WISCONSIN NHA FINAL EXAM 2 VERSIONS 2025/2026
NEWEST ACTUAL EXAM WITH COMPLETE QUESTIONS AND
VERIFIED ANSWERS |ALREADY GRADED A+|
What is the fee for permission to start construction? -ANSWERS-
$80. This fee shall apply to those applicants proposing to start
construction prior to the approval of the plans by the department
What is the fee for plan revision? -ANSWERS-$100. This occurs
when plans are revised for reasons other than those that were
requested by the department.
What is a fee for extension of plan approval? -ANSWERS-The
examination fee for a plan previously approved by the department
for which an approval extension was requested beyond the time
limit specified. $75
What fee shall the department charge for a handling fee to the
submitting party? -ANSWERS-$50
, Page |2
The department may charge a photocopying fee of ____ cents
per page to anyone who requests copies of construction or
remodeling plans except that a fee of $5 per plan sheet shall be
charged for reproduction of plan sheets larger than legal size -
ANSWERS-25
Which edition of the Life Safety Code shall facilities meet
applicable provisions? -ANSWERS-The 2000 edition
Where shall the disaster plan be available at? -ANSWERS-At
each nursing station
How often shall fire drills be held? -ANSWERS-At regular
intervals at least 4 times a year on each shift
How often shall the local fire inspection authorities make an
inspection of the facility? -ANSWERS-At least semiannually
All incidents of fire in a facility shall be reported to the department
within how many hours? -ANSWERS-72
, Page |3
What are the requirements of toilet room doors in period b and
period c facilities? -ANSWERS-Resident toilet room doors shall
be not less than 3 feet by 6'8" and shall not swing into the toilet
room unless they are provided with two-way hardware
What must emergency electrical service cover? -ANSWERS-
Lighting at nursing stations, telephone switchboards, exit and
corridor lights, boiler room, fire alarm systems, and medical
records when solely electronically based.
The emergency power system may be battery operated if it is
effective for how long? -ANSWERS-At least 4 hours
What type of water supply shall be maintained at all times? -
ANSWERS-A potable water supply
The temperature of hot water at plumbing fixtures used by
resident may not exceed the range of what temp? -ANSWERS-
110-115 degrees F
, Page |4
Which period facilities shall have night lighting? -ANSWERS-
Period C
In period C facilities, all rooms in which food is stored, prepared or
served, or in which utensils are washed shall be well-ventilated.
Do you refrigerated storage rooms need to be ventilated? -
ANSWERS-No
In period B facilities, at least on elevator shall be provided when
residents' beds are located on one more floors above or below
the dining or service floor. What shall the platform size of the
elevator be? -ANSWERS-Large enough to hold a resident bed
and attendant
In period B and C facilities, what type of outlet shall be provided
for every resident's bed? -ANSWERS-At least on duplex-type
outlet
No bedroom housing a resident shall open directly to? -
ANSWERS-A kitchen or laundry