100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

3rd TSSA Part A2 - Test (III) 2025/2026 Exam Questions with Detailed Verified Answers (100% Correct Answers) | Already Graded A+

Puntuación
-
Vendido
-
Páginas
32
Grado
A+
Subido en
03-06-2025
Escrito en
2024/2025

3rd TSSA Part A2 - Test (III) 2025/2026 Exam Questions with Detailed Verified Answers (100% Correct Answers) | Already Graded A+ What is the peak-to-peak value of an alternating current if the rms value is 12 A? -

Institución
TSSA
Grado
TSSA











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
TSSA
Grado
TSSA

Información del documento

Subido en
3 de junio de 2025
Número de páginas
32
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

3rd TSSA Part A2 - Test (III) 2025/2026
Exam Questions with Detailed Verified
Answers (100% Correct Answers) |
Already Graded A+



What is the peak-to-peak value of an alternating current if the rms value is

12 A? - 🧠ANSWER ✔✔33.94 A


Electrostatic precipitators have an efficiency of greater than: - 🧠ANSWER

✔✔95%


The purpose of the bolted-on jacket on some plug valves is to: - 🧠ANSWER

✔✔Add heating to a non-jacketed existing valve.


List the ways that butterfly valves can be installed into a piping system:

1. Welded.

2. Unions.

3. Flanged.


4. Wafer. - 🧠ANSWER ✔✔3, 4


COPYRIGHT©JOSHCLAY 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY
STATEMENT. ALL RIGHTS RESERVED
1

,Wet pipe sprinkler systems are found in:

1. Office buildings.

2. Stores.

3. Manufacturing facilities.

4. Hotels.


5. Health care facilities. - 🧠ANSWER ✔✔1, 2, 3, 4, 5


Which of these is the "Boiler, Pressure Vessel and Pressure Piping Code"

? - 🧠ANSWER ✔✔CSA B51


The maximum temperature of fluids handled by a diaphragm valve must be

below the temperature limit for the: - 🧠ANSWER ✔✔Diaphragm material


The most frequently used materials for power piping systems are:

1. Inconel 800 H.

2. Alloy steels.

3. Low carbon steels.

4. Galvanized steel.


5. Austenitic stainless steels - 🧠ANSWER ✔✔2, 3, 5


COPYRIGHT©JOSHCLAY 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY
STATEMENT. ALL RIGHTS RESERVED
2

,In a magnetic circuit, the magnetic flux is the equivalent of electric _____ in

an electric circuit. - 🧠ANSWER ✔✔Current


An insulating material may be defined as one which: - 🧠ANSWER

✔✔Transmits heat poorly


Clear definitions for terms and equipment relating to refrigeration and air

conditioning equipment are defined in the _____. - 🧠ANSWER ✔✔CSA-

B52

Armature reaction _____ the main field of a generator. - 🧠ANSWER

✔✔Distorts


Viscosity of fuel oil _____ as the temperature increases and becomes

nearly constant, above 120°C. - 🧠ANSWER ✔✔Decreases


The armature core in a DC machine is made of: - 🧠ANSWER ✔✔Soft iron

laminations.


The purpose of the AC kilovar meter is to: - 🧠ANSWER ✔✔Measure the

reactive power being generated by the AC generation system.

Calculate the maximum allowable working pressure, in kPa, for a watertube

boiler tube, which is 73.5 mm O.D. and has a minimum wall thickness of


COPYRIGHT©JOSHCLAY 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY
STATEMENT. ALL RIGHTS RESERVED
3

, 4.71 mm. The tube is strength-welded into place in the boiler and is located

in the furnace area of the boiler. Tube material is carbon steel, SA-192,

with a mean wall temperature of 280°C. - 🧠ANSWER ✔✔11.54 MPa.


Centrifugal type steam separators have _____ sets of baffles: - 🧠ANSWER

✔✔2


Arrange into correct sequence, the following steps in the typical start up of

a steam system.

1. Check that each trap is working properly, to prevent an unexpected

build-up of condensate in the steam line.

2. All low point drain valves must be opened wide. These are usually

located upstream of all the trap stations and the supply to steam turbines

inlet valves.

3. Continue opening the main header valve, as the steam pressure rises.

4. Crack open the bypass around the main header steam admission valve,

if so equipped. You should hear steam entering the header.

5. Check each low point drain for the presence of condensate.

6. If a bypass is not installed, crack open the main header steam admission

valve.

COPYRIGHT©JOSHCLAY 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY
STATEMENT. ALL RIGHTS RESERVED
4

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
JOSHCLAY West Governors University
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
224
Miembro desde
2 año
Número de seguidores
14
Documentos
17286
Última venta
8 horas hace
JOSHCLAY

JOSHCLAY EXAM HUB, WELCOME ALL, HERE YOU WILL FIND ALL DOCUMENTS & PACKAGE DEAL YOU NEED FOR YOUR SCHOOL WORK OFFERED BY SELLER JOSHCLAY

3.6

44 reseñas

5
18
4
7
3
9
2
5
1
5

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes