100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CMGT 360 Final Exam Questions And Answers

Rating
-
Sold
-
Pages
5
Grade
A+
Uploaded on
17-10-2025
Written in
2025/2026

Design-Build Entity Configurations - ANS -Contractor Led • A/E Led • Integrated Firm • Developer Led • Joint Venture The Controlling Entity is: - ANS whoever holds the Prime Contract RFP - ANS -Technical Proposal -drawings, written specifications, renderings, models -Price Proposal -Stipulated Sum proposed based on Technical Proposal Standard Form Design-Build Contracts - ANS -AIA • EJCDC • AGC • DBIA What is not addressed in AIA agreements? - ANS PRICING Level of design in RFP - ANS Determines who controls the details of the design Design Draw-Build - ANS • 35% Design or Greater • Typically Low Bid-Based Procurement Design-Builder is selected on the basis of price only Programming - ANS a written statement of requirements of the building used as the basis for design and the Owner's budget & Schedule 10-35% Schematic Design - ANS An investigation of different design alternatives that meets the programming statement 10-35% T/F Detailed estimating is a building systems approach to estimating - ANS FALSE T/F The Feasibility Estimate is the Cost Model and establishes the budget for the project - ANS FALSE T/F A key element of Quality Assurance is keeping the lines of communications open between the Owner and DB so that expectations are understood. - ANS True In the Design/Cost Relationship of Design-Build, the Constructor establishes design parameters for Architect - ANS False TRUST is the single most important distinction about Design-Build - ANS False, it is TEAM The design-build estimating sequence where 15% to 20% of the project design has been completed - ANS Schematic Estimate Which of the following best describes Trend Logs? - ANS Trend logs list all estimate related trends, monitors their status, and summarizes their evaluation. AND Trend Logs provide baseline budgets and schedules When is the design considered committed? - ANS The drawings and specifications are approved by the DOR as complying with RFP. AND The design component has been priced and confirmed within budget. What is not a typical design manager role? - ANS Coordinating Owner design reviews and approvals. Direct-Design Build - ANS Programming and design are developed by the DB entity T/F In Design-Bid-Build the owner warrant the sufficiency of the plans and specs to the Contractor - ANS False T/F "Integrated Services" is the single most important distinction about design-build. - ANS False

Show more Read less
Institution
CMGT
Course
CMGT









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CMGT
Course
CMGT

Document information

Uploaded on
October 17, 2025
Number of pages
5
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CMGT 360 Final Exam Questions And
Answers




A
R
U
LA
C
O
D

, Design-Build Entity Configurations - ANS -Contractor Led
• A/E Led
• Integrated Firm




A
• Developer Led
• Joint Venture




R
The Controlling Entity is: - ANS whoever holds the Prime Contract

RFP - ANS -Technical Proposal
-drawings, written specifications,



U
renderings, models
-Price Proposal
-Stipulated Sum proposed based on
LA
Technical Proposal

Standard Form Design-Build Contracts - ANS -AIA
• EJCDC
• AGC
• DBIA
C

What is not addressed in AIA agreements? - ANS PRICING

Level of design in RFP - ANS Determines who controls the details of the design
O


Design Draw-Build - ANS • 35% Design or Greater
• Typically Low Bid-Based Procurement
D



Design-Builder is selected on the
basis of price only

Programming - ANS a written statement of requirements of the building used as the basis
for design and the Owner's budget & Schedule

10-35%

Schematic Design - ANS An investigation of different design alternatives that
meets the programming statement

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
DocLaura Galen College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
144
Member since
2 year
Number of followers
38
Documents
6487
Last sold
22 hours ago

4.2

43 reviews

5
26
4
4
3
10
2
2
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions