MICHIGAN RESIDENTIAL BUILDERS
LICENSE MAINTENANCE AND
ALTERATIONS EXAM 2 100% SOLVED
Between H$110,000 Hand H$120,000 H- Hcorrect Hanswers H-In Hthe Hprevious Hyear, Ha
Hcompany Hhad Hrevenues Hof H$500,000, Hproject Hoverhead Hof H$40,000 Hand
Hcompany Hoverhead Hof H$75,000. HThe Hcompany Hexpects Hthe Hpercentage Hfor
Hproject Hand Hcompany Hoverhead Hto Hremain Hthe Hsame Hfor Hthe Hcurrent Hyear.
HThe Hcompany Hdesires Hto Hmake Ha H10% Hprofit Hon Ha Hproject Hit His Hbidding.
HThe Hproject Hwould Hhave H$80,000 Hin Hdirect Hcosts. HWhat Hshould Hthe Hbid Hprice
Hbe?
Failing Hto Hdisclose Hone Hsubcontractor's Hbid Hto Hanother H- Hcorrect Hanswers H-
Which Hof Hthe Hfollowing His Hconsidered Hethical Hbehavior?
, in Hthe Hwindow Hschedule H- Hcorrect Hanswers H-Where Hwould Hthe Hmost Hspecific
Hinformation Habout Hthe Hsize Hand Hlocation Hof Hwindows Hbe Hfound Hin Ha Hset Hof
Hconstruction Hdrawings?
30 Hinches H- Hcorrect Hanswers H-What His Hthe Hmaximum Hdepth Hfor Ha HK-Series
Hopen Hweb Hsteel Hjoist?
4 Hfeet H- Hcorrect Hanswers H-What His Hthe Hminimum Hdepth Hof Ha Htrench
Hexcavation Hin Hwhich Ha Hladder His Hrequired Hto Hbe Hprovided?
conducting Htest Hborings H- Hcorrect Hanswers H-Before Hexcavating Hfor Ha Hnew
Hbuilding, Hhow Hshould Hsubsoil Hconditions Hbe Hdetermined?
6 Hfeet H- Hcorrect Hanswers H-For Hroofing Hwork, Hwhat His Hthe Hminimum Hdistance
Hthat Hmaterials Hand Hequipment Hcan Hbe Hstored Hfrom Ha Hroof Hedge Hwithout Ha
Hguardrail Hbeing Hrequired
K-Series H- Hcorrect Hanswers H-Which Hdesignation His Hused Hby Hthe HSteel HJoist
HInstitute's HStandard HSpecification Hto Hdesignate Hshort Hspan Hsteel Hbar Hjoists?
Damage Hto Hadjoining Hproperty Hfrom Ha Hcrane Haccident. H- Hcorrect Hanswers H-
Which Hof Hthe Hfollowing Hwould Htypically Hbe Hcovered Hby Ha Hcontractor's
Hcomprehensive Hgeneral Hliability Hinsurance Hpolicy?
6 HBCY H- Hcorrect Hanswers H-What His Hthe Happroximate Hoptimum Hhourly
Hproduction Hrate Hfor Ha Hwheeled Hbackhoe Hfilling Hhauling Hunits? HStruck Hcapacity
Hfor Hthe Hbucket His H6 Hloose Hcubic Hfeet Hand Hthe Hbucket Hfill Hfactor His H110%.
HThe Hcycle Htime His H2 Hminutes, Hthe Hsoil Htype His Hmoist Hloam Hwith Ha H25%
Hswell Hfactor.
2 H2/3 Hsquare Hfeet H- Hcorrect Hanswers H-What His Hthe Hminimum Hrequirement Hfor
Hthe Hplacement Hof Heach Htie Hin Ha Hblock Hwall Hused Hwith Hwood Hframing?
3.0 Hinches H- Hcorrect Hanswers H-In Hgeneral, Hwhat His Hthe HMINIMUM Hconcrete
Hcovering Hfor Hsteel Hreinforcement Hin Ha Hfooting?
45 Hdegrees H- Hcorrect Hanswers H-What His Hthe Hmaximum Hallowable Hslope Hfor Han
Hexcavation Hin HType HB Hsoil?
$693.75 H- Hcorrect Hanswers H-An Hemployee Hearns H$12.50 Hper Hhour. HWhat His
Hthe Hgross Hpay Hof Hthis Hnon-exempt Hemployee Hwho Hworks H45 Hhours Hduring Ha
Hholiday Hweek, Hand Hreceives H8 Hhours Hadditional Hpay Hfor Hthe Hholiday?
1 H1/2 Hinches H- Hcorrect Hanswers H-How Hmany Hinches Hshould Hthere Hbe Hbetween
Ha Hhandrail Hand Han Hadjacent Hwall?
