A hard hat is required on a job site when _____? OSHA - Answer There is a danger from falling objects Any condition occurring in a communications or transmission channel that interferes with the proper transmission or interpretation or both of status change signals at the supervising station is known as _____? NFPA 72-3.3.9 - Answer Adverse condition A 4"x 4" box has multiple FPL cables pulled through it. A minimum of _____ inches of cable should be available for splicing? NFPA 70-300.14 - Answer 6 Wiring installed underneath a corrugated metal roof shall maintain a minimum separation of _____ inches? NFPA 70-300.4(E ) - Answer 1.5

Show more Read less
Institution
NICET LEVEL 1 IN HIGHWAY CONSTRUCTION
Course
NICET LEVEL 1 IN HIGHWAY CONSTRUCTION









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NICET LEVEL 1 IN HIGHWAY CONSTRUCTION
Course
NICET LEVEL 1 IN HIGHWAY CONSTRUCTION

Document information

Uploaded on
September 18, 2025
Number of pages
9
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

NICET 1 Practice Exam Questions and
Already Correct Answers 2025-2026
Set.
A hard hat is required on a job site when _____?

OSHA - Answer There is a danger from falling objects



Any condition occurring in a communications or transmission channel that interferes with the
proper transmission or interpretation or both of status change signals at the supervising station
is known as _____?

NFPA 72-3.3.9 - Answer Adverse condition



A 4"x 4" box has multiple FPL cables pulled through it. A minimum of _____ inches of cable
should be available for splicing?

NFPA 70-300.14 - Answer 6



Wiring installed underneath a corrugated metal roof shall maintain a minimum separation of
_____ inches?

NFPA 70-300.4(E ) - Answer 1.5



According to NFPA 72, the system account number is located in section _____ of the record of
completion?

NFPA 72-Figure 7.8.2(a) - Answer 2



Consider a circuit with a resistance of 6 ohms and a current of 2 amperes. What is the voltage? -
Answer 12 volts



All means of interconnecting equipment, devices, and appliances, and wiring connections shall
be monitored for the integrity of the interconnecting conductors or equivalent so that the
occurrence of a single open or a single ground fault condition in the installation conductors or
other signaling channels is automatically indicated within _____ seconds?

NFPA 72-12.6.1 - Answer 200



Pathway survivability level _____ shall consist of pathways and buildings that are fully protected

, What is the minimum conductor size for Power Limited Fire Alarm cable which is single
conductor?

NFPA 70-760.179(B) - Answer 18 AWG



According to NFPA 72, the maximum flash rate for a visible notification appliance shall not
exceed _____ flashes per second?

NFPA 72-18.5.3.1 - Answer 2



Consider the installation of rigid metal conduit. Where conduit is threaded in the field, a
standard cutting die with a 1 in _____ taper shall be used?

NFPA 70-344-.28 - Answer 16



According to NFPA 72, section _____ of the record of completion is used to note the input
voltage?

NFPA 72-Figure 7.8.2(a) - Answer 5.1.1



In order to determine the requirements for return side HVAC duct detectors _____ should be
consulted?

NFPA 72-17.7.6.3.1 - Answer NFPA 90A



For smooth ceilings, all points on the ceiling shall have a detector within a distance equal to
_____ the selected spacing?

NFPA 72-17.6.3.1.1(2) - Answer 0.7 times



Identify a specific listing process that applies only to two wire devices, such as smoke detectors,
that are designed to operate with certain control equipment.

NFPA 72-10.3.3 - Answer Compatibility



Which of the following is an acceptable method for performing a smoke entry test of the spot
type smoke detector?

NFPA 72-Table 14.4.3.2 (17) (7) - Answer Listed and labeled smoke product acceptable to the
manufacturer



Consider ¾" flexible conduit where flexibility is required after installation. The length from the

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TestSolver9 Webster University
View profile
Follow You need to be logged in order to follow users or courses
Sold
716
Member since
2 year
Number of followers
124
Documents
23916
Last sold
11 hours ago
TESTSOLVER9 STORE

TOPNOTCH IN LEARNING MATERIALS,(EXAMS,STUDYGUIDES NOTES ,REVIEWS,FLASHCARDS ,ALL SOLVED AND PACKAGED.OUR STORE MAKE YOUR EDUCATION JOURNEY EFFICIENT AND EASY.WE ARE HERE FOR YOU FEEL FREE TO REACH US OUT .

3.6

125 reviews

5
56
4
18
3
21
2
9
1
21

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions