Nerc Test
60 minutes
According to Nerc
Standards, an emergency
interchange transaction
can be exempt from
tagging if it is less
than_________________
2 business days
A BA or LSE that requests
an EEA 3 must complete
and EEA 3 report and
submit it to the RC within
how many days
5%
During restoration efforts
load pick-ups should not
exceed_____________
percentage of
synchronized generation
capacity
load and generation
What are the two
components that a system
operator should be aware
of for controlling frequency
during a system
restoration if they are in
an islanded situation
Energy Emergency Alerts
What system was put in
place to provide RC's with
a mechanism to handle
energy deficiencies?
withing 60 minutes of the start of modification
If due to a reliability event,
an interchange transaction
must be modified, how
long does the Sink
Balancing Authority have
to modify the tag?
, Nerc Test
Frequency Fluctuations
What is an example of a
disturbance that has
caused you system to
become islanded?
Continuous decline in frequency
What is an instance is
which you use manual
load shedding?
Schedule emergency assistance, recall all non-firm
What actions should be exports, start all available generation
implemented during a
EEA 2
Transmission facility is overloaded, voltages are
What would be an rapidly decaying, and no other situations are available
appropriate situation for a
system operator to shed
load?
Without delay, within 30 minutes
If an RC issues you a
directive to implement
when should it be
implemented?
Each Operating Authority Simulated emergencies
should periodically
practice______________
__
Its RC and any other potentially affected
If a Transmission Operator Transmission Operators
has an anticipated
emergency condition, it
shall
inform________________
_
Annually
How often shall the
Transmission Operator
and BA review and update
each emergency
plan___________
60 minutes
According to Nerc
Standards, an emergency
interchange transaction
can be exempt from
tagging if it is less
than_________________
2 business days
A BA or LSE that requests
an EEA 3 must complete
and EEA 3 report and
submit it to the RC within
how many days
5%
During restoration efforts
load pick-ups should not
exceed_____________
percentage of
synchronized generation
capacity
load and generation
What are the two
components that a system
operator should be aware
of for controlling frequency
during a system
restoration if they are in
an islanded situation
Energy Emergency Alerts
What system was put in
place to provide RC's with
a mechanism to handle
energy deficiencies?
withing 60 minutes of the start of modification
If due to a reliability event,
an interchange transaction
must be modified, how
long does the Sink
Balancing Authority have
to modify the tag?
, Nerc Test
Frequency Fluctuations
What is an example of a
disturbance that has
caused you system to
become islanded?
Continuous decline in frequency
What is an instance is
which you use manual
load shedding?
Schedule emergency assistance, recall all non-firm
What actions should be exports, start all available generation
implemented during a
EEA 2
Transmission facility is overloaded, voltages are
What would be an rapidly decaying, and no other situations are available
appropriate situation for a
system operator to shed
load?
Without delay, within 30 minutes
If an RC issues you a
directive to implement
when should it be
implemented?
Each Operating Authority Simulated emergencies
should periodically
practice______________
__
Its RC and any other potentially affected
If a Transmission Operator Transmission Operators
has an anticipated
emergency condition, it
shall
inform________________
_
Annually
How often shall the
Transmission Operator
and BA review and update
each emergency
plan___________