100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

CONSTRUCTION QUALITY MANAGEMENT FOR CONTRACTORS (CQM-C) | 2025/2026 EXAM ACTUAL EXAM QUESTIONS AND CORRECT ANSWERS WITH RATIONALES GRADED A+ LATEST

Puntuación
-
Vendido
-
Páginas
49
Grado
A+
Subido en
12-11-2025
Escrito en
2025/2026

CONSTRUCTION QUALITY MANAGEMENT FOR CONTRACTORS (CQM-C) | 2025/2026 EXAM ACTUAL EXAM QUESTIONS AND CORRECT ANSWERS WITH RATIONALES GRADED A+ LATEST CQM-C Exam, covering foundational knowledge, advanced QA/QC scenarios, safety integration, subcontractor management, and final project closeout with detailed rationales for every question.

Mostrar más Leer menos
Institución
CQM-C
Grado
CQM-C











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
CQM-C
Grado
CQM-C

Información del documento

Subido en
12 de noviembre de 2025
Número de páginas
49
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

CONSTRUCTION QUALITY MANAGEMENT FOR
CONTRACTORS (CQM-C) | 2025/2026 EXAM
ACTUAL EXAM QUESTIONS AND CORRECT
ANSWERS WITH RATIONALES GRADED A+
LATEST

CQM-C Actual Exam
1.
Which of the following best defines quality control (QC) in construction?
A. Ensuring project cost stays within budget
B. The process of monitoring construction activities to ensure compliance with
specifications
C. Managing project schedule and workforce
D. Negotiating contracts with subcontractors
✅ Answer: B. The process of monitoring construction activities to ensure
compliance with specifications
Rationale:
Quality control focuses on verifying that construction work meets project
specifications and contractual requirements. Cost and schedule are important but
are not the primary focus of QC.


2.
A contractor identifies a defect in concrete work after pouring. The most
appropriate immediate action is:
A. Continue construction and document the defect
B. Stop work, isolate the affected area, and notify the responsible parties
C. Attempt minor fixes without approval
D. Ignore the defect if it seems minor

,✅ Answer: B. Stop work, isolate the affected area, and notify the responsible
parties
Rationale:
Early identification and isolation prevent defects from affecting the entire project.
Documentation and proper notification maintain accountability.


3.
Which document typically describes the quality requirements for a construction
project?
A. Project schedule
B. Contract specifications
C. Purchase orders
D. Safety manual
✅ Answer: B. Contract specifications
Rationale:
Contract specifications provide detailed quality expectations, materials,
workmanship standards, and testing requirements.


4.
A contractor wants to implement a systematic approach to prevent defects rather
than just detect them. This is called:
A. Quality Assurance (QA)
B. Quality Control (QC)
C. Risk Management
D. Project Scheduling

✅ Answer: A. Quality Assurance (QA)
Rationale:
QA is proactive, focusing on preventing errors by establishing processes and
standards, whereas QC is reactive, detecting defects after they occur.

,5.
Which of the following is a key responsibility of a CQM-C certified
professional?
A. Estimating project costs
B. Overseeing quality management processes and ensuring compliance with
specifications
C. Drafting legal contracts
D. Managing subcontractor payroll

✅ Answer: B. Overseeing quality management processes and ensuring
compliance with specifications
Rationale:
CQM-C professionals focus on quality management, inspection, documentation,
and verification to meet project requirements.


6.
A project requires documentation of all inspections, tests, and corrective actions.
The primary purpose is:
A. To create a marketing portfolio
B. To provide evidence of compliance for audits and regulatory review
C. To satisfy the architect’s curiosity
D. To reduce labor costs
✅ Answer: B. To provide evidence of compliance for audits and regulatory
review
Rationale:
Documentation serves as a permanent record that the work meets specifications
and can be reviewed during audits or disputes.

, 7.
A contractor notices that a subcontractor is not following approved welding
procedures. The correct CQM-C action is:
A. Allow the work to continue and inspect later
B. Immediately stop work, document the issue, and ensure corrective action is
implemented
C. Ignore and report at project completion
D. Ask the subcontractor to fix it at their convenience
✅ Answer: B. Immediately stop work, document the issue, and ensure
corrective action is implemented
Rationale:
Non-compliance with approved procedures can compromise safety and quality;
immediate corrective action prevents escalation.


8.
Which type of inspection is performed before work begins to verify materials,
equipment, and preparations?
A. Final inspection
B. Pre-construction or pre-installation inspection
C. Corrective inspection
D. Post-construction audit

✅ Answer: B. Pre-construction or pre-installation inspection
Rationale:
Pre-construction inspections ensure that all prerequisites are met and work starts
according to specifications, preventing later issues.
$29.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
johnkibathi28 Chamberlain College Of Nursing
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
43
Miembro desde
2 año
Número de seguidores
15
Documentos
681
Última venta
1 semana hace
Best Studyguide Resources

Welcome to Best Studyguide Resources – your trusted source for accurate, reliable, and up-to-date study materials. As a certified tutor, I understand how important the right resources are for exam preparation and academic success. That’s why every guide, test bank, and study package in this shop is carefully curated, professionally organized, and designed to help you succeed. I am committed to delivering only top-tier documents to ensure the best outcomes for your academic success. Gain instant access to expertly curated materials designed to help you excel in your studies and certifications. Take the next step toward achieving your academic and professional goals Feedback is always welcome. I encourage all clients to leave a review after purchase—whether positive or constructive—to help me improve and continue offering the best possible support.

Lee mas Leer menos
3.5

8 reseñas

5
5
4
0
3
0
2
0
1
3

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes