IMSA Traffic Signal Technician 2
Exam Actual Exam 2025 |
Complete Questions and Correct
Answers (Verified Answers) | Just
Released
Save
Terms in this set (104)
,In a TS2 cabinet, 1
how many times
can the MMU
experience a
"Port 1 Fail" in a
24 hour period
before
the fault is
latched?
On a 2070 MMU Remove diode on program card for
monitor unit, allowable phases
how does the
field tech
program
allowable
phases?
On an MMU, is it Yes, it by-passes the conflict
possible to tape feature and will not flash
the reset button
to prevent the
traffic signal
from going into
flash?
,On a NEMA Install copper jumpers and
CMU program soldering them on the program
card, how does card
the signal tech
program
allowable
phases?
According to Annually
best
maintenance
practices, how
often should
CMU/MMU be
tested?
The MMU The load switch/switch pack
indicates a RED- produces no outputs.
FAIL fault on
phase 6. Why?
, The purpose of Controller health
the controller
CVM
(Controller
Voltage
Monitor) output
is to allow the
CMU/MMU to
monitor the
When a Replace the CMU/MMU with a
Technician is newly tested unit
recertifying the
CMU/MMU at
an intersection,
what should the
technician do to
have the
intersection exit
flash?
Exam Actual Exam 2025 |
Complete Questions and Correct
Answers (Verified Answers) | Just
Released
Save
Terms in this set (104)
,In a TS2 cabinet, 1
how many times
can the MMU
experience a
"Port 1 Fail" in a
24 hour period
before
the fault is
latched?
On a 2070 MMU Remove diode on program card for
monitor unit, allowable phases
how does the
field tech
program
allowable
phases?
On an MMU, is it Yes, it by-passes the conflict
possible to tape feature and will not flash
the reset button
to prevent the
traffic signal
from going into
flash?
,On a NEMA Install copper jumpers and
CMU program soldering them on the program
card, how does card
the signal tech
program
allowable
phases?
According to Annually
best
maintenance
practices, how
often should
CMU/MMU be
tested?
The MMU The load switch/switch pack
indicates a RED- produces no outputs.
FAIL fault on
phase 6. Why?
, The purpose of Controller health
the controller
CVM
(Controller
Voltage
Monitor) output
is to allow the
CMU/MMU to
monitor the
When a Replace the CMU/MMU with a
Technician is newly tested unit
recertifying the
CMU/MMU at
an intersection,
what should the
technician do to
have the
intersection exit
flash?