S-12 CITYWIDE SPRINKLER SYSTEMS, S12 SPRINKLER TEST EXAM (ACTUAL 2025/2026) QUESTIONS WITH VERIFIED CORRECT ANSWERS (GRADED A+)
S-12 CITYWIDE SPRINKLER SYSTEMS, S12 SPRINKLER TEST EXAM (ACTUAL 2025/2026) QUESTIONS WITH VERIFIED CORRECT ANSWERS (GRADED A+) THE __________ IS RESPONSIBLE TO MAINTAIN SPRINKLER SYS. AND TO DETERMINE QUALIFICATIONS. OWNER RECORDS OF ALL INSPECTIONS AND MX SHALL BE MAINTAINED ON PREMISES FOR A MIN. OF __________ YEARS. 3 THE BUILDING OWNER SHALL ASSIGN A(N) ____________ TO COMPLY WITH REQUIREMENTS. IMPAIRMENT COORDINATOR REGULAR MX AND MINOR REPAIRS NOT AFFECTING MORE THAN ________ FLOOR(S) ARE CONSIDERED PLANNED REMOVAL FROM SERVICE. 1 SHUTDOWNS AFFECTING MORE THAN _________ FLOOR(S) ARE CONSIDERED UNPLANNED OUT OF SERVICE CONDITIONS. 1
Geschreven voor
- Instelling
- S-12 CITYWIDE SPRINKLER SYSTEMS, S12 SPRINKLER
- Vak
- S-12 CITYWIDE SPRINKLER SYSTEMS, S12 SPRINKLER
Documentinformatie
- Geüpload op
- 26 augustus 2025
- Aantal pagina's
- 17
- Geschreven in
- 2025/2026
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
s 12 citywide sprinkler systems s12 sprinkler tes