VA DEQ ESC Inspector Exam Newest VA DEQ ESC Inspector Exam VA DEQ ESC Inspector Practice Exam With Complete Questions And Correct Version!

Institution
Module










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Study
Module

Document information

Uploaded on
November 7, 2025
Number of pages
29
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

VA DEQ ESC Inspector Exam
Study online at https://quizlet.com/_bfarc4

1. VESCP Virginia Erosion and Sediment Control Program

- Administered by counties/cities (must), towns (may)
- MUST BE APPROVED

2. Minimum Stan- Stabilization
dard 1
permanent or temporary soil stabilization shall be applied to denuded areas
within seven days after final grade is reached on any portion of the site; temporary
soil stabilization shall be applied within seven days to denuded areas that may
not be at final grade but will remain dormant for longer than 14 days; permanent
stabilization shall be applied to areas that are to be left dormant for more than
one year

3. Site NOT at Final - stabilize in 14 days
Grade - temporarily seed
- mulch
- permanently stabilize if dormant > 1 year

4. Site at Final - stabilize in 7 days (recommended immediately)
Grade - permanently or temporarily seed and mulch
- mulch/matting/straw

5. Minimum Stan- Stock Piles, Waste and Borrow Areas
dard 2
during construction, soil stock piles and borrow areas shall be stabilized or
protected with sediment trapping measures

mulch prevents erosion by protecting the surface from raindrop impact and silt
fence intercepts and detains from disturbed areas

6. Minimum Stan- Permanent Vegetation
dard 3
permanent vegetation cover shall be established on denuded areas not otherwise


, VA DEQ ESC Inspector Exam
Study online at https://quizlet.com/_bfarc4

permanently stabilized (permanent vegetation shall not be considered estab-
lished until a ground cover is achieved that is uniform, mature enough to survive,
and will inhibit erosion *there is no % associated with this*)

reduce erosion and decrease sediment yield from disturbed area

this is the standard used to verify that a site is ready for release of bonds or surety

7. Minimum Stan- First-Step Measures
dard 4
Sediment basins and traps, perimeter dikes, sediment barriers and other mea-
sures intended to trap sediment shall be constructed as a first step in any land-dis-
turbing activity and shall be made functional before upslope land disturbance
takes place

a certain amount of initial land disturbance may be required to provide access for
equipment to install the perimeter controls, but site clearing and grading should
be kept to a minimum until the perimeter controls are in place

intercepts and detains small amounts of sediment from disturbed areas during
construction operation to prevent sediment from leaving the site and decrease
velocity of sheet flows and low-to-moderate level channel flow

8. Perimeter Con- assures that sediment does not leave the perimeter of the land-disturbing area
trols once site clearing, grading, and construction commences

Examples: silt fences, sediment traps, sediment basins, construction entrance,
temporary diversions, diversions

9. Minimum Stan- Earthen Structure Stabilization
dard 5
stabilization measures shall be applied to earthen structures such as dams, dikes,
and diversions immediately after installation



, VA DEQ ESC Inspector Exam
Study online at https://quizlet.com/_bfarc4

reduce erosion and sedimentation and reduce damage from sediment and runoff
to downstream or off-site areas

10. Minimum Stan- Traps and Basins
dard 6
sediment traps and basins shall be designed and constructed based upon the
total drainage area (not just disturbed area) to be served by the trap or basin

11. Sediment Traps minimum storage capacity shall be 134 cubic yards per acre of drainage area and
shall only control drainage areas less than 3 acres

*stone outlet = trap*

12. Sediment Basins surface runoff from disturbed areas that is comprised of flow from drainage areas
greater than or equal to 3 acres shall be controlled by a basin; minimum storage
capacity of a sediment basin shall be 134 cubic yards per acre of drainage area;
the outfall system shall, at a minimum, maintain the structural integrity of the
basin during a 25-year storm of 24-hour duration; runoff coefficients used in
runoff calculations shall correspond to a bare earth condition or those conditions
expected to exist while the sediment basin is utilized.

13. Sediment Trap- 1. place near the lowest drainage points of a project
ping Devises
2. install as a first-step measure [MS-4]

3. stabilize immediately [MS-5]

4. must include outlet protection for basins [MS-11]

14. Minimum Stan- Cut and Fill Slopes
dard 7
roughening the surface of the slope decreases runoff, lowers the velocity runoff,
increases water retention, and leads to better seed germination

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
WRITEWISE CHAMBERLAIN COLLEGE OF NURSING
Follow You need to be logged in order to follow users or courses
Sold
41
Member since
1 year
Number of followers
5
Documents
1355
Last sold
1 week ago
WRITE WISE

WRITE WISE Tutoring: Expert Psychology, Nursing, HR & Math Resources Welcome to my academic support store, your trusted destination for top-tier homework help and tutoring services! Specializing in key subjects like Psychology, Nursing, Human Resource Management, and Mathematics, I’m dedicated to helping students excel with high-quality, meticulously crafted resources. My mission is to deliver scholarly, reliable content that guarantees excellent grades, earning me a reputation as one of Stuvia’s BEST GOLD RATED TUTORS. Whether you need assistance with quizzes, exams, or detailed study materials, I prioritize your success with a commitment to academic excellence and results you can count on.

Read more Read less
3.7

3 reviews

5
1
4
0
3
2
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions