Answers
A
R
U
LA
C
O
D
, Design-Build Entity Configurations - ANS -Contractor Led
• A/E Led
• Integrated Firm
A
• Developer Led
• Joint Venture
R
The Controlling Entity is: - ANS whoever holds the Prime Contract
RFP - ANS -Technical Proposal
-drawings, written specifications,
U
renderings, models
-Price Proposal
-Stipulated Sum proposed based on
LA
Technical Proposal
Standard Form Design-Build Contracts - ANS -AIA
• EJCDC
• AGC
• DBIA
C
What is not addressed in AIA agreements? - ANS PRICING
Level of design in RFP - ANS Determines who controls the details of the design
O
Design Draw-Build - ANS • 35% Design or Greater
• Typically Low Bid-Based Procurement
D
Design-Builder is selected on the
basis of price only
Programming - ANS a written statement of requirements of the building used as the basis
for design and the Owner's budget & Schedule
10-35%
Schematic Design - ANS An investigation of different design alternatives that
meets the programming statement