SWM Inspector Exam Preparation/VA DEQ SWM
Inspector Practice Exam With Complete Questions And
Correct Answers| Brand New Version!
Where are the two locations where the notice of coverage letter must be posted?
- ans -1) onsite near the main entrance, and 2) in the General information section
of the SWPPP
What five things must be included in the general information section of the
SWPPP? - ans -1) signed copy of registration statement
2) copy of the notice of coverage letter
3) copy of the construction GP
4) narrative description of the construction activity
5) Legible site plans
What is the inspection frequency for a site's qualified personnel in areas which
have temporary stabilization? - ans -Once a month
If a qualified personnel discovers an ESC practice is not functioning or improperly
installed, how long do they have to fix it? - ans -No longer than 7 days after
discovery.
The operator must note all modifications or updates in the SWPPP, including a
record of the following three dates: - ans -major grading, stabilization, and any
temporary or permanent ceasing of construction activity.
How quickly must an unauthorized discharge to surface water be reported to the
DEQ? - ans -Verbal notification within 24 hours, written notification within 5 days
If an area is not at final grade, but may remain dormant for more than 14 days,
how quickly must temporary stabilization be applied? - ans -Within 7 days
If a bare area is at final grade, when must permanent or temporary soil
stabilization be applied? - ans -Within 7 days
, Three requirements for concrete wash water: - ans -1) must be directed to a leak-
proof container or settling basin
2) container or basin cannot overflow
3) hardened or liquid concrete waste must be removed and properly disposed.
How long must a VSMP authority maintain inspection reports? - ans -For at least
three years after permit termination.
If an eventual stormwater BMP utilizes infiltration for pollution removal, would it
be a good co-located practice? - ans -No, a co-located practice involves an ESC
measure being converted into a SWM facility. An infiltration facility would clog if
used to settle sediment prior.
What criteria does vegetation need in order to be considered established?
- ans -the ground cover must be:
1) uniform
2) mature enough to survive
3) able to inhibit erosion
What legal agreement allows VSMP inspectors to access property for conducting
post-construction BMP inspections? - ans -A long-term maintenance agreement
Who must sign and seal a construction record drawing, and when must it be
submitted to the VSMP authority? - ans -must be signed by a professional
registered in VA. Must be submitted before permit termination.
How much time does the VSMP authority have to terminate any bonds or
securities provided by the operator? - ans -Within 60 days of completing the
requirements of the permit conditions
How often must a VSMP authority inspect a SWM facility post-construction? - ans
-Every 5 years, OR the owner may submit reports completed be a qualified person
on an annual basis