MED GAS Exam Newest 2025/2026 Complete Questions And Correct Detailed Answers (Verified Answers) |Brand New Version!!

Puntuación
-
Vendido
-
Páginas
29
Grado
A+
Subido en
11-11-2025
Escrito en
2025/2026

A series of exam questions and answers related to medical gas systems, specifically covering topics such as outdoor manifold enclosures, instrument air reserve headers, medical gas piping installation requirements, labeling and color coding, patient care room definitions, oxygen cylinder storage, medical gas supply sources, brazing and welding requirements, and various other aspects of medical gas systems as per the nfpa 99 code.

Mostrar más Leer menos
Institución
MED GAS
Grado
MED GAS










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
MED GAS
Grado
MED GAS

Información del documento

Subido en
11 de noviembre de 2025
Número de páginas
29
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

MED GAS Exam Newest 2025/2026
Complete Questions And Correct
Detailed Answers (Verified Answers)
|Brand New Version!!

Central Supply systems for positive pressure gases shall have one or more
relief valves, the valves shall have a relief setting that is ____% above
normal operating pressure = - ANSWER-50%


when vented to the outside, relief valve vent lines shall be labeled in which
way? - ANSWER-any mater that will distinguish them from medical gas
pipeline


medical gas system? - ANSWER-workers who are not certified cannot
install piping or components


non certified personnel are permitted to install category 3 medical gas
systems under which of these conditions - ANSWER-it is never permitted


when and where are flexible metallic joints permitted in the med gas
system? - ANSWER-when provided with extensions for brazing


besides the name, what other method is acceptable to identify station inlets
and outlets for the specific medical gas or vacuum - ANSWER-Chemical
Symbol

,medical gas piping shall be labeled by _______ identifying it as a patient
gas, support gas , support gas , or vacuum system - ANSWER-stenciling or
adhesive markers


in the medical gas system which of these methods is NOT permitted for
identifying medical gas and vacuum systems - ANSWER-adhesive markers
with the name of the system, stenciling name of system, stenciling
chemical symbol


what is the standard vacuum pressure for WAGD - ANSWER-it varies with
the system


piping systems for patient gas/ vacuum shall _____ used for the distribution
of flammable anesthetic gases - ANSWER-not be


Medical gas systems shall be deemed breached at the point of intrusion by
________ or by system component removal, replacement, or addition -
ANSWER-physical separation


which test shall follow immediately after the installer initial blow down test?
- ANSWER-system verification test


where piping test are required for the installer prior tot the system
verification, they shall be preformed and documented using ____ as test
gas. - ANSWER-oil free nitrogen


when shall the quality of medical air, as delivered by the compressor air
supply, be verified after installation of new components - ANSWER-before
patient use

, when components have been replaced in manifolds or compressors, the
system shall be determined breached and shall be required to be -
ANSWER-inspected and tested


what test shall be performed after the initial cross connection test? -
ANSWER-alarm test


who shall witness the 24 hr standing pressure test of the positive pressure
piping system in a category 1 facility - ANSWER-AHJ, or its designee


a valve installed in each medical gas and vacuum system shall be tested to
verify which of the following - ANSWER-proper operation and rooms or
areas of control


the installer shows documentation that the initial pressure test was
conducted at 50psi on the vacuum system. What pressure should the
installer have performed this test at? - ANSWER-150psi


after the installer performed test were completed, the installer shall perform
the cross connection test to determine that no cross connection exist.
which method should be used to determine this? - ANSWER-individual
pressurization, or pressure differential


the standing pressure test for positive pressure med gas piping shall be
conducted with the source valve closed and the piping system subjected to
which test time and pressure? - ANSWER-24 hours at 20% above normal
operating pressure


how many hours must the medical air compressor system be operating
normally before an air quality test can be performed? - ANSWER-12 hours
$23.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
lornezyeng
1.0
(1)

Conoce al vendedor

Seller avatar
lornezyeng Teachme2-tutor
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
2
Miembro desde
1 año
Número de seguidores
2
Documentos
179
Última venta
1 año hace

1.0

1 reseñas

5
0
4
0
3
0
2
0
1
1

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes