(POPM) SAFe Agile Questions and
Answers | Latest Version | 2025/2026 |
Correct & Verified
What is the primary responsibility of a Product Owner in SAFe?
✔✔ Maximizing the value of the product by managing the product backlog
What does the Product Manager focus on in SAFe?
✔✔ Defining and communicating the vision, roadmap, and features for the product
What is a key difference between a Product Owner and a Product Manager in SAFe?
✔✔ The Product Owner works at the team level while the Product Manager works at the
program level
What is a PI (Program Increment) in SAFe?
✔✔ A timebox during which an Agile Release Train delivers incremental value
What is the purpose of the Program Backlog in SAFe?
1
,✔✔ To capture upcoming features, enablers, and initiatives for the ART
What is the main goal of a PI Planning event?
✔✔ Align teams to a shared mission and plan the upcoming Program Increment
What is an Agile Release Train (ART)?
✔✔ A long-lived team of Agile teams that delivers value incrementally
What is the difference between a feature and a story in SAFe?
✔✔ Features represent program-level functionality while stories represent team-level work
How often does PI Planning typically occur?
✔✔ Every 8–12 weeks
What is a Lean Portfolio in SAFe?
✔✔ A framework to align strategy and execution while funding value streams
What is a key responsibility of the Product Manager during PI Planning?
2
,✔✔ Prioritizing features and communicating the vision to the teams
What is WSJF in SAFe?
✔✔ Weighted Shortest Job First, a prioritization method to maximize economic value
What does a Product Owner do during iteration planning?
✔✔ Refines and prioritizes stories for the team backlog and clarifies requirements
What is an Enabler in SAFe?
✔✔ Work that supports the architecture, infrastructure, or compliance needed to deliver features
What is a Solution Intent in SAFe?
✔✔ The repository of knowledge about the current and intended behavior of a solution
How does the Product Manager ensure alignment with business strategy?
✔✔ By continuously communicating with stakeholders and adjusting the roadmap
What is the role of a System Demo in SAFe?
3
, ✔✔ To show the integrated work of all teams in the ART and gather feedback
What is the difference between a capability and a feature in SAFe?
✔✔ Capabilities are higher-level solution behaviors while features are deliverable program-level
functionality
What is a Lean-Agile Mindset in SAFe?
✔✔ Emphasizing customer focus, transparency, collaboration, and continuous improvement
What is the purpose of a backlog refinement session?
✔✔ To clarify, estimate, and prioritize backlog items for upcoming iterations
How does a Product Owner handle changing requirements mid-iteration?
✔✔ Collaborates with the team to adjust scope while maintaining value delivery
What is a feature’s acceptance criteria in SAFe?
✔✔ Specific conditions that must be met for the feature to be considered complete