100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

PJM Generation Dispatcher Verified Multiple Choice and Conceptual Actual Emended Exam Questions With Reviewed 100% Correct Detailed Answers Guaranteed Pass!!Current Update!!

Puntuación
-
Vendido
-
Páginas
37
Grado
A+
Subido en
18-08-2025
Escrito en
2025/2026

PJM Generation Dispatcher Verified Multiple Choice and Conceptual Actual Emended Exam Questions With Reviewed 100% Correct Detailed Answers Guaranteed Pass!!Current Update!! 1. A capacity resource that intends to be eligible to set real - time LMP must : A. be modeled in the PJM EMS B. have a minimum capacity of 30 MW C. be fully staffed during all summer hours D. be committed on their cost schedule . - ANSWER EMS A. be modeled in the PJM 2. Which of the following PJM systems are used to report unit outages ? A. eDART , eMKT , and eGADS B. eMTR , eSchedules , and eMKT C. eDART , eCapacity , and eGADS D. eDART , eMKT , and eCapacity - ANSWER A. eDART , eMKT , and eGADS 3. Which of the following units is subject to offer capping ? A. a unit performing capacity verification test B. a unit running for transmission congestion C. a unit dispatched to provide spinning reserve D. a unit running to control Eastern Transfer Limits - ANSWER for transmission congestion 4. eDART is used for all of the following EXCEPT A. generation outage scheduling B. instantaneous reserve checks C. LMP information B. a unit running D. generator reactive capability changes - ANSWER C. LMP information

Mostrar más Leer menos
Institución
PJM Generation
Grado
PJM Generation











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
PJM Generation
Grado
PJM Generation

Información del documento

Subido en
18 de agosto de 2025
Número de páginas
37
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Vista previa del contenido

PJM Generation Dispatcher Verified Multiple Choice
and Conceptual Actual Emended Exam Questions
With Reviewed 100% Correct Detailed Answers

Guaranteed Pass!!Current Update!!


1. A capacity resource that intends to be eligible to set real - time LMP must :
A. be modeled in the PJM EMS
B. have a minimum capacity of 30 MW
C. be fully staffed during all summer hours
D. be committed on their cost schedule . - ANSWER A. be modeled in the PJM
EMS



2. Which of the following PJM systems are used to report unit outages ?
A. eDART , eMKT , and eGADS
B. eMTR , eSchedules , and eMKT
C. eDART , eCapacity , and eGADS
D. eDART , eMKT , and eCapacity - ANSWER A. eDART , eMKT , and eGADS



3. Which of the following units is subject to offer capping ?
A. a unit performing capacity verification test
B. a unit running for transmission congestion
C. a unit dispatched to provide spinning reserve
D. a unit running to control Eastern Transfer Limits - ANSWER B. a unit running
for transmission congestion



4. eDART is used for all of the following EXCEPT



A. generation outage scheduling
B. instantaneous reserve checks
C. LMP information

, D. generator reactive capability changes - ANSWER C. LMP information



5. Which of the following generating units would be eligible to set LMP ?
A. A fixed - gen self - scheduled steam unit
B. A unit dispatched for constraint control
C. A unit that is on for testing only
D. A hydro unit in condensing mode - ANSWER B. A unit dispatched for
constraint control



6. A tie line with MW flowing into the PJM control area trips . The system operator will see
which the following occur ?
A. ACE will decrease , frequency will decrease
B. ACE will increase , frequency will increase
C. ACE will decrease , frequency will remain the same
D. ACE and frequency will remain the same - ANSWER D. ACE and frequency will
remain the same



7. A Minimum Generation Emergency Alert is initiated when
A. PJM projected LMP is at $ 10 / MW
B. expected generation is within 2500 MW of normal minimum energy limits
C. expected generation is within 2500 MW of emergency minimum levels
D. expected generation within 1000 MW of normal minimum energy limits . -
ANSWER B. expected generation is within 2500 MW of normal minimum
energy limits



8. The primary purpose of a Maximum Generation Emergency Alert is to management to
be on site
A. allow member companies to inform
B. inform companies that PJM is within 1000
C. provide an early alert that system conditions may require PJM emergency
procedures MW of normal minimum generation
D. Inform neighboring utilities that PJM emergency procedures - ANSWER C.
provide an early alert that system conditions may require PJM emergency
procedures MW of normal minimum generation

,9. A combustion turbine has 26 burn hours at maximum capacity . How should this be
offered into the Energy Market ?
A. maximum emergency
B. minimum emergency
C. black start
D. normally - ANSWER D. normally



10. Emergency reducible generation is defined as the difference between
A. normal minimum and normal maximum generation
B. maximum emergency generation and minimum emergency generation
C. normal minimum generation and emergency minimum generation
D. emergency minimum generation and normal maximum generation - ANSWER
C. normal minimum generation and emergency minimum generation



11. Operating reserve must equal the sum of
A. synchronized , Non - synchronized , and secondary
B. non - synchronized , secondary , and over thirty
C. synchronized , over thirty , and non - synchronized
D. secondary , over thirty , and synchronized - ANSWER C. synchronized , over
thirty , and non - synchronized



12. Where can a generator see its actual hourly performance score in Markets Gateway ?
A. Unit Details
B. Market Results-Results
C. Dispatch Lambda
D. Market Results-Regulation and Reserve Award - ANSWER D. Market Results-
Regulation and Reserve Award



13. Real time transmission constraints may be alleviated with generators operating -
ANSWER Off Cost (out of merit)

, 14. What is the minimum size for a solar park to be required to have a real and reactive
power telemetry? - ANSWER 3MW



15. PJM calls for which of the following to recover ACE so that tie line schedules are
maintained? - ANSWER Synchronized Reserves



16. The minimum generation alert expires when? - ANSWER It's cancelled by PJM



17. When PJM declares a hot weather alert, the generation dispatcher should. - ANSWER
Determine if maintenance can be deferred



18. During system restoration, the two categories of reserves are - ANSWER Dynamic
and Synchronous



19. During system restoration, frequency should be maintained between - ANSWER
59.75 and 61.00Hz



20. PJM issues a heavy load voltage schedule. Member companies who own generation
should: - ANSWER Ensure voltage regulators on generating units are in service on
automatic



21. A unit being dispatched economically be PJM should set its MW output based on the -
ANSWER Unit's dispatch rate or desired MW level



22. What hourly revenue data is required if a generator by PJM? - ANSWER
Compensated MWh delivered by each unit
$11.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
EWLindy Chamberlain College Of Nursing
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
696
Miembro desde
3 año
Número de seguidores
431
Documentos
7278
Última venta
3 días hace
EN.CY.CLO.PE.DI.A

Hello, I am Passionate about education with over 7yrs teaching.. Welcome to my page...my documents are 100% guaranteed to help you Ace in your career path, Combining a wide view of career courses education Journey Proffesionaly. Will be very helpful for those students who want to make a change in nursing field and other close courses . Please go through the sets description appropriately before any purchase. The *Sets have been used years in years out by serious students to exercise, revise and even pass through their examinations. All revisions done by Expert Minds. This Gives You No Excuse To Leave A Bad Review. Thankyou . SUCCESS IN YOUR EDUCATION JOURNEY !! GOODLUCK IN YOUR STUDIES.

Lee mas Leer menos
3.8

103 reseñas

5
53
4
12
3
15
2
6
1
17

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes