Professional CM (Agency CM) - ANS Which one of the following is not a Project Delivery
System?
In lump-sum contracts, the Owner assumes the risk of cost. - ANS False
Typically, the Design Reviewer has the ultimate responsibility and authority to make executive
decisions related to matters affecting time and money in a construction project. - ANS False
In the Design-Build project delivery system, the Owner has separate contracts with the Designer
and the Contractor. - ANS False
The Resident Project Representative should stop the work of the Contractor when the work is
not performed according to the drawings and specifications. - ANS False
Which of the following should not be performed by the Resident Project Representative for
inspections? - ANS Providing instructions directly to subcontractors
Which of the following is not true for the construction diary? - ANS Entries should be made
on a weekly basis (i.e., at the end of each week)
1 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED
, Ambiguous language in a contract is interpreted against the party who selected the language or
supplied the contract. - ANS True
According to Spearin Doctrine, when the contractor exactly follows the detail specifications and
drawings, she/he will not be responsible for unsatisfactory results in the end product. -
ANS True
Shop drawings can be used as change orders. - ANS False
Which one of the following is not an element of the Contract as we discussed in class? -
ANS (Promise)
Offer
Acceptance
Consideration
Which of the following is not a condition where a contract will not be enforced by courts? -
ANS Seniority
Fill in the blank in the following statement: Some contracts must be in writing under the
____________ as adopted by each state. - ANS Statute of Frauds
RFI (Request for Information) is the document that is transmitted to the General Contractor
from the Designer to get clarifications with respect to design drawings and specifications. -
ANS False
The resident project representative should not supervise, direct, or control the contractor's
means and methods of performing work. - ANS True
In fast-track projects with multiple contractors, the services of a professional construction
management firm (Agency CM) are essential. - ANS True
2 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED
VERIFIED ANSWERS. A+ GRADE
2025/2026.
Professional CM (Agency CM) - ANS Which one of the following is not a Project Delivery
System?
In lump-sum contracts, the Owner assumes the risk of cost. - ANS False
Typically, the Design Reviewer has the ultimate responsibility and authority to make executive
decisions related to matters affecting time and money in a construction project. - ANS False
In the Design-Build project delivery system, the Owner has separate contracts with the Designer
and the Contractor. - ANS False
The Resident Project Representative should stop the work of the Contractor when the work is
not performed according to the drawings and specifications. - ANS False
Which of the following should not be performed by the Resident Project Representative for
inspections? - ANS Providing instructions directly to subcontractors
Which of the following is not true for the construction diary? - ANS Entries should be made
on a weekly basis (i.e., at the end of each week)
1 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED
, Ambiguous language in a contract is interpreted against the party who selected the language or
supplied the contract. - ANS True
According to Spearin Doctrine, when the contractor exactly follows the detail specifications and
drawings, she/he will not be responsible for unsatisfactory results in the end product. -
ANS True
Shop drawings can be used as change orders. - ANS False
Which one of the following is not an element of the Contract as we discussed in class? -
ANS (Promise)
Offer
Acceptance
Consideration
Which of the following is not a condition where a contract will not be enforced by courts? -
ANS Seniority
Fill in the blank in the following statement: Some contracts must be in writing under the
____________ as adopted by each state. - ANS Statute of Frauds
RFI (Request for Information) is the document that is transmitted to the General Contractor
from the Designer to get clarifications with respect to design drawings and specifications. -
ANS False
The resident project representative should not supervise, direct, or control the contractor's
means and methods of performing work. - ANS True
In fast-track projects with multiple contractors, the services of a professional construction
management firm (Agency CM) are essential. - ANS True