices - ANS-During creation, a facility features for ESC, and is later constructed
into a stormwater BMP.
Define LDA - ANS-Land disturbing activity; any man-made change to the land floor that
doubtlessly adjustments its runoff characteristics; includes clearing, grading, and excavation.
During production, while need to inspector make sure a BMP isn't hooked up? - ANS-BMP have
to not be set up before contirbuting drainage vicinity has been stabilized.
How long does operator must notify DEQ of an unauthorized discharge? How lengthy does
operator must make a written document of this? - ANS-inside 24 hours of discovery for
notification, within 5 days for written acknowledgement.
How lengthy does operator need to revise SWPPP if authority deems it necessary? How lengthy
does local authority ought to evaluate any modifications to SWPPP? - ANS-7 days for operator
to make modifications, 60 days for authority to study modifications.
How long does VSMP authority must evaluate SWM plan? - ANS-15 days to review and
determine approval, and notify applicant.
How long ought to operator preserve routine inspection reviews? - ANS-At least 3 years after
the GP expires/terminates.
How long must VSMP authority maintain production report drawings? - ANS-Until the relevant
SWM facility is eliminated.
How frequently must a VSMP authority inspect an LDA? - ANS-Periodically.
How soon after very last grade of a domain ought to flora be installed place? - ANS-within 7
days.
How soon after meeting permit necessities need to the VSMP authority return any bonds or
securities to operator? - ANS-inside 60 days.