Which of the following balancing control modes is used by PJM
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
under normal operations? - CORRECT ANSWERS ✔✔Tie-Line Bias
|\ |\ |\ |\ |\ |\ |\
Which of the following influences does PJM consider when
|\ |\ |\ |\ |\ |\ |\ |\ |\
performing their system load forecast? - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\ |\
✔✔Weather Conditions & Day of the Week |\ |\ |\ |\ |\ |\
All of the following are limits that must be submitted to PJM for
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
generating units EXCEPT: |\ |\
1. Eco Min|\ |\
2. Eco Max|\ |\
3. Emergency Max
|\ |\
4. Dynamic Instability - CORRECT ANSWERS ✔✔Dynamic
|\ |\ |\ |\ |\ |\ |\
Instability
If PJM experienced an event that caused the loss of a 1,000 MW
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
generator, which of the following would most likely provide the
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
quickest impact to improve the undegenerating Area Control Area
|\ |\ |\ |\ |\ |\ |\ |\
(ACE)?
|\
1. Remedial Action Reserve
|\ |\ |\
2. Synch Reserve
|\ |\
3. Non-Synch Reserve
|\ |\
,4. Secondary Reserve - CORRECT ANSWERS ✔✔Synch Reserve
|\ |\ |\ |\ |\ |\ |\
Your system has experienced an event that caused the frequency
|\ |\ |\ |\ |\ |\ |\ |\ |\
to drop below 60.00 Hz, what would be the most likely event
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
that occurred? - CORRECT ANSWERS ✔✔A generator on your
|\ |\ |\ |\ |\ |\ |\ |\ |\
system tripped offline |\ |\
How does the PJM dispatcher inform the Members of the PJM
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
regulation Requirements? - CORRECT ANSWERS ✔✔All-Call |\ |\ |\ |\ |\
In order for your generator to quality to supply regulation in the
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
PJM Regulation market, it must be able to respond and attain its
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
desired output within how many minutes? - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\ |\ |\
✔✔5 minutes |\
Based on a generator capability curve, in order to maximize the
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
MVAR output of the generator, it may be necessary to: -
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔decrease the MW output of the unit|\ |\ |\ |\ |\ |\ |\ |\
PJM maintains a regulation quality standard which states that a
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
generator may be certified to provide regulation only after it
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
achieves three consecutive regulation test scores of at least -
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔75% |\ |\
Which of the following would NOT be a cause for a sudden
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
deviation in the balancing area ACE? |\ |\ |\ |\ |\
1. incorrect interchange number
|\ |\ |\
,2. loss of a tie-line RTU
|\ |\ |\ |\ |\
3. loss of internal load
|\ |\ |\ |\
4. loss of adjacent control area generation - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
✔✔loss of adjacent control area generation
|\ |\ |\ |\ |\
The primary purpose for the balancing area to have Regulation is
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
to correct for: - CORRECT ANSWERS ✔✔small deviations in load
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
It is necessary for Generation Owner dispatchers to notify PJM of
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
unplanned unit outages: - CORRECT ANSWERS ✔✔as soon as |\ |\ |\ |\ |\ |\ |\ |\ |\
practicable
PJM should be made aware of any fuel shortage that a generator
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
may experience. |\ |\
This information assists in analyzing the resources and reliably
|\ |\ |\ |\ |\ |\ |\ |\ |\
operating the system. A heightened awareness is expected
|\ |\ |\ |\ |\ |\ |\ |\
during: - CORRECT ANSWERS ✔✔extreme hot or cold conditions
|\ |\ |\ |\ |\ |\ |\ |\
Generators are required to obtain PJM approval prior to removing
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
a generating unit from service.
|\ |\ |\ |\
The only exception is for: - CORRECT ANSWERS ✔✔injury to
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
personnel will be prevented |\ |\ |\
, Prior to removing a self-scheduled generator from service, the
|\ |\ |\ |\ |\ |\ |\ |\ |\
PJM member must first - CORRECT ANSWERS ✔✔give PJM the
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
option to takeover the unit for the market
|\ |\ |\ |\ |\ |\ |\
When PJM experiences problems with their primary digital control
|\ |\ |\ |\ |\ |\ |\ |\
signal, it sometimes becomes necessary for companies with the
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
capability, to switch to the back-up signal. |\ |\ |\ |\ |\ |\ |\
This backup signal is known as: - CORRECT ANSWERS ✔✔Analog
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
control
When PJM sends cost signals to generators, to provide direction
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
for increasing or decreasing the facility output, this signal that is
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
sent is known as: - CORRECT ANSWERS ✔✔Dispatch Rate
|\ |\ |\ |\ |\ |\ |\ |\
Under normal operating conditions, what is the limit that will
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
provide the lowest output level of a generating unit? - CORRECT
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔Eco Min |\ |\
When PJM send out a cost signal to generators to adjust their
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
output, the generating personnel adjust the output of the unit
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
base on the unit's - CORRECT ANSWERS ✔✔price or cost curve
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
incremental
Which eSuite tool is used to maintain individual generator
|\ |\ |\ |\ |\ |\ |\ |\ |\
regulation data that is submitted by PJM members? - CORRECT
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔eMarket |\