1. Which of the following are key organizational data relevant to the production process?
A. Company Code ✅
B. Credit Control Area
C. Client ✅
D. Storage Location ✅
E. Plant ✅
Rationale: Client, Company Code, Plant and Storage Location are standard organizational levels
used in production and inventory processes.
2. The master data relevant to the production process are:
A. Work Centers ✅
B. Material Masters ✅
C. Bill of Materials (BOM) ✅
D. Client
E. Company Code
Rationale: Work centers, material masters and BOMs define how products are manufactured.
3. Which of the following are statuses that can apply to a BOM?
A. On
B. Off
C. Active ✅
D. Inactive ✅
E. Open
Rationale: BOMs are typically marked active/inactive to control their usage.
4. What are the basic time elements in the production process?
A. Setup Time ✅
B. Alternate time
C. Build Time
D. Teardown time ✅
E. Processing time ✅
Rationale: Setup, processing (run) time, and teardown (cleanup) are core production time
elements.
5. Which of the following can be included in processing time?
A. Machine time ✅
B. Configuring work center
, ESTUDYR
C. Configuring equipment
D. Labor Time ✅
E. Setup Time
Rationale: Processing time covers machine and labor activities that actually produce the part
(not setup).
6. Which of the following are the general classifications of time elements in production?
A. Floating
B. Volatile
C. Fixed ✅
D. Explosive
E. Variable ✅
Rationale: Time elements are commonly classified as fixed (constant per setup) or variable
(scale with quantity).
7. The material master is grouped into different views or segments based on which factors?
A. Processes that use the material ✅
B. Material Type ✅
C. Organizational level ✅
D. Material Composition
E. Material description
Rationale: Material master views are organized by process needs, material type and
organization (plant/storage).
8. Examples of production resource tools are:
A. Raw materials
B. Fixtures ✅
C. Engineering drawings ✅
D. Calibration instruments ✅
E. Warehouse building
Rationale: PRTs (production resource tools) include fixtures, drawings, instruments used in
operations.
9. A planned order is a formal request that indicates:
A. How many units of a product are needed ✅
B. Where the finished goods are to be shipped
C. What materials are needed ✅
D. Where the raw materials are stored
E. When the materials are needed ✅
Rationale: Planned orders specify quantity, component needs and timing for production
planning.