LICENSE MAINTENANCE AND
ALTERATIONS EXAM 2 100% SOLVED
Between H$110,000 Hand H$120,000 H- Hcorrect Hanswers H-In Hthe Hprevious Hyear, Ha
Hcompany Hhad Hrevenues Hof H$500,000, Hproject Hoverhead Hof H$40,000 Hand
Hcompany Hoverhead Hof H$75,000. HThe Hcompany Hexpects Hthe Hpercentage Hfor
Hproject Hand Hcompany Hoverhead Hto Hremain Hthe Hsame Hfor Hthe Hcurrent Hyear.
HThe Hcompany Hdesires Hto Hmake Ha H10% Hprofit Hon Ha Hproject Hit His Hbidding.
HThe Hproject Hwould Hhave H$80,000 Hin Hdirect Hcosts. HWhat Hshould Hthe Hbid Hprice
Hbe?
Failing Hto Hdisclose Hone Hsubcontractor's Hbid Hto Hanother H- Hcorrect Hanswers H-
Which Hof Hthe Hfollowing His Hconsidered Hethical Hbehavior?
, in Hthe Hwindow Hschedule H- Hcorrect Hanswers H-Where Hwould Hthe Hmost Hspecific
Hinformation Habout Hthe Hsize Hand Hlocation Hof Hwindows Hbe Hfound Hin Ha Hset Hof
Hconstruction Hdrawings?
30 Hinches H- Hcorrect Hanswers H-What His Hthe Hmaximum Hdepth Hfor Ha HK-Series
Hopen Hweb Hsteel Hjoist?
4 Hfeet H- Hcorrect Hanswers H-What His Hthe Hminimum Hdepth Hof Ha Htrench
Hexcavation Hin Hwhich Ha Hladder His Hrequired Hto Hbe Hprovided?
conducting Htest Hborings H- Hcorrect Hanswers H-Before Hexcavating Hfor Ha Hnew
Hbuilding, Hhow Hshould Hsubsoil Hconditions Hbe Hdetermined?
6 Hfeet H- Hcorrect Hanswers H-For Hroofing Hwork, Hwhat His Hthe Hminimum Hdistance
Hthat Hmaterials Hand Hequipment Hcan Hbe Hstored Hfrom Ha Hroof Hedge Hwithout Ha
Hguardrail Hbeing Hrequired
K-Series H- Hcorrect Hanswers H-Which Hdesignation His Hused Hby Hthe HSteel HJoist
HInstitute's HStandard HSpecification Hto Hdesignate Hshort Hspan Hsteel Hbar Hjoists?
Damage Hto Hadjoining Hproperty Hfrom Ha Hcrane Haccident. H- Hcorrect Hanswers H-
Which Hof Hthe Hfollowing Hwould Htypically Hbe Hcovered Hby Ha Hcontractor's
Hcomprehensive Hgeneral Hliability Hinsurance Hpolicy?
6 HBCY H- Hcorrect Hanswers H-What His Hthe Happroximate Hoptimum Hhourly
Hproduction Hrate Hfor Ha Hwheeled Hbackhoe Hfilling Hhauling Hunits? HStruck Hcapacity
Hfor Hthe Hbucket His H6 Hloose Hcubic Hfeet Hand Hthe Hbucket Hfill Hfactor His H110%.
HThe Hcycle Htime His H2 Hminutes, Hthe Hsoil Htype His Hmoist Hloam Hwith Ha H25%
Hswell Hfactor.
2 H2/3 Hsquare Hfeet H- Hcorrect Hanswers H-What His Hthe Hminimum Hrequirement Hfor
Hthe Hplacement Hof Heach Htie Hin Ha Hblock Hwall Hused Hwith Hwood Hframing?
3.0 Hinches H- Hcorrect Hanswers H-In Hgeneral, Hwhat His Hthe HMINIMUM Hconcrete
Hcovering Hfor Hsteel Hreinforcement Hin Ha Hfooting?
45 Hdegrees H- Hcorrect Hanswers H-What His Hthe Hmaximum Hallowable Hslope Hfor Han
Hexcavation Hin HType HB Hsoil?
$693.75 H- Hcorrect Hanswers H-An Hemployee Hearns H$12.50 Hper Hhour. HWhat His
Hthe Hgross Hpay Hof Hthis Hnon-exempt Hemployee Hwho Hworks H45 Hhours Hduring Ha
Hholiday Hweek, Hand Hreceives H8 Hhours Hadditional Hpay Hfor Hthe Hholiday?
1 H1/2 Hinches H- Hcorrect Hanswers H-How Hmany Hinches Hshould Hthere Hbe Hbetween
Ha Hhandrail Hand Han Hadjacent Hwall?