1. Which of the following is a step of the Department of Defense (DoD) Risk
Management Process?: -Registration
-Sourcing
-*Mitigation*
-Tracking
2. Which of the following is a critical success factor to ensure effective risk
management (RM)?: -Researching best practices
-Assembling the most qualified personnel for the team
-Establishing priority risk categories
-*Program Risk Process (PRP) Document*
3. The following describes which type of category of risk: Certification for a
new weapons system is scheduled for January. To conduct a meaningful test,
temperatures must be below freezing. If the temperature is too warm, the test
cannot be conducted.: -Technical
-*Business*
-Programmatic
4. Which of the following are the components of opportunity management
(OM)?: -Probability, cost, future root cause
-Likelihood, level, consequence
-Level, priority, benefit
-*Future root cause, probability, benefit*
5. Within a program, which of the following entities is responsible for ensuring
the risk management (RM) process is executed according to the Program Risk
Process (PRP) Document?: -Risk Owner
-Risk Working Group
-*Risk Management Board (RMB)*
-Program Executive Officer (PEO)
6. During the Materiel Solution Analysis (MSA) phase, it is important to assess
risks to achieve exit criteria for which review?: -*Alternative System Review (ASR)*
-System Functional Review (SFR)
1/7
, PMT 0170 Risk Management ACTUAL EXAM 2025 TEST COMPREHENSIV
QUESTIONS AND VERIFIED ANSWERS (DETAILED & ELABORATED) 100%
SOLVED 2025!!
Study online at https://quizlet.com/_haw5r4
-Preliminary Design Review (PDR)
-System Requirements Review (SRR)
7. Monte Carlo simulations use computational algorithms to simulate the be-
havior of various systems in a nondeterministic manner. Why are these "non-
deterministic" results important to program schedule analysis?: -Because the results
show the average length of the tasks needed to complete the program for the PM to use when building the schedule
-Because the results show a clear path to project completion for the program manager (PM) to follow
-Because it means there is no way to tell which way is the correct way to run the program
-*Because there are one or more points in the simulation where a choice is made between different paths, without any
specific guidance on which one will be chosen*
8. Your program includes teams in six different locations. These teams need
access to different pieces of risk monitoring data in order to monitor, manage,
and report risk. Which of the following risk monitoring tools would be most
appropriate?: -Risk Management (RM) information systems
-Risk reporting matrix (WRONG ANSWER)
-Technical performance measurements (TPMs)
-Waterfall effect
9. Based on the results of a simulation, there is a 70% chance that the project
will end two weeks behind schedule. Using the table provided, what would the
cumulative schedule risk be, based on a two week schedule delay?
Level Probability of Occurrence Schedule Impact
1 0% to 19% 0 to 7 days
2 20% to 39% 8 to 14 days
3 40% to 59% 15 to 21 days
4 60% to 79% 22 to 28 days
5 80% to 100% 29 to 35 days: -Probability 4; Schedule Impact 4
-Probability 2; Schedule Impact 2
-Probability 2; Schedule Impact 4
-*Probability 4; Schedule Impact 2*