PJM Generation Dispatcher Verified Multiple Choice and Conceptual Actual Emended Exam Questions With Reviewed 100% Correct Detailed Answers Guaranteed Pass!!Current Update!! 1. What is the primary function of an exciter on a generator? A) Adjust generator frequency B) Control generator voltage output C) Synchronize generator to the grid D) Maintain power factor Answer: B) Control generator voltage output 2. ECO Min, ECO Max, and EMERG Max represent: A) Transmission line ratings B) Generator operating limits C) Reserve requirements D) Voltage stability margins Answer: B) Generator operating limits 3. Before synchronizing a generator to the interconnection, which parameters must be matched? A) Frequency only B) Voltage and MW output C) Frequency, Voltage, and Phase Angle D) Voltage only Answer: C) Frequency, Voltage, and Phase Angle 4. When is the PJM GMD procedure implemented? A) When frequency drops below 59.95 Hz B) When geomagnetic activity exceeds 10A and is verified by transformer/voltage indicators C) When PJM declares Conservative Operations for fuel emergencies D) When synchrophasor oscillations are detected Answer: B) When geomagnetic activity exceeds 10A and is verified by transformer/voltage indicators 5. What is PJM’s primary focus during a terrorism or sabotage event? A) Restoring customer load quickly B) Maintaining operations and communications C) Isolating all critical substations immediately D) Disconnecting non-critical units Answer: B) Maintaining operations and communications

Mostrar más Leer menos
Institución
PJM Generation
Grado
PJM Generation









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
PJM Generation
Grado
PJM Generation

Información del documento

Subido en
18 de agosto de 2025
Número de páginas
11
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

PJM Generation Dispatcher Verified Multiple Choice
and Conceptual Actual Emended Exam Questions
With Reviewed 100% Correct Detailed Answers

Guaranteed Pass!!Current Update!!


1. What is the primary function of an exciter on a generator?
A) Adjust generator frequency
B) Control generator voltage output
C) Synchronize generator to the grid
D) Maintain power factor
Answer: B) Control generator voltage output



2. ECO Min, ECO Max, and EMERG Max represent:
A) Transmission line ratings
B) Generator operating limits
C) Reserve requirements
D) Voltage stability margins
Answer: B) Generator operating limits

3. Before synchronizing a generator to the interconnection, which parameters must be
matched?
A) Frequency only
B) Voltage and MW output
C) Frequency, Voltage, and Phase Angle
D) Voltage only
Answer: C) Frequency, Voltage, and Phase Angle

4. When is the PJM GMD procedure implemented?
A) When frequency drops below 59.95 Hz
B) When geomagnetic activity exceeds 10A and is verified by transformer/voltage
indicators
C) When PJM declares Conservative Operations for fuel emergencies
D) When synchrophasor oscillations are detected

, Answer: B) When geomagnetic activity exceeds 10A and is verified by
transformer/voltage indicators

5. What is PJM’s primary focus during a terrorism or sabotage event?
A) Restoring customer load quickly
B) Maintaining operations and communications
C) Isolating all critical substations immediately
D) Disconnecting non-critical units
Answer: B) Maintaining operations and communications

6. When does PJM issue a Reactive Reserve Check?
A) During low voltage alerts
B) When governor droop is lost
C) When frequency exceeds 60.2 Hz
D) When phase angle is unstable between islands
Answer: A) During low voltage alerts

7. How many hours prior to implementation does PJM issue a Heavy Load Voltage
Warning?
A) 1 hour
B) 2 hours
C) 4 hours
D) 6 hours
Answer: C) 4 hours

8. What should generators do during a PJM High System Voltage Action?
A) Trip offline to prevent overvoltage
B) Operate at the lower bandwidth of the voltage schedule
C) Increase governor droop
D) Disable AVR to allow manual control
Answer: B) Operate at the lower bandwidth of the voltage schedule

9. How long does an entity have to file a 24-hour reportable NERC disturbance with PJM?
A) Immediately
B) Within 2 hours
C) Within 6 hours
$11.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
EWLindy Chamberlain College Of Nursing
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
696
Miembro desde
3 año
Número de seguidores
431
Documentos
7278
Última venta
3 días hace
EN.CY.CLO.PE.DI.A

Hello, I am Passionate about education with over 7yrs teaching.. Welcome to my page...my documents are 100% guaranteed to help you Ace in your career path, Combining a wide view of career courses education Journey Proffesionaly. Will be very helpful for those students who want to make a change in nursing field and other close courses . Please go through the sets description appropriately before any purchase. The *Sets have been used years in years out by serious students to exercise, revise and even pass through their examinations. All revisions done by Expert Minds. This Gives You No Excuse To Leave A Bad Review. Thankyou . SUCCESS IN YOUR EDUCATION JOURNEY !! GOODLUCK IN YOUR STUDIES.

Lee mas Leer menos
3.8

103 reseñas

5
53
4
12
3
15
2
6
1
17

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes