100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CM 2113 FINAL EXAM QUESTIONS AND ANSWERS 2025

Rating
-
Sold
-
Pages
19
Grade
A+
Uploaded on
08-11-2025
Written in
2025/2026

CM 2113 FINAL EXAM QUESTIONS AND ANSWERS 2025

Institution
CM 2113
Course
CM 2113










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CM 2113
Course
CM 2113

Document information

Uploaded on
November 8, 2025
Number of pages
19
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CM 2113 FINAL EXAM LATEST
A contractor has decided to use a dragline to excavate a ditch to drain
stormwater runoff from her construction site. The material to be
excavated is a light moist clay weighing 2,000 pounds per bank cubic
yard with a swell of 18% and shrinkage of 25%. Given the density of the
material to be loaded, the contractor has determined that the largest
heavy-duty dragline bucket that can be safely mounted on the crane has
a rated capacity of 2.5 cubic yards. We assume that we know the average
depth of the dig is 11.9 feet and the average angle of the swing is 75
degrees, and the contractor plans to operate the machine about 48
minutes per hour. Please answer this question based on the following
given tables. - ANSWERS-305


A contractor has decided to use a dragline to excavate a ditch to drain
stormwater runoff from her construction site. The material to be
excavated is a light moist clay weighing 2,000 pounds per bank cubic
yard with a swell of 18% and shrinkage of 25%. Given the density of the
material to be loaded, the contractor has determined that the largest
heavy-duty dragline bucket that can be safely mounted on the crane has
a rated capacity of 2.5 cubic yards. We assume that we know the average
depth of the dig is 11.9 feet and the average angle of the swing is 75
degrees, and the contractor plans to operate the machine about 48
minutes per hour. What is the optimum depth of cut for this machine
based on the given scenario? - ANSWERS-8.5


A contractor has decided to use a dragline to excavate a ditch to drain
stormwater runoff from her construction site. The material to be
END OF
PAGE
1

,CM 2113 FINAL EXAM LATEST
excavated is a light moist clay weighing 2,000 pounds per bank cubic
yard with a swell of 18% and shrinkage of 25%. Given the density of the
material to be loaded, the contractor has determined that the largest
heavy-duty dragline bucket that can be safely mounted on the crane has
a rated capacity of 2.5 cubic yards. We assume that we know the average
depth of the dig is 11.9 feet and the average angle of the swing is 75
degrees, and the contractor plans to operate the machine about 48
minutes per hour. Please answer this question based on the following
given tables.What is the swing-depth factor for this machine based on
the given scenario? - ANSWERS-1.00


What is the job efficiency for this machine based on the given scenario?
- ANSWERS-0.8


What is the actual production rate for this machine based on the given
scenario? - ANSWERS-244


Using Fig. 17.13, select the minimum-length boom required to hoist a
load of 80,000 lb from a truck at ground level and place it on a platform
76 ft above the ground. The minimum allowable vertical distance from
the bottom of the load to the boom point of the crane is 42 ft. The
maximum horizontal distance from the center of rotation of the crane to
the hoist line of the crane when lifting the load is 40 ft. - ANSWERS-
120

END OF
PAGE
2

, CM 2113 FINAL EXAM LATEST

A 25-ton truck-mounted hydraulic crane is being used on a construction
site. The maximum horizontal distance from the center of rotation of the
crane to the hoist line of the crane when lifting a load of 9,000 lb will be
40 ft. Use Table 17.2 crane data to select the minimum length boom
required to safely hoist the load. - ANSWERS-64


Liftem High Construction Co. has determined that the heaviest lift on a
project they are estimating weighs 26,000 lb. The project's tower crane
will make this lift (see Table 17.3). From the proposed tower crane
location on the building site the required reach for this lift will be 90 ft.
The crane will be equipped with an L6 jib and a four-part hoist line. This
critical lift is of a piece of HVAC equipment and will require a 1,400-lb
spreader bar attached to a 300-lb set of slings. If assembled in the
proposed configuration, can the crane safely make the pick? -
ANSWERS-no


Dozer is good for applications of less than 300ft short haul, and scraper
is good for applications of up to 3,000ft medium haul. - ANSWERS-
True


An advantage of a crawler dozer as compared with a wheel-type dozer is
higher speed. - ANSWERS-False


END OF
PAGE
3

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Teacher101 Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
369
Member since
1 year
Number of followers
71
Documents
8696
Last sold
3 days ago

Quality is my middle name.....100% ...my policy is to create and nurture people of quality by continuous education and training.....i guaranteed good grades 100% Feel free to get in touch through inbox...anything regarding help or issue with the exams posted... Finally after purchase please leave a good rating if satisfied with my work.... All the best as we continue working to improve ourselves through education

4.6

263 reviews

5
217
4
14
3
23
2
3
1
6

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions